Tabulation of Bids for Project NH 2019(745)

Last Update: Wednesday, July 03, 2019

Bid Tabulations Dashboard

Use this interactive Tableau dashboard to display bidding information on projects let through statewide and local district letting for the past 24 months.

The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.

Text version of this page
County:LYNNLet Date:04/02/19
Type:THIN OVERLAY MIXSeq No:3012
Time:215 WORKING DAYSProject ID:NH 2019(745)
Highway:US 87Contract #:04193012
Length:28.300CCSJ:0068-03-033
Limits: 
From:1.26 MILES S OF TAHOKA CITY LIMITSCheck:$100,000
To:LYNN COUNTYMisc Cost:$58,000.00
Estimate$10,468,157.40% Over/UnderCompany
Bidder 1$13,819,500.73+32.01%DUININCK, INC.
Bidder 2$15,133,027.34+44.56%REECE ALBERT, INC.
Bidder 3$15,182,798.89+45.04%A. L. HELMCAMP, INC.
Bidder 4$16,154,499.65+54.32%KIEWIT INFRASTRUCTURE SOUTH CO.
Item CodeDescriptionUnitQuantityUnit Est.BidderUnit Bid
1106001EXCAVATION (ROADWAY)CY61,000.0006.001
2
3
4
14.000
14.040
11.800
10.970
1646033DRILL SEEDING (PERM) (RURAL) (SANDY)SY497,471.0000.201
2
3
4
0.080
0.100
0.110
0.090
2166001PROOF ROLLINGHR50.00090.001
2
3
4
155.000
71.590
150.000
200.750
3146013EMULS ASPH (EROSN CONT)(CSS-1H)GAL64,672.0003.501
2
3
4
3.300
3.980
3.500
4.190
3156004FOG SEAL (CSS-1H)GAL87,960.0003.501
2
3
4
3.650
4.080
3.500
3.140
3476002001TOM-C (AGGREGATE) SAC-ATON54,514.00070.001
2
3
4
97.250
91.780
90.000
98.090
3476005001TOM (ASPHALT) PG 70-28TON3,479.000600.001
2
3
4
790.000
1,098.260
1,100.000
967.350
3516002FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")SY26,664.00025.001
2
3
4
46.000
59.460
70.000
46.700
3546090PLANE ASPH CONC PAV (3/4")SY1,333,195.0000.501
2
3
4
0.680
0.690
0.800
1.130
4806001CLEAN EXIST CULVERTSEA34.0002,000.001
2
3
4
2,200.000
7,029.500
1,600.000
2,412.110
5006001MOBILIZATIONLS1.000960,000.001
2
3
4
760,000.000
748,831.570
1,100,000.000
1,590,000.000
5026001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO18.0008,500.001
2
3
4
19,500.000
5,423.820
4,950.000
35,000.000
5066020004CONSTRUCTION EXITS (INSTALL) (TY 1)SY536.00028.001
2
3
4
21.000
24.420
25.000
21.670
5066024004CONSTRUCTION EXITS (REMOVE)SY536.0007.001
2
3
4
10.500
7.800
6.000
10.840
5066038004TEMP SEDMT CONT FENCE (INSTALL)LF14,080.0003.501
2
3
4
2.900
2.570
3.800
2.980
5066039004TEMP SEDMT CONT FENCE (REMOVE)LF14,080.0001.501
2
3
4
0.840
0.820
1.250
0.870
5066042004BIODEG EROSN CONT LOGS (INSTL) (18")LF1,040.0005.001
2
3
4
6.300
5.460
6.400
6.500
5066043004BIODEG EROSN CONT LOGS (REMOVE)LF1,040.0001.001
2
3
4
1.050
2.700
1.800
1.080
5336003RUMBLE STRIPS (SHOULDER) ASPHALTLF597,696.0000.101
2
3
4
0.080
0.080
0.100
0.110
5406002MTL W-BEAM GD FEN (STEEL POST)LF1,625.00030.001
2
3
4
25.000
28.950
27.500
28.710
5406016DOWNSTREAM ANCHOR TERMINAL SECTIONEA1.0002,000.001
