Resources
Training documents
Training Presentation | Published Date |
Design-Build 101, Part 1 of 2 | April 30, 2024 |
Design-Build 101, Part 2 of 2 | April 30, 2024 |
Training Presentation | Published Date |
DB Project Scheduling Overview | April 30, 2024 |
Notice to Proceed (NTP) and Commencement of Design and Construction Work | April 30, 2024 |
Draw Requests Process | April 30, 2024 |
Design and Submittal Review Process | April 30, 2024 |
Programmatic documents
Request for qualifications (RFQ) phase
RFQ documents
- Request for qualifications template
- Design-Build contract term sheet template
- Capital maintenance contract term sheet template
Request for proposals (RFP) phase
ITP documents
Design-Build contract documents
- Design-Build Agreement (DBA) template
- DBA General Conditions (Items 1-9)
- Design-Build Specifications (Item 1-28)
- Design-Build Specification Item 32-Performance Warranty
- Attachment 14-1 Utility Adjustment Forms
- Attachment 27-1 Performance and Measurement Table
- Attachment 27-2 Baseline Inspection Requirements
- Attachment 27-4 Maintenance Management Plan
- Attachment 32-1 Warranty Performance and Measurement Table
Capital maintenance contract documents
DB manuals
Procurement phase
Design & Construction phase
DB-related policies
Texas Administrative Code (TAC) references
- Design-Build Contracts - Conflict of Interest and Ethics Policies 43 TAC Rule 9.155
- Comprehensive Development Agreements - Conflict of Interest and Ethics Policies 43 TAC Rule 27.8