Monthly State Let Construction Report For San Angelo District As Of Feb 10, 2017 Page 1 Of 2

Last Update: Friday, February 10, 2017
FTP Icon
page 1 | page 2

Contract Identification and InformationLengthContract AmountAmount This EstimateTotal Estimate To Date% Comp

CountyRUNNELS
HighwayUS 83
FromAT ELM CREEK AND AT RAILROAD/FM 382
To.
CSJ0034-05-039
Proj IDBR 2015(182)
Work TypeREHABILITATE BRIDGES
 
0.20014622336.5712336706.9984.3
Work Order01-02-15
Work Began01-26-15
Work Completed
Time Computed01-26-15
Contract Working Days304
Addl Days Granted102
Working Days Charged405
Percent Time Used99
Contractor(s)
J. H. STRAIN & SONS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0034-05-039
S & S BRIDGE PAINTING, INC. (13.95)
CONTRACTORS SERVICE COMPANY (0.42)
WILLIS ELECTRIC CO., LP (1.99)
CHOCTAW ERECTORS, INC. (2.70)
RICE ENVIRONMENTAL SERVICES (0.46)
AARON CONCRETE CONTRACTORS, L.P. (3.60)
W. W. FOUNDATION DRILLING, LTD. (2.38)
DOUBLE A CONTRACTING, L.P. (0.55)
RUNNING HORSE CONSTRUCTION, INC. (1.23)
MCL CONTRACTING, LLC (1.52)
KLP COMMERCIAL, LLC (5.37)
STRAIGHT LINE SAWING & SEALING (0.20)
MCL CONTRACTING, LLC (0.11)
HJC FARMS, INC. (0.15)
MICA CORPORATION (0.87)
Contract #10143203
Totals14622336.57261559.5812336706.9984.3

CountyKIMBLE
HighwayUS 83
FromAT IH 10 FRONTAGE ROADS IN JUNCTION
To.
CSJ0035-07-044
Proj IDSTP 2016(566)
Work TypeCONSTRUCT TRAFFIC SIGNALS
 
0.1261487816.871478943.4399.9
Work Order03-01-16
Work Began06-20-16
Work Completed
Time Computed05-30-16
Contract Working Days80
Addl Days Granted0
Working Days Charged128
Percent Time Used160
Contractor(s)
RELMCO, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0035-07-044
THE LEVY COMPANY, L.P. (23.99)
LONE STAR PAVING (16.63)
FLASHER EQUIPMENT COMPANY (4.02)
Contract #01163229
Totals1487816.8796819.991478943.4399.9

CountyREAL
HighwayUS 83
FromRM 336
ToRM 337 IN LEAKEY
CSJ0036-05-033
Proj IDSTP 2015(350)
Work TypeREHABILITATE EXISTING ROAD
 
2.0556989144.865029656.6971.9
Work Order01-28-15
Work Began06-08-15
Work Completed
Time Computed05-29-15
Contract Working Days225
Addl Days Granted23
Working Days Charged204
Percent Time Used82
Contractor(s)
ALLEN KELLER COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0036-05-033
RELMCO, INC. (14.97)
FUQUAY, INC. (0.36)
PELTZ COMPANIES, INC. (26.55)
THE LEVY COMPANY, L.P. (0.36)
TEXAS CUTTING & CORING, INC. (1.33)
Contract #12143021
Totals6989144.86197630.205029656.6971.9

CountyGLASSCOCK
HighwayUS 87
FromHOWARD COUNTY LINE
ToSTERLING COUNTY LINE
CSJ0069-02-028
Proj IDNH 2015(931)
Work TypeACP OVERLAY
 
29.99715257441.6615939914.7299.9
Work Order05-19-15
Work Began09-30-15
Work Completed
Time Computed08-19-15
Contract Working Days111
Addl Days Granted26
Working Days Charged164
Percent Time Used119
Contractor(s)
REECE ALBERT, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0069-02-028
BARRICADES UNLIMITED (1.57)
TEX OP CONSTRUCTION, LP (1.24)
SCR CONSTRUCTION CO., INC. (0.58)
SOUTHEAST GRINDING & GROOVING, LLC (0.14)
SURFACE PREPARATION TECHNOLOGIES, LLC (0.37)
Contract #04153202
Totals15257441.66115996.7015939914.7299.9

CountySTERLING
HighwayUS 87
FromSH 158 IN STERLING CITY
ToCOKE COUNTY LINE
CSJ0069-04-042
Proj IDNH 2016(403)
Work TypeACP OVERLAY
 
