Page Options
Up Arrow
Statewide Long-Range Transportation Plan 2035 - FAQs
Why do we need a Statewide Transportation Plan?
The Statewide Long-Range Transportation Plan 2035 will analyze the existing conditions present for each mode, forecast future need and expand on existing performance measures to determine where gaps may exist. The plan:
  • Helps address future population and employment growth
  • Provides guidance on infrastructure needs and funding
  • Integrates various planning efforts into a single, measurable plan
  • Meets Federal requirements set forth by the Federal Highway Administration
How will the plan be developed?
The Statewide Long-Range Transportation Plan 2035 will:
What is different about this plan?
This plan looks at all modes of transportation together, including future needs for:
  • Highways
  • Inter-city Buses
  • Aviation/Air Access
  • Marine/Port Facilities
  • Freight/Passenger Rail
  • Bicycle/Pedestrian Facilities
  • Pipelines
  • Intelligent Transportation Systems
  • Intermodal Facilities
What are the key elements of the plan?
Key elements include:
  • 24-Year Planning Time Frame
  • Analysis of Existing Transportation System (all modes)
  • Analysis of Current Usage, Current Needs and Existing Funding
  • Public/Stakeholder Involvement
  • Projection of Future Needs by Mode
  • Addressing the 8 Planning Factors required by SAFTEA-LU
How can I participate?
Public Outreach activities will include:
  • Distribution of 3 newsletters with project updates and public meeting information
  • Open House-Style Public Meetings to be hosted by each of the 24 TxDOT districts in May and August
  • A Public Hearing to be held in Austin in October
How do I get more information or submit comments?
You may: