The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.

Text version of this page
County:LIBERTYLet Date:01/06/23
Type:SURFACING/ROADWAY RESTORATIONSeq No:3205
Time:142 WORKING DAYSProject ID:F 2023(345)
Highway:SH 146Contract #:01233205
Length:10.907CCSJ:0389-01-044
Limits: 
From:US 90, SOUTHCheck:$100,000
To:FM 1413Misc Cost:
Estimate$11,413,207.48% Over/UnderCompany
Bidder 1$9,934,425.44-12.96%TEXAS MATERIALS GROUP, INC.
Bidder 2$11,199,999.99-1.87%VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC
Item CodeDescriptionUnitQuantityUnit Est.BidderUnit Bid
1346002BACKFILL (TY B)STA606.910400.001
2
249.500
256.700
3516006FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")SY267.00080.001
2
132.750
156.690
3546043PLANE ASPH CONC PAV (1")SY223,384.0002.501
2
1.550
1.870
3546051PLANE ASPH CONC PAV (0" TO 1 1/2")SY5,422.0003.001
2
10.000
12.830
5006001MOBILIZATIONLS1.0001,540,000.001
2
200,000.000
387,507.860
5026001008BARRICADES, SIGNS AND TRAFFIC HANDLINGMO10.0005,000.001
2
2,900.000
860.040
5336001RUMBLE STRIPS (SHOULDER)LF121,382.0001.651
2
0.060
0.300
5336002RUMBLE STRIPS (CENTERLINE)LF55,194.0001.651
2
0.060
0.300
6626001WK ZN PAV MRK NON-REMOV (W)4"(BRK)LF122,214.0000.501
2
0.250
0.340
6626004WK ZN PAV MRK NON-REMOV (W)4"(SLD)LF116,386.0000.471
2
0.250
0.034
6626109WK ZN PAV MRK SHT TERM (TAB)TY WEA8,736.0001.171
2
0.830
1.140
6626111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA13,452.0001.131
2
0.830
1.280
6666035007REFL PAV MRK TY I (W)8"(SLD)(090MIL)LF1,625.0001.001
2
1.150
1.550
6666305007RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)LF122,214.0000.601
2
0.490
0.660
6666308007RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)LF116,386.0000.601
2
0.490
0.660
6666317007RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)LF106,850.0000.601
2
0.490
0.660
6666320007RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)LF119,090.0000.601
2
0.490
0.660
6686076PREFAB PAV MRK TY C (W) (24") (SLD)LF106.00013.771
2
14.000
18.810
6686077PREFAB PAV MRK TY C (W) (ARROW)EA12.000237.001
2
230.000
309.080
6686085PREFAB PAV MRK TY C (W) (WORD)EA12.000290.001
2
280.000
376.270
6686092PREFAB PAV MRK TY C (W) (36")(YLD TRI)EA16.00036.001
2
36.000
48.380
6726007REFL PAV MRKR TY I-CEA1,370.0005.301
2
5.000
6.720
6726009REFL PAV MRKR TY II-A-AEA2,672.0005.131
2
5.000
6.720
6726010REFL PAV MRKR TY II-C-REA156.0006.001
2
5.000
6.720
30006003CAM (ASPHALT) PG(76-22)TON743.000170.001
2
184.000
0.010
30006004CAM (AGGREGATE)TON9,879.000170.001
2
184.000
195.940
30766066TACK COATGAL4,568.00011.451
2
3.750
8.010
30766071D-GR HMA TY-D PG 64-22 (EXEMPT)TON1,663.000200.001
2
225.000
190.850
30776065SP MIXES SP-D SAC-A PG76-22TON43,906.000130.001
2
140.000
159.140
30776075TACK COATGAL53,220.0005.411
2
3.750
5.980
61856002002TMA (STATIONARY)DAY110.000350.001
2
475.000
346.270
61856005002TMA (MOBILE OPERATION)DAY34.000480.001
2
775.000
346.270