Monthly State Let Construction Report For Beaumont District As Of Jul 11, 2014 Page 1 Of 2

Last Update: Friday, July 11, 2014
FTP Icon
page 1 | page 2

Contract Identification and Information Length Contract Amount Amount This Estimate Total Estimate To Date % Comp

CountyLIBERTY
Highway US 90
From SH 61 IN DEVERS
To 4.0 MI W OF JEFFERSON CO. LINE
CSJ 0028-05-042
Proj ID STP 2013(796)MM
Work Type GR, BS, STR, PVMT, SIGN
 
5.440 20677586.40 430267.67 3158022.57 15.2
Work Order 09-11-13
Work Began 12-12-13
Work Completed  
Time Computed 09-27-13
Contract Working Days 540
Addl Days Granted 0
Working Days Charged 101
Percent Time Used 18
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0028-05-042
AMERICAN REMEDIATION OPTIONS, INC. (1.47%)
BREDA COMPANY, INC.(7.31%)
CPAVE, INC.(0.32%)
NORMAN HIGHWAY CONSTRUCTORS, INC.(8.78%)
PRIMATE CONSTRUCTION, INC. (0.07%)
ROADSAFE TRAFFIC SYSTEMS, INC. (0.64%)
TEX OP CONSTRUCTION, LP(0.72%)
TEXAS LAND CLEARING, INC.(1.34%)
SIEMENS INDUSTRY, INC. (0.07%)
Contract # 06133002
Totals 20677586.40 430267.67 3158022.57 15.2

CountyORANGE
Highway IH 10
From AT NECHES RIVER BRIDGE
To (STR 002809065)
CSJ 0028-09-111
Proj ID BR 1102(477)
Work Type STR, LIGHTING
 
1.055 58877950.00 0.00 22305149.19 37.8
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 03-16-12
Work Began 06-25-12
Work Completed  
Time Computed 00-00-00
Contract Working Days 1,085
Addl Days Granted 7
Working Days Charged 611
Percent Time Used 55
Contractor(s)
WILLIAMS BROTHERS CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0028-09-111
AMERICAN REMEDIATION OPTIONS, INC. (0.06%)
ESSARY, HART & MACWILIAM,INC.(6.77%)
SCOTT DERR PAINTING CO (0.35%)
HIGHWAY INTELLIGENT TRAFFIC SYSTEMS, CORP. (1.85%)
CARTHAGE DRILLING, INC.(0.14%)
HIGHWAY PAVEMENT SPECIALTIES, INC. (0.11%)
SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC (0.16%)
INTERSTATE BARRICADES & MARKINGS, INC. (0.48%)
BORE TECH CONSTRUCTION, LLC(0.00%)
C PAVE, INC. (0.04%)
ASHTON SAWING AND DRILLING LLC (0.10%)
ROADWAY CONSTRUCTION, LLC(0.00%)
Contract # 02123001
Totals 58877950.00 0.00 22305149.19 37.8

CountyJEFFERSON
Highway IH 10
From 11TH ST, EAST
To PINE ST (FRONTAGE ROADS)
CSJ 0028-13-132
Proj ID IM 0108(178)
Work Type GRIND CONC PAV, FDR, & SEAL JOINTS
 
1.746 952216.95 66103.55 711957.13 79.8
Work Order 06-12-13
Work Began 09-22-13
Work Completed  
Time Computed 06-28-13
Contract Working Days 60
Addl Days Granted 0
Working Days Charged 139
Percent Time Used 231
Contractor(s)
INTERSTATE IMPROVEMENT, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0028-13-132
AMERICAN TRAFFIC CONTROL, INC. (0.21%)
CRABTREE BARRICADE SYSTEMS, INC. (6.21%)
ISI CONTRACTING, INC.( 21.04%)
SCR CONSTRUCTION CO., INC. (9.99%)
TEX OP CONSTRUCTION, LP(0.70%)
Contract # 04133221
Totals 952216.95 66103.55 711957.13 79.8

