Tabulation of Bids for Project STP 2014(776)

Last Update: Friday, June 13, 2014
Text version of this page
County: LUBBOCK Let Date: 06/13/14
Type: PAVEMENT REPAIR Seq No: 3222
Time: 68 WORKING DAYS Project ID: STP 2014(776)
Highway: VA Contract #: 06143222
Length: 0.002 CCSJ: 0905-00-085
Limits:  
From: US 84, BNSF OVERPASS Check: $17,000.00
To: IN POST, TEXAS Misc Cost: $42,000.00
Estimate $835,476.90 % Over/Under Company
Bidder 1 $1,205,066.00 +44.24% SCR CONSTRUCTION CO., INC.
Item Code Description Unit Quantity Unit Est. Bidder Unit Bid
1042027 REMOVING CONC (APPR SLAB) SY 597.040 10.00 1 90.000
1042039 REMOVE CONC (ABUTMENT BACKWALL) CY 4.250 200.00 1 1400.000
1102001 EXCAVATION (ROADWAY) CY 563.200 50.00 1 60.000
2162001 PROOF ROLLING HR 10.000 100.00 1 400.000
3162006016 ASPH (AC - 20 - 5TR) GAL 6855.000 5.00 1 8.000
3162223016 AGGR (TY - PB GR - 4 SAC - B) CY 170.000 200.00 1 240.000
4002023 CEM STAB BKFL (BEHIND ABUTMENT) CY 500.000 150.00 1 260.000
4202003002 CL C CONC (ABUT) CY 4.250 2000.00 1 5200.000
4202033002 CL S CONC (APPR SLAB) CY 223.720 500.00 1 660.000
4542005003 ARMOR JOINT (WITH SEAL) LF 120.000 100.00 1 65.000
5002001011 MOBILIZATION LS 1.000 76000.00 1 100000.000
5022001033 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 4.000 8000.00 1 8500.000
5082002 CONSTRUCTING DETOURS SY 4778.000 50.00 1 76.000
5452084001 CRASH CUSH ATTEN (INSTL) (L) (N) (70) EA 2.000 15000.00 1 22000.000
5452101001 CRASH CUSHION ATTENUATOR (REMOVE) EA 2.000 600.00 1 500.000
6582303 INSTL DEL ASSM (D - DY) SZ 1 (FLX) SRF EA 215.000 60.00 1 100.000
6622004 WK ZN PAV MRK NON - REMOV (W) 4" (SLD) LF 7460.000 0.25 1 0.850
6622032 WK ZN PAV MRK NON - REMOV (Y) 4" (SLD) LF 7460.000 0.25 1 0.850
6622067 WK ZN PAV MRK REMOV (W) 4" (SLD) LF 7400.000 1.00 1 0.830
6622099 WK ZN PAV MRK REMOV (Y) 4" (SLD) LF 11920.000 1.00 1 0.830
6622113 WK ZN PAV MRK SHT TERM (TAB) TY W EA 301.000 1.00 1 4.000
6622115 WK ZN PAV MRK SHT TERM (TAB) TY Y - 2 EA 180.000 1.00 1 4.000
6662036 REFL PAV MRK TY I (W) 8" (SLD) (100MIL) LF 600.000 0.60 1 1.330
6682046 PREFAB PAV MRK TY B (W) ( 4") (BRK) LF 1470.000 3.00 1 3.870
6682049 PREFAB PAV MRK TY B (W) ( 4") (SLD) LF 2440.000 3.00 1 3.370
6682058 PREFAB PAV MRK TY B (W) ( 8") (LNDP) LF 250.000 3.00 1 8.000
6682059 PREFAB PAV MRK TY B (W) ( 8") (SLD) LF 300.000 7.00 1 7.000
6682063 PREFAB PAV MRK TY B (W) (24") (SLD) LF 200.000 12.00 1 11.420
6682064 PREFAB PAV MRK TY B (W) (ARROW) EA 2.000 350.00 1 714.000
6682074 PREFAB PAV MRK TY B (W) (WORD) EA 2.000 350.00 1 650.000
6682077 PREFAB PAV MRK TY B (Y) ( 4") (BRK) LF 1200.000 3.00 1 3.870
6682079 PREFAB PAV MRK TY B (Y) ( 4") (SLD) LF 7150.000 3.00 1 3.350
6682087 PREFAB PAV MRK TY B (Y) (24") (SLD) LF 200.000 12.00 1 11.420
6682156 PREFAB PAV MRK TY B (W) (DIAG ARROW) EA 1.000 350.00 1 1455.000
6772001 ELIM EXT PAV MRK & MRKS ( 4") LF 33355.000 0.60 1 0.240
6772003 ELIM EXT PAV MRK & MRKS ( 8") LF 250.000 0.80 1 0.790
6782021 PAV SURF PREP FOR MRK (BLAST CLN) (4") LF 12260.000 0.60 1 0.100
6782024 PAV SURF PREP FOR MRK (BLAST CLN) (24") LF 400.000 5.00 1 0.170
6782027 PAV SURF PREP FOR MRK (BLAST CLN) (8") LF 550.000 1.00 1 0.100
6782028 PAV SURF PREP FOR MRK (BLST CLN) (ARRWS) EA 2.000 40.00 1 8.800
6782029 PAV SURF PREP FOR MRK (BLST CLN) (WORDS) EA 2.000 50.00 1 10.000
11222016001 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 78.000 20.00 1 35.000
11222019001 CONSTRUCTION EXITS (REMOVE) SY 78.000 10.00 1 10.000
11222031001 SANDBAGS FOR EROSION CONTROL EA 2091.000 5.00 1 12.000
68342001002 PORTABLE CHANGEABLE MESSAGE SIGN DAY 120.000 120.00 1 100.000
89992007 HPPM W / RET REQ TY I (W) 4" (BRK) (100M LF 1070.000 0.55 1 0.570
89992010 HPPM W / RET REQ TY I (W) 4" (SLD) (100M LF 4280.000 0.55 1 0.370
89992022 HPPM W / RET REQ TY I (Y) 4" (SLD) (100M LF 4280.000 0.55 1 0.370