The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.

Text version of this page
County:VICTORIALet Date:05/02/24
Type:UPGRADE DYNAMIC MESSAGE SIGN BOARDSSeq No:3025
Time:117 WORKING DAYSProject ID:C 89-1-99
Highway:US 59Contract #:05243025
Length:0.000CCSJ:0089-01-099
Limits: 
From:0.116 MILES SW OF TREASURE OAKS RDCheck:$54,000
To:0.209 MILES NE OF POST OAK CIRCLEMisc Cost:
Estimate$2,709,350.00% Over/UnderCompany
Bidder 1$1,868,961.17-31.02%ALLSTATE SIGNAL & CONSTRUCTION, LLC
Bidder 2$2,122,751.64-21.65%THIRD COAST SERVICES LLC
Bidder 3$2,186,489.12-19.30%SICE, INC.
Bidder 4$2,334,386.85-13.84%TRAF-TEX, INC.
Bidder 5$2,597,468.28-4.13%FLORIDA TRAFFIC CONTROL DEVICES, INC.
Bidder 6$2,820,175.25+4.09%THE LEVY COMPANY, INC.
Item CodeDescriptionUnitQuantityUnit Est.BidderUnit Bid
1326005EMBANKMENT (FINAL)(ORD COMP)(TY C)CY3.00020.001
2
3
4
5
6
1,750.000
1,143.870
794.228
256.000
108.950
130.000
1506002BLADINGHR28.000300.001
2
3
4
5
6
263.970
183.840
648.281
167.000
160.220
400.000
2476366005FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)CY96.000300.001
2
3
4
5
6
220.000
187.890
451.245
274.000
307.620
290.000
4166005DRILL SHAFT (42 IN)LF189.000500.001
2
3
4
5
6
539.480
402.540
677.699
492.000
798.190
1,300.000
4166006DRILL SHAFT (48 IN)LF270.000600.001
2
3
4
5
6
551.360
392.470
798.561
596.000
890.780
1,300.000
4326001RIPRAP (CONC)(4 IN)CY9.000600.001
2
3
4
5
6
640.000
623.440
1,640.873
1,740.000
1,903.400
1,100.000
5006001008MOBILIZATIONLS1.000250,000.001
2
3
4
5
6
25,000.000
212,275.160
128,326.850
58,375.000
258,579.660
282,300.000
5026001008BARRICADES, SIGNS AND TRAFFIC HANDLINGMO8.0002,500.001
2
3
4
5
6
1,945.000
2,624.220
12,328.547
5,942.000
1,140.820
11,170.000
5066022002CONSTRUCTION EXITS (INSTALL) (TY 3)SY546.00050.001
2
3
4
5
6
39.000
6.280
83.907
27.150
128.170
65.000
5066024002CONSTRUCTION EXITS (REMOVE)SY546.00020.001
2
3
4
5
6
11.540
6.280
41.162
7.900
64.090
17.000
5066038002TEMP SEDMT CONT FENCE (INSTALL)LF900.00010.001
2
3
4
5
6
8.500
5.470
6.251
6.100
13.670
5.750
5066039002TEMP SEDMT CONT FENCE (REMOVE)LF900.0002.501
2
3
4
5
6
4.000
3.280
0.634
1.610
7.510
1.800
6186007CONDT (HDPE) (2") (STL ENCSE)LF1,120.00060.001
2
3
4
5
6
50.000
32.620
27.309
72.500
41.420
90.000
6186009CONDT (HDPE) (3")LF7,205.00050.001
2
3
4
5
6
15.850
6.570
14.721
24.000
15.060
12.500
6186070CONDT (RM) (2")LF1,080.00060.001
2
3
4
5
6
26.000
28.710
33.416
34.000
33.030
5.000
6206015ELEC CONDR (NO.2) BARELF8,725.0005.001
2
3
4
5
6
4.150
3.350
2.408
3.610
2.920
3.350
6206016ELEC CONDR (NO.2) INSULATEDLF19,205.0005.001
2
3
4
5
6
4.250
3.970
2.729
4.660
4.120
3.600
6246002GROUND BOX TY A (122311)W/APRONEA30.0001,400.001
2
3
4
5
6
1,160.000
1,340.130
1,784.283
1,368.000
1,332.190
1,300.000
6286250ELC SRV TY D 120/240 100(NS)SS(N)SP(O)EA7.0007,500.001
2
3
4
5
6
7,720.000
6,318.020
5,991.551
8,989.000
6,892.190
8,100.000
6506021INS OH SN SUP(25 FT BAL TEE)EA9.00045,000.001
2
3
4
5
6
46,150.000
69,625.390
49,364.817
68,919.000
68,752.890
76,500.000
60016002PORTABLE CHANGEABLE MESSAGE SIGNEA21.0008,500.001
2
3
4
5
6
235.000
1,634.090
4,151.430
3,158.000
366.230
690.000
60076010FIBER OPTIC CBL (SNGLE-MODE)(6 FIBER)LF2,180.0004.001
2
3
4
5
6
4.850
7.450
8.415
12.500
11.450
7.500
60076021FIBER OPTIC SPLICE ENCLOSUREEA19.0003,200.001
2
3
4
5
6
2,505.000
3,908.710
1,929.626
1,678.000
832.400
250.000
60076023FIBER OPTIC PATCH PANEL (12 POSITION)EA18.0001,600.001
2
3
4
5
6
1,710.000
3,996.610
1,770.859
836.000
2,641.640
1,200.000
60106002CCTV FIELD EQUIPMENT (DIGITAL)EA9.0009,700.001
2
3
4
5
6
9,637.000
8,998.110
7,392.690
7,026.000
8,234.370
9,600.000
60106003CCTV FIELD CONTROLLEREA9.000900.001
2
3
4
5
6
755.000
1,776.270
612.205
2,241.000
656.460
1.000
60286002INSTALL DMS (FOUNDATION MTD CABINET)EA9.00015,000.001
2
3
4
5
6
13,205.000
4,687.170
11,044.352
16,613.000
13,831.790
13,800.000
60646046001ITS POLE (55 FT)(90 MPH)EA9.00028,000.001
2
3
4
5
6
19,621.000
20,059.030
20,906.957
20,223.000
20,856.450
23,800.000
60646080001ITS POLE MNT CAB (TY 2)(CONF 1)EA9.0006,200.001
2
3
4
5
6
5,445.000
6,130.380
3,741.326
7,649.000
8,149.780
5,500.000
61236001ETHERNET SWITCH (INSTALL ONLY)EA18.000550.001
2
3
4
5
6
500.000
1,143.850
142.479
348.000
1,156.080
370.000
61856002002TMA (STATIONARY)DAY21.000400.001
2
3
4
5
6
229.000
875.950
508.750
332.000
398.280
130.000
61866002ITS GND BOX(PCAST) TY 1 (243636)W/APRNEA19.0005,600.001
2
3
4
5
6
5,427.000
5,602.710
4,696.128
5,007.000
4,600.150
6,500.000
62636002BLUETOOTH DETECTION SYSTEM (INSTALL)EA7.0002,800.001
2
3
4
5
6
4,305.000
1,715.790
1,000.361
4,626.000
11,795.850