Tabulation of Bids for Project BR 2B24(032)
Use this interactive Tableau dashboard to display bidding information on projects let through statewide and local district letting for the past 24 months.
The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.
Text version of this page | |||
County: | UPSHUR | Let Date: | 05/03/24 |
Type: | REPLACE BRIDGE AND APPROACHES | Seq No: | 3236 |
Time: | 0 X | Project ID: | BR 2B24(032) |
Highway: | FM 556 | Contract #: | 05243236 |
Length: | 0.166 | CCSJ: | 2030-01-011 |
Limits: | |||
From: | AT LITTLE CYPRESS CREEK | Check: | $62,000 |
To: | . | Misc Cost: |
Estimate | $4,301,743.15 | % Over/Under | Company |
Bidder 1 | $3,343,732.79 | -22.27% | EAST TEXAS BRIDGE, INC. |
Bidder 2 | $3,520,919.85 | -18.15% | TRUE ROADS, LLC |
Bidder 3 | $3,616,494.00 | -15.93% | HODGES AND SON CONSTRUCTION COMPANY, INC. |
Bidder 4 | $3,816,182.78 | -11.29% | LONGVIEW BRIDGE AND ROAD, LTD. |
Item Code | Description | Unit | Quantity | Unit Est. | Bidder | Unit Bid |
1006005 | PREP ROW (TREE)(24"-30"DIA) | EA | 1.000 | 1,500.00 | 1 2 3 4 | 2,500.000 3,000.000 3,000.000 15,000.000 |
1046009 | REMOVING CONC (RIPRAP) | SY | 82.000 | 45.00 | 1 2 3 4 | 20.000 40.000 10.000 90.000 |
1046054 | REMOVING CONCRETE(MOW STRIP) | LF | 534.000 | 16.00 | 1 2 3 4 | 10.000 6.000 10.000 10.000 |
1056014 | REMOVING STAB BASE & ASPH PAV (7"-12") | SY | 3,333.000 | 25.00 | 1 2 3 4 | 11.000 8.000 20.000 13.000 |
1106001 | EXCAVATION (ROADWAY) | CY | 708.000 | 30.00 | 1 2 3 4 | 15.000 22.000 30.000 28.000 |
1326006 | EMBANKMENT (FINAL)(DENS CONT)(TY C) | CY | 2,556.000 | 50.00 | 1 2 3 4 | 20.000 32.000 30.000 30.000 |
1606003 | FURNISHING AND PLACING TOPSOIL (4") | SY | 5,464.000 | 4.50 | 1 2 3 4 | 3.000 4.000 4.000 4.000 |
1646054 | BOND FBR MTRX SEED (PERM)(RURAL)(SAND) | SY | 5,464.000 | 1.25 | 1 2 3 4 | 0.720 0.800 1.500 0.710 |
1646055 | BONDED FBR MTRX SEED (TEMP)(WARM) | SY | 2,732.000 | 1.25 | 1 2 3 4 | 0.690 0.750 1.000 0.720 |
1646056 | BONDED FBR MTRX SEED (TEMP)(COOL) | SY | 2,732.000 | 1.25 | 1 2 3 4 | 0.690 0.750 1.000 0.700 |
1686001 | VEGETATIVE WATERING | MG | 175.000 | 160.00 | 1 2 3 4 | 5.000 44.000 1.000 12.000 |
1696002 | SOIL RETENTION BLANKETS (CL 1) (TY B) | SY | 950.000 | 3.00 | 1 2 3 4 | 0.800 1.900 3.000 1.000 |
2476236005 | FL BS (RDWY DEL)(TY A GR 1-2)(FNAL POS) | CY | 976.000 | 125.00 | 1 2 3 4 | 135.000 135.000 80.000 145.000 |
2756001 | CEMENT | TON | 127.000 | 325.00 | 1 2 3 4 | 305.000 300.000 320.000 320.000 |
2756010 | CEMENT TREAT (SUBGRADE) (8") | SY | 4,391.000 | 8.25 | 1 2 3 4 | 5.000 3.650 12.000 5.000 |
2756078 | CEMENT TREAT (NEW BASE)(DC)(8") | SY | 4,383.000 | 8.25 | 1 2 3 4 | 5.000 3.650 12.000 5.000 |
3106009 | PRIME COAT (MC-30) | GAL | 1,097.000 | 12.00 | 1 2 3 4 | 6.500 12.500 8.000 7.000 |
4006005 | CEM STABIL BKFL | CY | 141.000 | 290.00 | 1 2 3 4 | 275.000 325.000 250.000 305.000 |
