Search Results


2004

Special Provisions
SP447-001  PDF  RTF  Structural Bolting - Provides for faying surface preparation to be performed immediately prior to assembling a bolted connection. Required on all projects with Item 447 beginning with the January 2005 letting. Replaced by SP447-002 . (Change Memo: de-61-04). Statewide Use.

Search
Specification Information