CountyJEFFERSON
Highway IH 10 ETC
From US 90, EAST
To 3.391 MI E OF US 90
CSJ 0028-13-133
Proj ID STP 2014(946)HESG
Work Type PROF PAV MRKRS
 
35.985 381017.52 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 60
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
CRABTREE BARRICADE SYSTEMS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0028-13-133
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 07143027
Totals 381017.52 0.00 0.00 0.0

CountyORANGE
Highway IH 10
From AT LITTLE CYPRESS BAYOU
To (STR 002814069)AND(STR 002814068)
CSJ 0028-14-100
Proj ID BR 2013(443)
Work Type REPLACE BRIDGE AND APPROACHES
 
0.189 5064499.67 -207516.25 191677.50 3.7
CountyORANGE
Highway IH 10
From W OF ADAMS BAYOU, EAST
To W OF SABINE RIVER BRIDGE
CSJ 0028-14-108
Proj ID IM 0108(184)
Work Type GR, STR, BS, PVMT, SIGN
 
3.669 47282929.25 5667628.20 8394228.20 17.7
CountyORANGE
Highway IH 10
From AT SH 87 AND T&NO RR
To (STR 002814108 & 109)
CSJ 0028-14-109
Proj ID BR 2013(226)
Work Type GR, BS, PVMT & STR
 
0.322 16093789.78 1847534.21 1848018.32 11.4
Work Order 03-18-14
Work Began 05-30-14
Work Completed  
Time Computed 04-03-14
Contract Working Days 679
Addl Days Granted 0
Working Days Charged 19
Percent Time Used 2
Contractor(s)
WILLIAMS BROTHERS CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0028-14-109
A-1 EROSION CONTROL, LLC (0.16%)
ALLSTATE SIGNAL & CONSTRUCTION, LLC(1.08%)
AMERICAN REMEDIATION OPTIONS, INC. (0.16%)
BORTUNCO (0.58%)
DAVIS TREE EXPERTS (0.11%)
HIGHWAY PAVEMENT SPECIALTIES, INC. (0.23%)
MESA ROD BUSTERS, INC. (7.03%)
ROADSAFE TRAFFIC SYSTEMS, INC. (0.45%)
SCOTT DERR PAINTING CO, LLC(0.05%)
SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC (0.80%)
TRAF-TEX, INC. (0.97%)
ROADWAY CONSTRUCTION, LLC(0.31%)
Contract # 02143032
Totals 68441218.70 7307646.16 10433924.02 15.2

CountyHARDIN
Highway BU 96-F ETC
From BNSF RR IN SILSBEE, SOUTH
To US 96 S. OF SILSBEE
CSJ 0065-14-023
Proj ID STP 2014(316)
Work Type SEAL COAT
 
183.803 8159060.81 3013114.98 7792326.73 95.5
Work Order 01-30-14
Work Began 04-28-14
Work Completed  
Time Computed 04-28-14
Contract Working Days 45
Addl Days Granted 0
Working Days Charged 33
Percent Time Used 73
Contractor(s)
CLARK CONSTRUCTION OF TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0065-14-023
INTERSTATE BARRICADES & MARKINGS, INC. ( 13.58%)
Contract # 12133006
Totals 8159060.81 3013114.98 7792326.73 95.5

CountyHARDIN
Highway FM 3513 ETC
From EAST CHANCE CUT-OFF
To MITCHELL RD
CSJ 0065-15-004
Proj ID STP 2014(804)HES
Work Type TXT SHLDRS
 
90.981 380497.98 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 05-06-14
Work Began 00-00-00
Work Completed  
Time Computed 05-22-14
Contract Working Days 45
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
STRIPE-A-ZONE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0065-15-004
BRYDL CONTRACTING, INC.(5.41%)
COWBELL TRAFFIC SERVICES, INC. ( 33.53%)
Contract # 04143031
Totals 380497.98 0.00 0.00 0.0

CountyLIBERTY
Highway LP 573
From US 59 (N JUNCTION), SOUTH
To US 59 (S JUNCTION)
CSJ 0177-04-008
Proj ID STP 2014(412)
Work Type ACP
 
