|
2004 English Special Provisions by Item (All)
|
Specification Information
|
Search For a Special Provision or Specification
|
|
SP006-054 |
PDF |
RTF |
- For project 0508-01-351 in Harris County. Provides for the project soil and groundwater management plan.
One-Time Use.
|
SP006-053 |
PDF |
RTF |
- For project 0337-02-042 in Williamson County. For this project, Item, Item 006, “Control of Materials,” of the Standard Specifications is amended hereby with respect to the clauses cited below, and no other clauses or requirements of this Item are waived or changed hereby.
One-Time Use.
|
SP006-052 |
PDF |
RTF |
- For project 0197-02-122 in Dallas County. For this project, Item 006, “Control of Materials,” of the Standard Specifications, is hereby amended with respect to the clauses cited below, and no other clauses or requirements of this Item are waived or changed hereby.
One-Time Use.
|
SP006-051 |
PDF |
RTF |
- For project 8170-12-001 in Harris County. Changes are to include Section 6.10.A.1.b ''Other Contracts'' in paragraph 2 under Article 6.10. Hazardous Materials and to change responsibility for stripping locations from design plans to Contractor under Section 6.10.A.1.B.
One-Time Use.
|
SP006-050 |
PDF |
RTF |
- For project 0508-01-276 in Harris County. Includes the requirements of 006---030 which informs the Contractor that TxDOT will abate lead or asbestos separately from the prime contract.
One-Time Use.
|
SP006-049 |
PDF |
RTF |
- For project 0912-72-075 in Harris County. This special provision supplements Article 6.10 and contains the Soil and Groundwater Management Plan (SGMP) for the project.
One-Time Use.
|
SP006-048 |
PDF |
RTF |
- For project 0912-71-896 in Harris County. This special provision supplements Article 6.10 and contains the Asbestos Abatement Plan for the project.
One-Time Use.
|
SP006-047 |
PDF |
RTF |
- Allows contractors the option to choose either the Department or a Department-selected Commercial Lab for conducting the subset of project-level sampling and testing. Required on all projects beginning with the March 2013 letting. Contractors choosing Department-selected Commercial Labs will reimburse the Department through a reduction in the monthly progress payment.
(Change Memo: de-34-12). Statewide Use.
|
SP006-046 |
PDF |
RTF |
- For project 0674-01-037 in El Paso County. Adds requirements of a Soil and Groundwater Management Plan.
One-Time Use.
|
SP006-045 |
PDF |
RTF |
- For project 0914-00-301, 0914-00-314 in Travis County. Provides additional information on materials.
One-Time Use.
|
SP006-044 |
PDF |
RTF |
- For project 6221-53-001 in Jefferson County. “Control of Materials,” of the Standard Specifications, is hereby amended with respect to the clauses cited below, and no other clauses or requirements of this Item are waived or changed hereby.
One-Time Use.
|
SP006-043 |
PDF |
RTF |
- For project 6221-37-001, 6221-53-001 in Jefferson County. For this project, Item 006, “Control of Materials,” of the Standard Specifications, is hereby amended with respect to the clauses cited below, and no other clauses or requirements of this Item are waived or changed hereby.
One-Time Use.
|
SP006-042 |
PDF |
RTF |
- For project 0173-04-025 in Kaufman County. For this project, Item 006, “Control of Materials,” of the Standard Specifications, is hereby amended with respect to the clauses cited below, and no other clauses or requirements of this Item are waived or changed hereby.
One-Time Use.
|
SP006-041 |
PDF |
RTF |
- For project 0914-00-307 in Travis County. Modifies ''Source Control.''
One-Time Use.
|
SP006-040 |
PDF |
RTF |
- For project 8000-15-012 in Bexar County. Provides specifics for waste control.
One-Time Use.
|
SP006-039 |
PDF |
RTF |
- For project 0904-02-035 in Potter County. Adds Soil and Groundwater Management Plan (SGMP).
One-Time Use.
|
SP006-038 |
PDF |
RTF |
- For project 6201-14-001 in McLennan County. Makes the Contractor responsible for hazardous materials.
One-Time Use.
|
SP006-037 |
PDF |
RTF |
- For project 0015-13-317 in Travis County. For this project, Item 6, “Control of Materials”, of the Standard Specifications, is hereby amended with respect to the clauses cited below and no other clauses or requirements of this Item are waived or changed hereby.
One-Time Use.
|
SP006-036 |
PDF |
RTF |
- For project 0903-03-086 in Wichita County. Soil and Groundwater Management Plan.