15.7517904447.763172074.4340.3
Work Order03-01-16
Work Began06-01-16
Work Completed
Time Computed06-01-16
Contract Working Days102
Addl Days Granted2
Working Days Charged122
Percent Time Used117
Contractor(s)
REECE ALBERT, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0069-04-042
BARRICADES UNLIMITED (1.60)
CONTRACTORS SERVICE COMPANY (0.26)
DOUBLE A CONTRACTING, L.P. (0.48)
HJC FARMS, INC. (7.08)
PERFORMANCE EQUIPMENT SERVICE (0.12)
PRIMATE CONSTRUCTION, INC. (1.21)
Contract #12153227
Totals7904447.761115517.413172074.4340.3

CountyTOM GREEN
HighwayUS 87
From33RD STREET
ToUS 67
CSJ0069-07-103
Proj IDNH 2016(761)
Work TypeACP OVERLAY
 
2.0551548841.171396621.3593.0
Work Order03-15-16
Work Began10-09-16
Work Completed
Time Computed06-13-16
Contract Working Days72
Addl Days Granted0
Working Days Charged128
Percent Time Used177
Contractor(s)
REECE ALBERT, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0069-07-103
CONTRACTORS SERVICE COMPANY (0.91)
PERFORMANCE EQUIPMENT SERVICE (1.91)
BARRICADES UNLIMITED (4.37)
Contract #02163220
Totals1548841.1763769.891396621.3593.0

CountyCONCHO ETC
HighwayUS 87 ETC
FromSANTA FE STREET IN EDEN
To1.1 MILES EAST OF US 83
CSJ0070-04-035
Proj IDNH 2017(328)
Work TypeSEAL COAT
 
219.6657317864.520.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order00-00-00
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days87
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
NORTHEASTERN PAVERS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0070-04-035
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #01173006
Totals7317864.520.000.000.0

CountyIRION
HighwayUS 67
From30.8 MI SOUTH OF TOM GREEN CO LINE
ToREAGAN COUNTY LINE
CSJ0077-02-031
Proj IDSTP 1502(413)
Work TypeADD PASSING LANES
 
41.24730896539.8019945346.9064.5
Work Order10-20-15
Work Began11-16-15
Work Completed
Time Computed11-16-15
Contract Working Days375
Addl Days Granted5
Working Days Charged241
Percent Time Used63
Contractor(s)
REECE ALBERT, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0077-02-031
WIMS ENVIRONMENTAL CONSTRUCTION, LTD. (0.14)
COX PAVING COMPANY, L.P. (6.73)
PRIMATE CONSTRUCTION, INC. (0.45)
CONTRACTORS SERVICE COMPANY (0.38)
DOUBLE A CONTRACTING, L.P. (1.52)
HJC FARMS, INC. (1.26)
TEXOP CONSTRUCTION (1.23)
DELGADO"S CONSTRUCTION (0.97)
TITAN MILLING INC. (0.11)
Contract #07153003
Totals30896539.801894454.6919945346.9064.5

CountyTOM GREEN
HighwayUS 67
FromCHADBOURNE STREET
ToUS 87
CSJ0077-06-090
Proj IDNH 1502(609)
Work TypeACP OVERLAY
 
2.9676072493.755568141.0391.7
Work Order02-24-16
Work Began03-28-16
Work Completed
Time Computed03-28-16
Contract Working Days154
Addl Days Granted0
Working Days Charged157
Percent Time Used101
Contractor(s)
PRICE CONSTRUCTION, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0077-06-090
BARRICADES UNLIMITED (2.39)
CONTRACTORS SERVICE COMPANY (0.40)
HJC FARMS, INC. (6.77)
WEST TEXAS RUMBLE STRIP (0.12)
HUDSON, INC. (2.22)
O. TREVINO CONSTRUCTION, LLC (10.45)
Contract #08153247
Totals6072493.751069870.915568141.0391.7

CountyTOM GREEN
HighwayUS 67
FromCHAPEL HILL DRIVE
ToIRION COUNTY LINE
CSJ0077-06-094
Proj IDSTP 2016(404)
Work TypeACP OVERLAY
 
11.2228069634.107809583.8496.9
Work Order03-01-16
Work Began05-31-16
Work Completed
Time Computed05-01-16
Contract Working Days127
Addl Days Granted0
Working Days Charged139
Percent Time Used109
Contractor(s)
REECE ALBERT, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0077-06-094
CONTRACTORS SERVICE COMPANY (0.16)
TEX OP CONSTRUCTION, LP (1.80)
PRIMATE CONSTRUCTION, INC. (0.43)
HJC FARMS, INC. (5.05)
TRP CONSTRUCTION GROUP, LLC (1.60)
Contract #12153028
Totals8069634.1038961.967809583.8496.9