3.512 2438541.17 863997.73 2358212.84 96.7
Work Order 03-14-14
Work Began 03-31-14
Work Completed  
Time Computed 03-30-14
Contract Working Days 56
Addl Days Granted 0
Working Days Charged 45
Percent Time Used 80
Contractor(s)
SMITH & COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0177-04-008
COX PAVING COMPANY OF TEXAS, INC.( 10.39%)
TEX OP CONSTRUCTION, LP(3.98%)
CPAVE, INC.( 21.79%)
ROADSAFE TRAFFIC SYSTEMS, INC. (4.22%)
CURB TECH(0.18%)
Contract # 02143018
Totals 2438541.17 863997.73 2358212.84 96.7

CountyTYLER
Highway US 69
From CR 1040 (NORTH)
To 0.518 MILES SOUTH OF CR 1040(NORTH)
CSJ 0200-07-051
Proj ID STP 2014(511)
Work Type GR, BS, PVMT
 
0.518 540358.55 54369.46 55844.46 10.3
Work Order 05-01-14
Work Began 00-00-00
Work Completed  
Time Computed 05-17-14
Contract Working Days 31
Addl Days Granted 0
Working Days Charged 22
Percent Time Used 70
Contractor(s)
MOORE BROTHERS CONSTRUCTION COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0200-07-051
WEST TEXAS RUMBLE STRIP(0.64%)
CRABTREE BARRICADE SYSTEMS, INC. (1.96%)
L. S. EQUIPMENT CO., INC.( 15.44%)
AMERICAN REMEDIATION OPTIONS, INC. (1.55%)
DUSTROL, INC.(2.03%)
Contract # 03143028
Totals 540358.55 54369.46 55844.46 10.3

CountyJEFFERSON
Highway US 69
From 700 FT SOUTH OF LUCAS DRIVE, SOUTH
To IH 10
CSJ 0200-11-098
Proj ID NH 2013(224)
Work Type GR, BS, PVMT, STR
 
1.515 13432254.89 245631.81 5852362.18 43.5
CountyJEFFERSON
Highway US 69
From SH 105, SOUTH
To 700 FT SOUTH OF LUCAS DRIVE
CSJ 0200-11-100
Proj ID NH 2013(224)
Work Type GR, BS, PVMT, STR
 
1.932 13958606.78 164608.24 2337991.79 16.7
Work Order 10-07-13
Work Began 01-13-14
Work Completed  
Time Computed 10-23-13
Contract Working Days 636
Addl Days Granted 5
Working Days Charged 58
Percent Time Used 9
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0200-11-100
AMERICAN REMEDIATION OPTIONS, INC. (2.07%)
ANALYTICAL TECHNOLOGY CONSULTANTS, INC.(7.70%)
CPAVE, INC.(1.22%)
CRABTREE BARRICADE SYSTEMS, INC. (1.30%)
DUSTROL, INC.(2.04%)
J & M CONTRACTING, COMPANY (5.49%)
SCHNABEL FOUNDATION COMPANY(0.66%)
WEBBER BARRIER SERVICES, LLC.(2.97%)
CKORP, LLC (0.25%)
RAMCO GROUP, LLC (0.05%)
NORMAN HIGHWAY CONSTRUCTORS, INC.(0.10%)
HOLES INCORPORATED (0.04%)
AR DANIEL CONSTRUCTION SERVICES, INC.(0.16%)
W. W. FOUNDATION DRILLING, LTD.(0.81%)
BAY CITY TRAFFIC (0.03%)
PANTHER DRILLING AND FOUNDATION REPAIR (0.32%)
TX DOWN UNDER CONSTRUCTION LLC (0.04%)
Contract # 07133205
Totals 27390861.67 410240.05 8190353.97 29.9

CountyJEFFERSON
Highway US 69
From AT TEXACO CANAL
To (S030620016144)
CSJ 0200-16-014
Proj ID BR 2013(855)
Work Type REPLACE BRIDGE AND APPROACHES
 