One-Time Use.
|
SP006-035 |
PDF |
RTF |
- For project 1801-01-042 in Cameron County. Removed conflict with our Statewide required Sp 006-030, by adding additional responsibilitiy on the contractor to execute Soil Groundwater Management Plan.
One-Time Use.
|
SP006-034 |
PDF |
RTF |
- For project 2964-01-031 in Dallas County. Special Provision supplements Article 6.10 and applies the Soil and Groundwater Management.
One-Time Use.
|
SP006-033 |
PDF |
RTF |
- For project 1801-01-042 in Cameron County. Soil and Groundwater Contamination have been detected within the limits of the project. The Contractor is hereby notified to follow the guidelines as stated in the Soil and Groundwater Management Plan (SGMP).
One-Time Use.
|
SP006-032 |
PDF |
RTF |
- For project 3125-01-010 in Tarrant County. Provides additional guidance for handling hazardous materials.
One-Time Use.
|
SP006-031 |
PDF |
RTF |
- Modifies Article 6.9., Recycled Materials that conflicted with DMS-11000. Includes the requirements of 006---028 which modifies Article 6.10., Hazardous Materials requiring the Contractor to remove the hazardous materials. May be used in place of 006-030. Should only be used for specialty contracts to remove or abate asbestos. This SP will also work for lead abatement or removal contracts. Do not include this SP in general CST and MNT contracts.
Replaces SP006-028 . (Change Memo: de-03-07). Statewide Use.
|
SP006-030 |
PDF |
RTF |
- Modifies Article 6.9, Recycled Materials that conflicted with DMS-11000. Includes the requirements of 006---029 which informs the Contractor that TxDOT will abate lead or asbestos separately from the prime contract. Required on all projects beginning with the May 2007 letting except when 006---031 is used.
Replaces SP006-029 . (Change Memo: de-02-07). Statewide Use.
|
SP006-029 |
PDF |
RTF |
- Informs the Contractor the TxDOT will abate lead or asbestos separately from the prime contract. It also covers painting projects where the primary work is to remove lead paint and repaint a structure. Required on all projects beginning with the March 2007 letting except when SP 006---028 is used.
Replaces SP006-023 .Replaced by SP006-030 . (Change Memo: de-48-06). Statewide Use.
|
SP006-028 |
PDF |
RTF |
- Modifies Article 6.10 thus requiring the Contractor to remove the hazardous materials. This SP will also work for lead abatement or removal contracts. Should only be used for the specialty contracts to remove or abate asbestos. Do not include in our general construction and maintenance contracts.
Replaced by SP006-031 . (Change Memo: de-50-06). Statewide Use.
|
SP006-027 |
PDF |
RTF |
- For project 6154-53-001 in Fort Bend County. Notify the Engineer immediately when a visual observation or odor indicates that materials on sites owned or controlled by the Department may contain hazardous materials.
One-Time Use.
|
SP006-026 |
PDF |
RTF |
- Provides a price list for items sold to the Contractor by the Department. Replaces SP 006---013 beginning with the January 2007 letting.
Replaces SP006-013 . (Change Memo: de-39-06). Statewide Use.
|
SP006-025 |
PDF |
RTF |
- For project 0140-08-021 in Crockett County. Notify the Engineer immediately when a visual observation or odor indicates that materials in required material sources or on sites owned or controlled by the Department may contain hazardous materials.
One-Time Use.
|
SP006-024 |
PDF |
RTF |
- For project 0151-09-036 in Travis County. Material and equipment submittals will be organized by subsystem and submitted in the order listed in the plans and specifications.
One-Time Use.
|
SP006-023 |
PDF |
RTF |
- Provides for removal of an existing paint containing lead or other hazardous materials. Required for construction and maintenance projects requiring cleaning and painting of existing structural steel and/or removal/disposal of structural steel.
Replaced by SP006-029 . (Change Memo: de-31-06). Statewide Use.
|
SP006-022 |
PDF |
RTF |
- For project 0912-71-641 in Harris County. Addresses the hazardous waste material requirements.
One-Time Use.
|
SP006-021 |
PDF |
RTF |
- For project 0017-09-072 in Bexar County. When the Contractor encounters existing materials on sites owned or controlled by the State or in required material sources that are suspected by visual observation or smell to contain hazardous materials/waste.