CountyTOM GREEN
HighwayUS 67
FromUS 87
ToSHERWOOD WAY
CSJ0077-06-095
Proj IDNH 1602(524)
Work TypeACP OVERLAY
 
5.4356339169.420.000.0
Work Order12-12-16
Work Began00-00-00
Work Completed
Time Computed01-11-17
Contract Working Days175
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
REECE ALBERT, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0077-06-095
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #11163207
Totals6339169.420.000.000.0

CountyTOM GREEN
HighwayUS 67
FromSL 306
ToFM 2288
CSJ0077-06-098
Proj IDNH 1602(297)
Work TypeUPGRADE NON-FREEWAY
 
0.4003805303.541152698.1830.2
Work Order09-14-16
Work Began09-28-16
Work Completed
Time Computed12-13-16
Contract Working Days174
Addl Days Granted15
Working Days Charged49
Percent Time Used25
Contractor(s)
REECE ALBERT, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0077-06-098
T.C. TRUCKING & CONSTRUCTION, LLC (1.58)
A BROTHERS MILLING, LLC (0.38)
DYNAMIC VISION CO., INC. (3.24)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (0.32)
CONTRACTORS SERVICE COMPANY (1.02)
FLASHER EQUIPMENT COMPANY (1.01)
WILLIS ELECTRIC CO., LP (21.83)
Contract #07163015
Totals3805303.54199679.221152698.1830.2

CountyCROCKETT
HighwayIH 10
From33.1 MI E OF PECOS COUNTY LINE
To38.0 MI E OF PECOS COUNTY LINE
CSJ0140-11-043
Proj IDNH 1602(298)
Work TypeUPGRADE FREEWAY
 
9.92314033551.441516322.4310.8
Work Order09-06-16
Work Began10-24-16
Work Completed
Time Computed11-05-16
Contract Working Days220
Addl Days Granted0
Working Days Charged59
Percent Time Used26
Contractor(s)
KIEWIT INFRASTRUCTURE SOUTH CO.
SUBCONTRACTOR(S) FOR CCSJ: 0140-11-043
AARON CONCRETE CONTRACTORS, L.P. (6.86)
BRANNAN PAVING CO., LTD. (7.08)
CHEROKEE SERVICES (1.05)
DIAMOND SURFACE, INC. (0.09)
KIOWA PEAK INDUSTRIES INC (0.95)
SAENZ TRANSPORT, LLC (10.16)
N-LINE TRAFFIC MAINTENANCE, L.P. (1.69)
DOUBLE A CONTRACTING, L.P. (1.52)
TEXOP CONSTRUCTION (1.71)
HJC FARMS, INC. (3.48)
Contract #07163215
Totals14033551.44615199.041516322.4310.8

CountyZERO COUNTIES
Highway
From
To
CSJ0405-01-026
Proj ID
Work Type
 
0.00124190.880.0
CountySTERLING
HighwaySH 158
FromGLASSCOCK COUNTY LINE
ToUS 87
CSJ0405-02-024
Proj IDNH 2014(078)
Work TypeWIDEN ROADWAY TO 4-LANE UNDIVIDED
 
14.44422606153.8422429629.0599.8
CountyZERO COUNTIES
Highway
From
To
CSJ0405-02-025
Proj ID
Work Type
 
0.001061116.320.0
Work Order01-17-14
Work Began02-20-14
Work Completed
Time Computed02-19-14
Contract Working Days535
Addl Days Granted51
Working Days Charged644
Percent Time Used109
Contractor(s)
PRICE CONSTRUCTION, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0405-01-026
CONTRACTORS SERVICE COMPANY (0.30)
TEX OP CONSTRUCTION, LP (0.03)
W.S. CONSTRUCTION COMPANY (6.00)
W.S. CONSTRUCTION COMPANY (3.57)
BLACK TOPPER TECHNOLOGY, INC. (5.83)
WEST TEXAS RUMBLE STRIP (0.16)
HJC FARMS, INC. (2.33)
ALTEX LANDSCAPE CONSTRUCTION, INC. (0.09)
COPPELL CONSTRUCTION CO., INC. (9.77)
DOUBLE A CONTRACTING, L.P. (1.03)
TEXAS SHAFTS, INC. (0.87)
EAGLE CONCRETE CUTTERS, INC. (0.01)
RUSSO CORPORATION (0.24)
MCL CONTRACTING, LLC (0.02)
MCKINNEY DRILLING COMPANY (0.15)
GARY A. CRAIN, INC. (0.03)
WILLIS ELECTRIC CO., LP (0.04)
Contract #10133202
Totals22606153.8451958.3223614936.2599.9