4016001 | FLOWABLE BACKFILL | CY | 40.000 | 650.00 | 1 2 3 4 | 300.000 280.000 250.000 350.000 |
4166002 | DRILL SHAFT (24 IN) | LF | 450.000 | 275.00 | 1 2 3 4 | 175.000 220.000 125.000 230.000 |
4166004 | DRILL SHAFT (36 IN) | LF | 440.000 | 350.00 | 1 2 3 4 | 250.000 380.000 200.000 325.000 |
4206014001 | CL C CONC (ABUT)(HPC) | CY | 29.000 | 1,700.00 | 1 2 3 4 | 1,275.000 1,850.000 1,800.000 1,450.000 |
4206030001 | CL C CONC (CAP)(HPC) | CY | 34.200 | 1,850.00 | 1 2 3 4 | 1,300.000 1,925.000 1,800.000 1,350.000 |
4206038001 | CL C CONC (COLUMN)(HPC) | CY | 12.700 | 2,100.00 | 1 2 3 4 | 1,300.000 2,450.000 1,800.000 1,750.000 |
4226008 | REINF CONC SLAB (SLAB BEAM)(HPC) | SF | 7,849.000 | 30.00 | 1 2 3 4 | 30.000 25.000 24.000 32.000 |
4226016 | APPROACH SLAB (HPC) | CY | 84.400 | 850.00 | 1 2 3 4 | 1,000.000 770.000 1,000.000 1,100.000 |
4256011001 | PRESTR CONC SLAB BEAM (4SB15) | LF | 672.010 | 300.00 | 1 2 3 4 | 235.000 300.000 250.000 250.000 |
4256012001 | PRESTR CONC SLAB BEAM (5SB15) | LF | 1,008.010 | 310.00 | 1 2 3 4 | 235.000 300.000 250.000 250.000 |
4326006 | RIPRAP (CONC)(CL B) | CY | 2.600 | 1,050.00 | 1 2 3 4 | 1,000.000 1,685.000 1,000.000 2,000.000 |
4326031 | RIPRAP (STONE PROTECTION)(12 IN) | CY | 909.000 | 225.00 | 1 2 3 4 | 195.000 160.000 200.000 210.000 |
4326039 | BEDDING MATERIAL (6 IN) | CY | 208.000 | 220.00 | 1 2 3 4 | 195.000 185.000 200.000 225.000 |
4326045 | RIPRAP (MOW STRIP)(4 IN) | CY | 40.000 | 750.00 | 1 2 3 4 | 725.000 700.000 650.000 740.000 |
4506111001 | RAIL (TY SSTR) (W/DRAIN SLOT) (HPC) | LF | 364.000 | 165.00 | 1 2 3 4 | 175.000 135.000 110.000 155.000 |
4546003 | ARMOR JOINT | LF | 89.000 | 175.00 | 1 2 3 4 | 125.000 110.000 170.000 130.000 |
4546004 | ARMOR JOINT (SEALED) | LF | 128.000 | 160.00 | 1 2 3 4 | 150.000 110.000 170.000 140.000 |
4966010 | REMOV STR (BRIDGE 100 - 499 FT LENGTH) | EA | 1.000 | 100,000.00 | 1 2 3 4 | 40,000.000 60,000.000 175,000.000 50,000.000 |
4966043 | REMOV STR (SMALL FENCE) | LF | 447.000 | 20.00 | 1 2 3 4 | 4.000 6.000 10.000 10.000 |
5006001008 | MOBILIZATION | LS | 1.000 | 281,000.00 | 1 2 3 4 | 225,000.000 200,000.000 225,000.000 260,000.000 |
5026001008 | BARRICADES, SIGNS AND TRAFFIC HANDLING | MO | 11.000 | 10,600.00 | 1 2 3 4 | 5,000.000 5,500.000 12,000.000 6,000.000 |
5066002005 | ROCK FILTER DAMS (INSTALL) (TY 2) | LF | 60.000 | 45.00 | 1 2 3 4 | 38.000 50.000 1.000 45.000 |
5066003005 | ROCK FILTER DAMS (INSTALL) (TY 3) | LF | 100.000 | 75.00 | 1 2 3 4 | 54.000 88.000 1.000 55.000 |
5066011005 | ROCK FILTER DAMS (REMOVE) | LF | 160.000 | 20.00 | 1 2 3 4 | 11.000 18.000 1.000 11.000 |
5066020005 | CONSTRUCTION EXITS (INSTALL) (TY 1) | SY | 160.000 | 35.00 | 1 2 3 4 | 32.000 37.500 1.000 39.000 |
5066024005 | CONSTRUCTION EXITS (REMOVE) | SY | 160.000 | 12.00 | 1 2 3 4 | 10.500 15.000 1.000 11.000 |
5066038005 | TEMP SEDMT CONT FENCE (INSTALL) | LF | 2,551.000 | 5.00 | 1 2 3 4 | 4.250 5.000 1.000 4.500 |