2
3
4
1,000.000
1,485.640
1,400.000
1,473.560
5426001REMOVE METAL BEAM GUARD FENCELF1,625.0006.001
2
3
4
2.650
3.280
3.200
3.250
5426003REMOVE DOWNSTREAM ANCHOR TERMINALEA1.000250.001
2
3
4
210.000
327.720
320.000
325.050
5446001GUARDRAIL END TREATMENT (INSTALL)EA1.0004,000.001
2
3
4
2,700.000
3,277.160
3,200.000
3,250.500
5446003GUARDRAIL END TREATMENT (REMOVE)EA1.000400.001
2
3
4
265.000
327.720
320.000
325.050
6446068RELOCATE SM RD SN SUP&AM TY 10BWGEA51.000400.001
2
3
4
475.000
824.750
450.000
818.040
6586041INSTL DEL ASSM (D-DY)SZ 1(FLX)GNDEA116.00095.001
2
3
4
42.000
147.470
110.000
146.270
6586061INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2EA33.00030.001
2
3
4
16.000
43.700
45.000
43.340
6626001WK ZN PAV MRK NON-REMOV (W)4"(BRK)LF18,662.0000.251
2
3
4
0.350
0.360
0.200
0.160
6626004WK ZN PAV MRK NON-REMOV (W)4"(SLD)LF74,646.0000.201
2
3
4
0.340
0.350
0.190
0.160
6626012WK ZN PAV MRK NON-REMOV (W)8"(SLD)LF8,162.0000.401
2
3
4
0.940
0.970
0.850
0.330
6626034WK ZN PAV MRK NON-REMOV (Y)4"(SLD)LF74,646.0000.201
2
3
4
0.340
0.350
0.190
0.160
6626109WK ZN PAV MRK SHT TERM (TAB)TY WEA48,744.0001.001
2
3
4
1.050
1.650
0.500
1.350
6626111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA18,680.0001.001
2
3
4
1.050
1.690
0.500
0.980
6666036007REFL PAV MRK TY I (W)8"(SLD)(100MIL)LF32,650.0001.001
2
3
4
0.790
0.820
0.800
0.980
6666303007RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)LF298,580.0000.401
2
3
4
0.370
0.380
0.380
0.490
6666306007RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)LF74,646.0000.501
2
3
4
0.440
0.460
0.450
0.740
6666315007RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF298,580.0000.401
2
3
4
0.370
0.380
0.380
0.490
6686076PREFAB PAV MRK TY C (W) (24") (SLD)LF402.00014.001
2
3
4
17.000
17.480
17.000
22.750
6686077PREFAB PAV MRK TY C (W) (ARROW)EA234.000280.001
2
3
4
240.000
251.250
240.000
357.560
6686085PREFAB PAV MRK TY C (W) (WORD)EA4.000300.001
2
3
4
305.000
316.790
300.000
514.660
6726007REFL PAV MRKR TY I-CEA2,850.0003.501
2
3
4
3.400
3.550
3.500
3.250
6726010REFL PAV MRKR TY II-C-REA5,366.0003.501
2
3
4
3.400
3.550
3.500
3.230
6776001ELIM EXT PAV MRK & MRKS (4")LF167,952.0000.701
2
3
4
0.470
0.490
0.450
0.700
6776003ELIM EXT PAV MRK & MRKS (8")LF8,162.0002.001
2
3
4
0.790
0.820
0.750
1.410
7306107003FULL - WIDTH MOWINGCYC2.0003,500.001
2
3
4
21,000.000
27,663.580
10,000.000
10,835.000
7346002LITTER REMOVALCYC2.0002,500.001
2
3
4
10,500.000
15,427.770
10,000.000
2,708.750
60016002PORTABLE CHANGEABLE MESSAGE SIGNEA2.00013,000.001
2
3
4
13,000.000
23,990.990
20,000.000
13,543.750
61856002TMA (STATIONARY)DAY430.000220.001
2
3
4
295.000
332.540
150.000
100.000
61856005TMA (MOBILE OPERATION)DAY30.000400.001
2
3
4
73.500
767.250
1,000.000
433.400