CountyGLASSCOCK
HighwaySH 158
FromMIDLAND COUNTY LINE
To0.3 MILES WEST OF RM 33
CSJ0463-04-025
Proj IDNH 2016(901)
Work TypeACP OVERLAY
 
17.5878716678.752684380.2130.7
Work Order07-15-16
Work Began11-01-16
Work Completed
Time Computed09-14-16
Contract Working Days71
Addl Days Granted0
Working Days Charged51
Percent Time Used71
Contractor(s)
PRICE CONSTRUCTION, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0463-04-025
A BROTHERS MILLING, LLC (0.15)
BARRICADES UNLIMITED (1.66)
CONTRACTORS SERVICE COMPANY (0.14)
DOUBLE A CONTRACTING, L.P. (0.50)
HJC FARMS, INC. (0.58)
HUDSON, INC. (0.15)
LITTLE MANUFACTURING (0.09)
Contract #04163002
Totals8716678.75626574.892684380.2130.7

CountyCONCHO
HighwayFM 380
FromAT KICKAPOO CREEK
To.
CSJ0555-02-020
Proj IDBR 1602(525)
Work TypeREPLACE BRIDGE AND APPROACHES
 
0.1052162110.600.000.0
Work Order09-26-16
Work Began00-00-00
Work Completed
Time Computed12-26-16
Contract Working Days135
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
RELMCO, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0555-02-020
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #08163218
Totals2162110.600.000.000.0

CountyCONCHO
HighwayFM 765
FromUS 83
ToFM 2134
CSJ0870-04-039
Proj IDSTP 2017(033)
Work TypeRESTORATION OF EXISTING ROAD
 
7.9122858761.68573214.0920.0
Work Order10-27-16
Work Began01-03-17
Work Completed
Time Computed12-26-16
Contract Working Days174
Addl Days Granted0
Working Days Charged20
Percent Time Used11
Contractor(s)
J. H. STRAIN & SONS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0870-04-039
CONTRACTORS SERVICE COMPANY (1.13)
HJC FARMS, INC. (1.25)
D.I.J. CONSTRUCTION, INC (2.49)
Contract #09163208
Totals2858761.68573214.09573214.0920.0

CountyTOM GREEN
HighwayVA
FromVARIOUS ROADWAYS IN SJT DISTRICT
To.
CSJ0907-00-161
Proj IDSTP 1502(163)
Work TypeUPGRADE SIGNALS AND ILLUMINATION
 
0.0011275751.00513223.8640.2
Work Order11-16-15
Work Began07-18-16
Work Completed
Time Computed03-18-16
Contract Working Days174
Addl Days Granted0
Working Days Charged175
Percent Time Used100
Contractor(s)
FNH CONSTRUCTION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0907-00-161
D. I. J. CONSTRUCTION, INC. (3.58)
HOUSLEY COMMUNICATIONS, INC. (4.08)
B & B ELECTRICAL & UTILITY CONTRACTORS, INC. (0.28)
SIGNAL SERVICES GROUP INC. (17.79)
Contract #09153227
Totals1275751.0082627.94513223.8640.2

CountyTOM GREEN
HighwayVA
FromVARIOUS ROADWAYS IN SJT DISTRICT
To.
CSJ0907-00-166
Proj IDSTP 2017(330)
Work TypePAVEMENT MARKINGS
 
0.001506110.530.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order02-07-17
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days49
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
FLAT LINE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0907-00-166
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #01173029
Totals506110.530.000.000.0

CountyTOM GREEN
HighwayVA
FromVARIOUS ROADWAYS IN SJT DISTRICT
To.
CSJ0907-00-168
Proj IDNH 1602(048)
Work TypeSAFETY IMPROVEMENTS
 
0.134646028.79571076.9588.3
Work Order07-13-16
Work Began08-24-16
Work Completed
Time Computed08-13-16
Contract Working Days113
Addl Days Granted0
Working Days Charged66
Percent Time Used58
Contractor(s)
REECE ALBERT, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0907-00-168
RPV CONSTRUCTION (23.95)
CONTRACTORS SERVICE COMPANY (3.04)
ALTEX LANDSCAPE CONSTRUCTION, INC. (0.15)
N-LINE TRAFFIC MAINTENANCE, L.P. (3.07)
DOUBLE A CONTRACTING, L.P. (1.83)
Contract #05163230
Totals646028.7912253.02571076.9588.3