0.743 1456176.70 0.00 215519.20 14.8
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 10-07-13
Work Began 03-05-14
Work Completed  
Time Computed 00-00-00
Contract Working Days 122
Addl Days Granted 0
Working Days Charged 47
Percent Time Used 38
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0200-16-014
TEX OP CONSTRUCTION, LP(2.25%)
AMERICAN REMEDIATION OPTIONS, INC. (3.89%)
CRABTREE BARRICADE SYSTEMS, INC. (2.10%)
Contract # 07133225
Totals 1456176.70 0.00 215519.20 14.8

CountyLIBERTY
Highway SH 61
From 0.668 MILES NORTH OF FM 1410, SOUTH
To 0.596 MILES NORTH OF FM 1410
CSJ 0242-01-026
Proj ID STP 2014(341)
Work Type GR, BS, ACP
 
0.072 40163.27 24454.54 25138.54 62.5
CountyLIBERTY
Highway SH 61
From 0.6 MI N OF FM 1410, SOUTH
To CHAMBERS CO/L
CSJ 0242-02-023
Proj ID STP 2014(341)
Work Type WDN SUBGR, ACP, OCST
 
4.666 2497173.86 375104.16 503913.99 20.1
Work Order 02-13-14
Work Began 00-00-00
Work Completed  
Time Computed 03-01-14
Contract Working Days 79
Addl Days Granted 0
Working Days Charged 26
Percent Time Used 32
Contractor(s)
A. L. HELMCAMP, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0242-02-023
WEST TEXAS RUMBLE STRIP(0.17%)
CRABTREE BARRICADE SYSTEMS, INC. (1.38%)
AMERICAN REMEDIATION OPTIONS, INC. (1.07%)
Contract # 01143017
Totals 2537337.13 399558.70 529052.53 20.8

CountyORANGE
Highway SH 62
From FM 1078
To 0.122 MILES SOUTH OF FM 1078
CSJ 0243-03-061
Proj ID CM 1402(095)
Work Type GR, BS, STR, PVMT
 
0.122 140492.90 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 30
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0243-03-061
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 07143053
Totals 140492.90 0.00 0.00 0.0

CountyNEWTON
Highway SH 87
From FM 363, SOUTH
To 4.4 MI
CSJ 0305-02-046
Proj ID STP 2014(413)
Work Type PVMT RPR, OCST, ACP
 
4.386 2097070.24 904713.05 1371234.10 65.3
CountyNEWTON
Highway SH 87
From 4.4 MI S OF FM 363, SOUTH
To FM 1004
CSJ 0305-03-040
Proj ID STP 2014(413)
Work Type PVMT RPR, OCST, ACP
 
1.111 608454.09 238809.31 289650.99 47.6
Work Order 03-12-14
Work Began 04-28-14
Work Completed  
Time Computed 03-28-14
Contract Working Days 60
Addl Days Granted 0
Working Days Charged 31
Percent Time Used 51
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0305-02-046
AMERICAN REMEDIATION OPTIONS, INC. (1.04%)
DUSTROL, INC.(4.41%)
CPAVE, INC.(0.86%)
CRABTREE BARRICADE SYSTEMS, INC. (2.49%)
Contract # 02143216
Totals 2705524.33 1143522.36 1660885.09 61.3

CountyORANGE
Highway SH 73
From AT COW BAYOU
To .
CSJ 0306-01-059
Proj ID BR 2013(920)
Work Type REPAIR BRIDGE
 
0.616 9509229.88 501005.00 3175836.14 33.3
Work Order 10-30-13
Work Began 01-31-14
Work Completed  
Time Computed 11-15-13
Contract Working Days 476
Addl Days Granted 0
Working Days Charged 107
Percent Time Used 22
Contractor(s)
GIBSON & ASSOCIATES, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0306-01-059
APAC-TEXAS, INC. (1.67%)
CRABTREE BARRICADE SYSTEMS, INC. (0.84%)
DUSTROL, INC.(0.20%)
INTECH CONTRACTING LLC ( 12.59%)
IOWA BRIDGE & CULVERT, LC( 16.80%)
LLOYD D. NABORS DEMOLITION LLC (1.17%)
RUSSELL MARINE, LLC( 11.46%)
UNDERWATER SERVICES, INC.(1.22%)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(0.57%)
TX TINMAN ENTERPRISES, LLC.(8.01%)
L D CONSTRUCTION (2.39%)
MUSTANG COLT SERVICES, INC.(4.30%)
Contract # 08133252
Totals 9509229.88 501005.00 3175836.14 33.3