5066039005 | TEMP SEDMT CONT FENCE (REMOVE) | LF | 2,551.000 | 1.75 | 1 2 3 4 | 0.700 0.800 1.000 2.000 |
5066042005 | BIODEG EROSN CONT LOGS (INSTL) (18") | LF | 391.000 | 12.00 | 1 2 3 4 | 8.500 7.500 1.000 7.000 |
5066043005 | BIODEG EROSN CONT LOGS (REMOVE) | LF | 391.000 | 3.00 | 1 2 3 4 | 2.150 1.250 1.000 2.000 |
5406001001 | MTL W-BEAM GD FEN (TIM POST) | LF | 562.500 | 35.00 | 1 2 3 4 | 25.000 29.000 26.000 26.000 |
5406006001 | MTL BEAM GD FEN TRANS (THRIE-BEAM) | EA | 4.000 | 2,500.00 | 1 2 3 4 | 2,000.000 2,000.000 1,500.000 1,820.000 |
5426001 | REMOVE METAL BEAM GUARD FENCE | LF | 275.000 | 7.00 | 1 2 3 4 | 2.150 2.500 2.000 2.200 |
5426005 | RM MTL BM GD FEN TRANS (T101) | EA | 4.000 | 275.00 | 1 2 3 4 | 165.000 187.500 1,200.000 165.000 |
5446001 | GUARDRAIL END TREATMENT (INSTALL) | EA | 4.000 | 3,500.00 | 1 2 3 4 | 3,100.000 3,600.000 2,800.000 3,200.000 |
5446003 | GUARDRAIL END TREATMENT (REMOVE) | EA | 4.000 | 350.00 | 1 2 3 4 | 215.000 250.000 500.000 220.000 |
5526003 | WIRE FENCE (TY C) | LF | 448.000 | 40.00 | 1 2 3 4 | 27.000 18.750 20.000 11.000 |
6446061 | IN SM RD SN SUP&AM TYTWT(1)WS(T) | EA | 2.000 | 825.00 | 1 2 3 4 | 1,200.000 1,250.000 1,600.000 1,200.000 |
6586014 | INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) | EA | 6.000 | 43.50 | 1 2 3 4 | 50.000 56.250 50.000 50.000 |
6586016 | INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI) | EA | 18.000 | 35.00 | 1 2 3 4 | 30.000 31.250 40.000 28.000 |
6586099 | INSTL OM ASSM (OM-2Z)(WFLX)GND | EA | 2.000 | 110.00 | 1 2 3 4 | 250.000 125.000 200.000 300.000 |
6626109 | WK ZN PAV MRK SHT TERM (TAB)TY W | EA | 150.000 | 3.00 | 1 2 3 4 | 2.000 3.750 5.000 2.200 |
6626111 | WK ZN PAV MRK SHT TERM (TAB)TY Y-2 | EA | 150.000 | 3.00 | 1 2 3 4 | 2.000 3.750 5.000 2.200 |
6666225007 | PAVEMENT SEALER 6" | LF | 868.000 | 1.10 | 1 2 3 4 | 2.150 2.500 1.000 2.200 |
6726009 | REFL PAV MRKR TY II-A-A | EA | 34.000 | 10.00 | 1 2 3 4 | 21.500 25.000 20.000 22.000 |
6786002 | PAV SURF PREP FOR MRK (6") | LF | 868.000 | 1.25 | 1 2 3 4 | 1.100 1.250 1.000 1.100 |
6786033 | PAV SURF PREP FOR MRK (RPM) | EA | 6.000 | 10.00 | 1 2 3 4 | 11.000 12.500 1.000 13.000 |
30776051 | SP MIXES SP-D PG70-22 | TON | 354.000 | 380.00 | 1 2 3 4 | 245.000 225.000 250.000 200.000 |
60016002 | PORTABLE CHANGEABLE MESSAGE SIGN | EA | 3.000 | 16,500.00 | 1 2 3 4 | 18,000.000 20,000.000 28,000.000 22,000.000 |
61496004 | REFL PAV MRK AWT (W) 6" (SLD) (100MIL) | LF | 2,680.000 | 3.00 | 1 2 3 4 | 2.150 2.500 4.000 2.200 |
61496010 | REFL PAV MRK AWT (Y) 6" (SLD) (100MIL) | LF | 2,680.000 | 3.00 | 1 2 3 4 | 2.150 2.500 4.000 2.200 |
61856002002 | TMA (STATIONARY) | DAY | 5.000 | 310.00 | 1 2 3 4 | 350.000 180.000 300.000 250.000 |
61856003002 | TMA (MOBILE OPERATION) | HR | 60.000 | 95.00 | 1 2 3 4 | 35.000 20.000 50.000 70.000 |
8006001 | NO. OF WORKING DAYS | $/D | 5,997.000 | 204.00 | 1 2 3 4 | 171.000 171.000 171.000 204.000 |