Search Results


2004

Special Provisions
SP540-023  PDF  RTF  Metal Beam Guard Fence - Revises Article 540.2 Materials, Section B. Posts, Table 1, Rail Element Requirements to clarify the requirements of the permanent markings and Articles 540.3, and 540.4. These articles are also supplemented by standard sheet MBGF (SR)-11. Required for all projects beginning with the September 2010 letting. Replaces SP540-015 .Replaced by SP540-031 . (Change Memo: de-15-10). Statewide Use.

Search
Specification Information