Before a project is built, a study must be done to determine if it will fill a transportation need, will not negatively impact the surrounding area and fits the department's overall plan. During the study phase, potential projects are analyzed to determine if they are cost-effective while also efficiently improving mobility. Some of these projects have moved beyond the study phase and are under construction.

Location Project Description
El Paso FM 3255 (Martin Luther King Jr. Boulevard) Proposed advanced planning Corridor Study of Farm-to-Market (FM) 3255, also known locally as Martin Luther King Jr. Boulevard, from United States (US) 54 to the New Mexico (NM) state line in the City of El Paso.
El Paso Borderland Expressway Proposed construction would complete a route around the northeast side of El Paso.
El Paso Downtown 10 From Executive Center Boulevard to Loop 478 (Copia Street). The proposed project entails the I-10 reconstruction and widening the existing main lanes, providing continuous frontage roads with pedestrian and bicycle amenities, constructing retaining walls, bridges, and ramps, and reconfiguring cross streets.
El Paso FM 1281 Horizon Develop a corridor master plan for 9.4-mile section of Horizon Boulevard (FM 1281) from Alameda Avenue (SH 20) to Ascension Street.
El Paso FM 2185 Proposed Improvements The proposed improvements are part of a set of projects that would improve safety, reliability, and mobility throughout the energy sector.
El Paso I-10 Frontage Roads Proposed two-lane frontage roads in each direction along I-10 from Executive Center Blvd. to Sunland Park Dr.
El Paso I-10 Collector-Distributor Lanes Construct collector-distributor (c-d) lanes and improvements to the I-10 and US 85 interchange.
El Paso I-10 Connect Improve access from I-10 to Loop 375 (Border Highway) and provide access to Bridge of the Americas Port of Entry.
El Paso I-10 from Antonio to Mesa The proposed project entails the reconstruction and widening of the existing roadway to improve capacity, operation, circulation, and safety on I-10.
El Paso I-10 Operational Improvements Widen I-10 between Viscount Boulevard and Zaragoza Road.
El Paso Loop 375 - Border Highway East Improve regional mobility and safety as well as provide improved connectivity.
El Paso Loop 375 - Border Highway West Proposed construction of a new four-lane controlled access toll facility that connects Loop 375 to US 85.
El Paso Loop 375 - Franklin Mountains State Park Entrance Proposed Improvements to the entrance of Franklin Mountains State Park.
El Paso Loop 375 - Managed Lanes Widen the roadway with the construction of tolled lanes.
El Paso Loop 375 - Transmountain West Improvements from I-10 to east of the Franklin Mountains State Park Entrance.
El Paso Regional Mobility Strategy This study will focus on improving project design with multimodal solutions that contribute to both transportation mobility and economic vitality for the residents of the El Paso Region.
El Paso Reimagine I-10 Planning study for I-10 from Texas/New Mexico border to Tornillo.
El Paso Six-county multimodal study  A Six-county multimodal study to learn about mobility, transportation, and development challenges and opportunities within El Paso, Hudspeth, Culberson, Jeff Davis, Presidio, and Brewster counties. 
El Paso SH 20 Alameda Avenue Planning study of SH 20 (Texas/Alameda Avenue) from SH 20 (Mesa Street) in El Paso to Shaffer Road, south of Tornillo.
El Paso SH 20 Alameda/Paisano Intersection improvements to SH 20 at US 62.
El Paso SH 20 Doniphan Drive Develop a corridor plan for 15 miles of Doniphan Drive between the Texas and New Mexico state line and Racetrack Drive.
El Paso SH 20 Mesa Street A master plan of recommended multimodal solutions to upgrade the SH 20 corridor.
El Paso SH 178 (Artcraft Road) Project The purpose of the SH 178 (Artcraft Road) Project is to improve safety and reliability of travel time.
El Paso Spur 1966 A new connection between Schuster Avenue on the UTEP campus and Paisano Drive via a bridge over I-10.
Fabens FM 76 (North Loop Drive) Feasibility Study A corridor feasibility study for FM 76 (North Loop Drive) from FM 1281 (Horizon Boulevard) in El Paso to SH 20 (Alameda Avenue) in the city of Fabens
Presidio US 67 Develop a corridor plan for 142 miles of US 67, from I-10 west of Fort Stockton to the Presidio/Ojinaga Port of Entry on the US/Mexico border.