CountyJEFFERSON
Highway SH 87
From AT CRANE BAYOU
To (STR 030603027)
CSJ 0306-03-120
Proj ID BR 2013(856)
Work Type REPLACE BRIDGE AND APPROACHES
 
0.100 2487698.29 15931.64 646077.89 25.9
CountyJEFFERSON
Highway SH 73
From 25 ST @ CRANE BAYOU LATERAL
To (STR 050804166)
CSJ 0508-04-155
Proj ID BR 2013(856)
Work Type STR
 
0.100 308554.08 88246.58 469060.18 99.9
Work Order 10-07-13
Work Began 12-03-13
Work Completed  
Time Computed 10-23-13
Contract Working Days 356
Addl Days Granted 0
Working Days Charged 78
Percent Time Used 21
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0306-03-120
CRABTREE BARRICADE SYSTEMS, INC. (2.13%)
AMERICAN REMEDIATION OPTIONS, INC. (2.32%)
NORMAN HIGHWAY CONSTRUCTORS, INC.( 35.12%)
M & D FOUNDATION DRILLING INDUSTRIES, INC. (4.04%)
PRIMATE CONSTRUCTION, INC. (0.22%)
CERTIFIED PLACERS LLC(0.24%)
Contract # 07133024
Totals 2796252.37 104178.22 1115138.07 39.8

CountyJEFFERSON
Highway SH 73
From AT RAINBOW BRIDGE
To (STR 030603015)
CSJ 0306-03-123
Proj ID NH 2014(978)
Work Type CLEAN AND REPAINT BRIDGE
 
1.460 26599824.20 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 614
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
SAFFO CONTRACTORS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0306-03-123
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 07143202
Totals 26599824.20 0.00 0.00 0.0

CountyNEWTON
Highway SH 12
From NEWTON CO/L
To SH 87
CSJ 0499-02-029
Proj ID STP 2014(593)
Work Type PLANE, SMA, STRIPE
 
3.094 1990411.83 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 05-07-14
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 31
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0499-02-029
CPAVE, INC.(2.76%)
DUSTROL, INC.(9.83%)
CRABTREE BARRICADE SYSTEMS, INC. (1.56%)
Contract # 04143014
Totals 1990411.83 0.00 0.00 0.0

CountyORANGE
Highway SH 12
From SH 62
To NEWTON CO/L
CSJ 0499-03-057
Proj ID STP 2014(803)
Work Type PLANE, SMA, STRIPE
 
3.859 2279714.00 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 05-07-14
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 25
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0499-03-057
DUSTROL, INC.( 10.11%)
CRABTREE BARRICADE SYSTEMS, INC. (1.56%)
Contract # 04143232
Totals 2279714.00 0.00 0.00 0.0

CountyJEFFERSON
Highway SP 215
From SH 73, EAST
To 0.794 MI W OF SH 87
CSJ 0508-06-020
Proj ID STP 2014(509)
Work Type FDR, BS, MILL, OVERLAY
 
1.371 1979708.80 107821.00 295901.10 14.9
Work Order 04-02-14
Work Began 05-02-14
Work Completed  
Time Computed 04-18-14
Contract Working Days 75
Addl Days Granted 0
Working Days Charged 32
Percent Time Used 42
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0508-06-020
AMERICAN REMEDIATION OPTIONS, INC. (6.15%)
CRABTREE BARRICADE SYSTEMS, INC. (1.57%)
CPAVE, INC.( 24.56%)
DUSTROL, INC.(4.06%)
PINNACLE GRINDING & GROOVING, LLC(4.03%)
Contract # 02143031
Totals 1979708.80 107821.00 295901.10 14.9