US 377 in Hood County
Skip to main content

US 377 in Hood County

Virtual public hearing with in-person option

Virtual: Tuesday, June 13, 2023, at 6 p.m. through Wednesday, June 28, 2023, at 11:59 p.m.

In-person: Tuesday, June 13, 2023 from 6 - 8 p.m.

Virtual public hearing presentations

Additional public hearing video content

Public comment deadline

All comments must be received on or before Wednesday, June 28, 2023.

Virtual details

The virtual public hearing will be posted below beginning Tuesday, June 13, 2023, at 6 p.m. and will remain online through Wednesday, June 28, 2023, at 11:59 p.m. Please note, this is not a live event. The materials can be viewed at your convenience.

Additionally, TxDOT is providing an in-person hearing for individuals who would like to participate in person instead of online. In-person attendees will be able to review the same materials and presentation as the online public hearing.

In-person details Tuesday, June 13, 2023
6 - 8 p.m.
Lake Granbury Conference Center
621 East Pearl St.
Granbury, TX 76048
Purpose

TxDOT Fort Worth District is proposing improvements to US 377 from Holmes Drive to 3,000 feet north of FM 167 (Fall Creek Highway), a distance of approximately 9 miles, in the City of Granbury, Hood County, Texas.

Description

US 377 between Holmes Drive and State Highway (SH) 144 would be converted from a rural highway to a four-lane urban highway with a raised median, enclosed drainage and curbs where appropriate.

The proposed project would:

  • Reconstruct and widen US 377 from SH 144 to north of FM 167 (Fall Creek Highway), from a four-lane divided highway to a six-lane divided highway
  • Include a raised, concrete-paved or vegetated median

Improvements are also proposed along SH 144 from Autumn Ridge Road to FM 51 (Paluxy Road) (CSJ 0080-03-049), a distance of approximately 0.4 mile. The proposed project also includes:

  • Improvements to cross street intersections
  • Improvements to ramps
  • Improvements to driveway connections
  • The addition of shared-use paths in each direction to accommodate bicyclists and pedestrians
  • Signalization
  • Drainage improvements

The proposed project would, subject to final design considerations, require approximately 25.2 acres of additional right of way (ROW) and 3.7 acres of permanent drainage easements. The project has the potential to be constructed in phases, with the SH 144 from Autumn Ridge Road to FM 51 (Paluxy Road) improvements being completed during the first phase of construction.

The proposed project would, subject to final design considerations, require additional ROW and potentially displace five non-residential structures. No residential displacements are proposed.

Accessibility

The virtual public hearing and in-person option will be conducted in English. If you need an interpreter or document translator because English is not your primary language or you have difficulty communicating effectively in English, one will be provided to you. If you have a disability and need assistance, special arrangements can be made to accommodate most needs. If you need interpretation or translation services or you are a person with a disability who requires an accommodation to attend and participate in the virtual public hearing or in-person option, please contact Marc Jansing at 817-370-6538, no later than 4 p.m. CT, Tuesday, June 6, 2023. Please be aware that advance notice is required as some services and accommodations may require time for TxDOT to arrange.

Hearing materials

Environmental documents

Public Hearing Displays

  • Schematic 1 – US 377 from south of Holmes Drive to south of Pirate Drive
  • Schematic 2 – US 377 from south of Pirate Drive to north of Brazos River Bridge
  • Schematic 3 – US 377 from north of Brazos River Bridge to north of Harbor Lakes Drive
  • Schematic 4 – US 377 from north of Harbor Lakes Drive to north of Old Granbury Road
  • Schematic 5 – US 377 from north of Old Granbury Road to south of FM 4/Meander Road
  • Schematic 6 – US 377 from south of FM 4/Meander Road to north of FM 167 (Temple Hall Highway)
  • Schematic 7 – US 377 from north of FM 167 (Temple Hall Highway) to north of FM 167 (Fall Creek Highway)
  • Schematic 8 – US 377 north of FM 167 (Fall Creek Highway)
  • Breakout project – US 377 from Pirate Drive to Overstreet Blvd

Videos (also included above below the presentation)

How to make a comment

Comments must be postmarked or otherwise received by Wednesday, June 28, 2023 to: TxDOT Fort Worth District Office, Attn: Dr. Francis A. Smith, P.E., 2501 S.W. Loop 820, Fort Worth, TX, 76133; by email as described in the public hearing notice.

Memorandum of Understanding The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated Dec. 9, 2019, and executed by the Federal Highway Administration and TxDOT.

Posted: May 24, 2023