Replaces SP006-020 . One-Time Use.
|
SP006-020 |
PDF |
RTF |
- For project 0017-09-072 in Bexar County. When the Contractor encounters existing materials on sites owned or controlled by the State or in required material sources that are suspected by visual observation or smell to contain hazardous materials/waste, notify the Engineer.
Replaced by SP006-021 . One-Time Use.
|
SP006-019 |
PDF |
RTF |
- For project 0027-08-143 in Fort Bend County. A Contractor Contingency Plan for Soil and Water Management Plan (SWMP) has been prepared for this project.
One-Time Use.
|
SP006-018 |
PDF |
RTF |
- VOID - DO NOT USE. Use Materials that are free of hazardous materials as defined in Item 1. Required on all construction and maintenance projects beginning with the December 2005 letting.
(Change Memo: de-36-05). Statewide Use.
|
SP006-017 |
PDF |
RTF |
- For project 0918-45-415 in Dallas County. Notify the Engineer immediately when a visual observation or odor indicates that materials in required material sources or on sites owned or controlled by the Department may contain hazardous materials.
One-Time Use.
|
SP006-016 |
PDF |
RTF |
- For project 0914-19-010 in Gillespie County. Notify the Engineer immediately when a visual observation or odor indicates that materials in required material sources or on sites owned or controlled by the Department may contain hazardous materials.
One-Time Use.
|
SP006-015 |
PDF |
RTF |
- For project 0290-01-036 in Llano County. Use materials that are free of hazardous materials as defined in Item 1, Definition of Terms.
One-Time Use.
|
SP006-014 |
PDF |
RTF |
- For project 0912-37-117 in Montgomery County. Use materials that are free of hazardous materials as defined in Item 1, Definition of Terms.
One-Time Use.
|
SP006-013 |
PDF |
RTF |
- Provides price list for items sold to the Contractor by the Department. Replaces 006-004 beginning with the October 2005 letting.
Replaces SP006-004 .Replaced by SP006-026 . (Change Memo: de-34-05). Statewide Use.
|
SP006-012 |
PDF |
RTF |
- For project 0310-01-036 in Donley County. Except for paint or coatings on structures, notify the Engineer immediately when a visual observation or odor indicates that materials in required material sources or on sites owned or controlled by the Department may contain hazardous materials.
One-Time Use.
|
SP006-011 |
PDF |
RTF |
- For project 0014-24-049, 0031-03-029 in Collingsworth, Hill Counties. Except for paint or coatings on structures, notify the Engineer immediately when a visual observation or odor indicates that materials in required material sources or on sites owned or controlled by the Department may contain hazardous materials.
One-Time Use.
|
SP006-010 |
PDF |
RTF |
- For project 0090-02-048 in Oldham County. Update of hazardous materials requirements.
One-Time Use.
|
SP006-009 |
PDF |
RTF |
- For project 0320-01-059 in Bell County. Hazardous Materials. When the plans specify the removal of an existing paint containing lead or other hazardous materials, the Contractor is responsible to perform the work in accordance with Item 446, Cleaning and Painting Steel.
One-Time Use.
|
SP006-008 |
PDF |
RTF |
- For project 2250-01-021 in Denton County. Soil and Groundwater Management Plan
One-Time Use.
|
SP006-007 |
PDF |
RTF |
- For project 0140-08-021 in Crockett County. Update hazardous materials requirements.
One-Time Use.
|
SP006-006 |
PDF |
RTF |
- For project 0917-12-065 in Milam County. Update of hazardous materials requirements.
One-Time Use.
|
SP006-005 |
PDF |
RTF |
- For project 0368-02-040 in Jefferson County. Adds Soil and Groundwater Management Plan (SGMP).
One-Time Use.
|
SP006-004 |
PDF |
RTF |
- Provides price list for items sold to the Contractor by the Department. Replaces 006-001 beginning with the March 2005 letting.
Replaces SP006-001 .Replaced by SP006-013 . (Change Memo: de-86-04). Statewide Use.
|
SP006-003 |
PDF |
RTF |
- Provides for charging the Contractor for testing done at their convenience. May be used at the districts option.
(Change Memo: de-29-04). Statewide Use.
|
SP006-002 |
PDF |
RTF |
- Adds the requirement that the Contractor furnish a copy of the purchase order showing the delivery date.
(Change Memo: de-24-04). Statewide Use.
|
SP006-001 |
PDF |
RTF |
- Provides a price list for items sold to the Contractor by the Department.
Replaced by SP006-004 . (Change Memo: de-14-04). Statewide Use.
|