Tabulation of Bids for Project STP 2014(597)

Last Update: Thursday, June 12, 2014
Text version of this page
County: MONTGOMERY Let Date: 06/12/14
Type: INSTALL LEFT TURN LANE Seq No: 3062
Time: 30 WORKING DAYS Project ID: STP 2014(597)
Highway: FM 2432 Contract #: 06143062
Length: 0.412 CCSJ: 2325-01-016
Limits:  
From: AT TEXAS NATIONAL BOULEVARD Check: $7,000.00
To:   Misc Cost: $3,000.00
Estimate $335,984.19 % Over/Under Company
Bidder 1 $399,448.91 +18.89% SMITH & COMPANY
Bidder 2 $425,201.70 +26.55% MAIN LANE INDUSTRIES, LTD.
Bidder 3 $428,539.32 +27.55% FORDE CONSTRUCTION COMPANY, INC.
Item Code Description Unit Quantity Unit Est. Bidder Unit Bid
1122002 SUBGRADE WIDENING (DENS CONT) STA 13.510 442.56 1
2
3
1500.000
2100.000
1875.000
1342001 BACKFILL (TY A) STA 13.510 215.70 1
2
3
400.000
500.000
350.000
1502002 BLADING HR 10.000 100.00 1
2
3
75.000
100.000
162.000
1622002 BLOCK SODDING SY 8004.000 2.52 1
2
3
2.850
3.000
2.750
1662001001 FERTILIZER AC 2.000 448.02 1
2
3
775.000
850.000
750.000
1682001 VEGETATIVE WATERING MG 80.000 10.36 1
2
3
10.000
45.000
44.000
2602002003 LIME (HYDRATED LIME (SLURRY) ) TON 36.000 149.00 1
2
3
170.000
175.000
175.000
2602079003 LIME TRT (SUBGRADE) (6") SY 2401.000 4.00 1
2
3
6.000
8.500
10.000
2922007 ASPHALT STAB BASE (GR 2) (PG 64) TON 1181.000 90.00 1
2
3
92.000
92.000
79.000
3542051 PLANE ASPH CONC PAV (0" TO 1 1 / 2") SY 1200.000 4.93 1
2
3
6.000
4.000
5.750
4642003006 RC PIPE (CL III) (18 IN) LF 20.000 60.00 1
2
3
67.000
190.000
180.000
4642005006 RC PIPE (CL III) (24 IN) LF 20.000 54.00 1
2
3
100.000
190.000
200.000
4672286 SET (TY II) (18 IN) (RCP) (6: 1) (P) EA 12.000 900.00 1
2
3
975.000
950.000
1250.000
4672288 SET (TY II) (24 IN) (RCP) (6: 1) (P) EA 2.000 1400.00 1
2
3
1225.000
1150.000
1500.000
4672289 SET (TY II) (27 IN) (RCP) (6: 1) (P) EA 2.000 1700.00 1
2
3
1550.000
1400.000
1850.000
4802001 CLEAN EXIST CULVS EA 9.000 600.00 1
2
3
2550.000
700.000
700.000
4962007 REMOV STR (PIPE) LF 40.000 13.00 1
2
3
35.000
10.000
100.000
5002001011 MOBILIZATION LS 1.000 12500.00 1
2
3
28000.000
45000.000
28000.000
5022001033 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 2.000 5000.00 1
2
3
1250.000
2000.000
8000.000
5302008006 DRIVEWAYS (ACP) EA 11.000 495.86 1
2
3
1350.000
1900.000
2600.000
5302014006 TURNOUTS (ACP) EA 10.000 1700.00 1
2
3
1750.000
800.000
1300.000
5332006014 SHOULDER TEXTURING (MILLED) (ASPHALT) LF 2702.000 0.17 1
2
3
3.750
2.500
2.000
5602001001 MAILBOX INSTALLATION (SINGLE) EA 10.000 255.00 1
2
3
225.000
450.000
400.000
6442056 RELOCATE SM RD SN SUP & AM TY 10BWG EA 2.000 398.00 1
2
3
500.000
800.000
700.000
6622113 WK ZN PAV MRK SHT TERM (TAB) TY W EA 68.000 0.85 1
2
3
1.000
1.000
1.000
6622114 WK ZN PAV MRK SHT TERM (TAB) TY Y EA 68.000 0.85 1
2
3
1.000
1.000
1.000
6662012014 REFL PAV MRK TY I (W) 4" (SLD) (100MIL) LF 2702.000 0.35 1
2
3
0.540
0.550
0.480
6662036014 REFL PAV MRK TY I (W) 8" (SLD) (100MIL) LF 375.000 0.82 1
2
3
1.350
1.100
0.950
6662111014 REFL PAV MRK TY I (Y) 4" (SLD) (100MIL) LF 2702.000 0.39 1
2
3
0.540
0.550
0.480
6682106 PREFAB PAV MRK TY C (W) (ARROW) EA 2.000 150.00 1
2
3
180.000
150.000
130.000
6682116 PREFAB PAV MRK TY C (W) (WORD) EA 2.000 175.00 1
2
3
255.000
250.000
220.000
6722012034 REFL PAV MRKR TY I - C EA 38.000 3.19 1
2
3
3.350
3.250
3.000
6722015034 REFL PAV MRKR TY II - A - A EA 218.000 2.81 1
2
3
3.350
3.000
2.800
11222037001 TEMPORARY SEDIMENT CONTROL FENCE INSTLL LF 1700.000 2.12 1
2
3
1.750
2.000
1.750
11222057001 TEMPORARY SEDIMENT CONTROL FENCE REMOVE LF 1700.000 0.63 1
2
3
0.250
1.500
1.000
32672104 D - GR HMA (SQ) TY - D SAC - B PG64 - 22 TON 200.000 122.83 1
2
3
110.000
100.000
139.000
32672119 D - GR HMA (SQ) TY - D SAC - A PG70 - 22 TON 670.000 104.50 1
2
3
89.000
100.000
99.000