Search Results


2004

Special Provisions
SP464-003  PDF  RTF  Reinforced Concrete Pipe - References DMS-7310, ''Reinforced Concrete Pipe Fabrication and Plant Qualification'' requirements, and removes the standard specification fabrication language now incorporated in the DMS. Required for all projects using Item 464, Reinforced Concrete Pipe, beginning with the September 2009 letting. Replaced by SP464-006 . (Change Memo: de-28-09). Statewide Use.

Search
Specification Information