Tabulation of Bids for Project STP 2B20(067)HES
Use this interactive Tableau dashboard to display bidding information on projects let through statewide and local district letting for the past 24 months.
The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.
Text version of this page | |||
County: | BASTROP | Let Date: | 07/08/20 |
Type: | SAFETY IMPROVEMENT PROJECT | Seq No: | 3050 |
Time: | 190 WORKING DAYS | Project ID: | STP 2B20(067)HES |
Highway: | SH 304 | Contract #: | 07203050 |
Length: | 7.087 | CCSJ: | 0573-01-039 |
Limits: | |||
From: | 0.047 MI SOUTH OF FM 2571 | Check: | $100,000 |
To: | 0.100 MI SOUTH OF FM 535 | Misc Cost: | $12,000.00 |
Estimate | $8,646,475.28 | % Over/Under | Company |
Bidder 1 | $7,305,240.14 | -15.51% | BIG CREEK CONSTRUCTION, LTD. |
Bidder 2 | $7,784,648.38 | -9.97% | HUNTER INDUSTRIES, LTD. |
Bidder 3 | $7,800,185.70 | -9.79% | ANGEL BROTHERS HOLDINGS CORP. |
Bidder 4 | $8,634,829.32 | -0.13% | TIERRA LEASE SERVICE, LLC |
Bidder 5 | $9,416,266.09 | +8.90% | JOE BLAND CONSTRUCTION, L.P. |
Item Code | Description | Unit | Quantity | Unit Est. | Bidder | Unit Bid |
1006002 | PREPARING ROW | STA | 375.000 | 1,300.00 | 1 2 3 4 5 | 250.000 458.370 600.000 120.000 525.000 |
1056045 | REMOVING STAB BASE AND ASPH PAV (2"-8") | SY | 24,235.000 | 3.20 | 1 2 3 4 5 | 3.000 4.380 4.000 5.750 6.250 |
1106001 | EXCAVATION (ROADWAY) | CY | 32,492.000 | 8.00 | 1 2 3 4 5 | 8.000 9.990 10.000 10.250 8.500 |
1326003 | EMBANKMENT (FINAL)(ORD COMP)(TY B) | CY | 18,958.000 | 12.00 | 1 2 3 4 5 | 8.000 9.990 6.000 7.250 6.500 |
1606003 | FURNISHING AND PLACING TOPSOIL (4") | SY | 145,467.000 | 1.00 | 1 2 3 4 5 | 0.500 1.120 0.400 1.500 1.750 |
1646009 | BROADCAST SEED (TEMP) (WARM) | SY | 145,467.000 | 0.10 | 1 2 3 4 5 | 0.090 0.100 0.080 0.100 0.200 |
1646011 | BROADCAST SEED (TEMP) (COOL) | SY | 145,467.000 | 0.10 | 1 2 3 4 5 | 0.090 0.100 0.080 0.100 0.200 |
1686001 | VEGETATIVE WATERING | MG | 3,606.000 | 15.00 | 1 2 3 4 5 | 5.000 18.930 10.000 20.000 45.000 |
1696001 | SOIL RETENTION BLANKETS (CL 1) (TY A) | SY | 145,467.000 | 0.90 | 1 2 3 4 5 | 0.700 0.690 0.650 0.750 1.000 |
2476366003 | FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS) | CY | 39,747.000 | 50.00 | 1 2 3 4 5 | 50.000 48.730 49.000 58.000 54.650 |
3106001 | PRIME COAT (MULTI OPTION) | GAL | 21,009.000 | 3.70 | 1 2 3 4 5 | 3.500 3.680 3.600 3.750 4.000 |
3476001002 | TOM (ASPHALT) PG 76-22 | TON | 684.000 | 100.00 | 1 2 3 4 5 | 90.000 95.670 100.000 102.000 120.000 |
3476006002 | TOM - C (AGGREGATE) SAC - B | TON | 10,306.000 | 99.00 | 1 2 3 4 5 | 90.000 95.670 100.000 102.000 120.000 |
3476008002 | TACK COAT | GAL | 15,393.000 | 2.50 | 1 2 3 4 5 | 3.000 2.960 2.500 3.000 4.100 |
3516002 | FLEXIBLE PAVEMENT STRUCTURE REPAIR(6") | SY | 9,154.000 | 40.00 | 1 2 3 4 5 | 35.000 25.910 35.000 40.000 40.000 |
4006005 | CEM STABIL BKFL | CY | 65.000 | 100.00 | 1 2 3 4 5 | 150.000 139.000 115.000 185.000 225.000 |
4026001 | TRENCH EXCAVATION PROTECTION | LF | 12.000 | 4.60 | 1 2 3 4 5 | 50.000 10.000 100.000 60.000 1.250 |
4036001 | TEMPORARY SPL SHORING | SF | 1,189.000 | 20.00 | 1 2 3 4 5 | 40.000 20.000 20.000 32.000 26.000 |
4326002 | RIPRAP (CONC)(5 IN) | CY | 38.000 | 460.00 | 1 2 3 4 5 | 450.000 421.000 430.000 580.000 450.000 |
4326045 | RIPRAP (MOW STRIP)(4 IN) | CY | 78.000 | 425.00 | 1 2 3 4 5 | 450.000 420.000 450.000 575.000 475.000 |
4326051 | RIPRAP (STONE COMMON)(GROUT)(18 IN) | CY | 40.000 | 265.00 | 1 2 3 4 5 | 250.000 251.510 340.000 255.000 250.000 |
4606002 | CMP (GAL STL 18 IN) | LF | 14.000 | 65.00 | 1 2 3 4 5 | 75.000 186.000 145.000 150.000 215.000 |
4606005 | CMP (GAL STL 36 IN) | LF | 4.000 | 100.00 | 1 2 3 4 5 | 150.000 374.000 440.000 250.000 275.000 |
4646003001 | RC PIPE (CL III)(18 IN) | LF | 812.000 | 65.00 | 1 2 3 4 5 | 60.000 80.000 60.000 80.000 90.000 |
4646005001 | RC PIPE (CL III)(24 IN) | LF | 216.000 | 80.00 | 1 2 3 4 5 | 75.000 113.000 107.000 84.000 115.000 |
4646007001 | RC PIPE (CL III)(30 IN) | LF | 82.000 | 105.00 | 1 2 3 4 5 | 100.000 120.000 100.000 96.000 125.000 |
4646009001 | RC PIPE (CL III)(42 IN) | LF | 18.000 | 165.00 | 1 2 3 4 5 | 200.000 500.000 620.000 165.000 225.000 |
4646010001 | RC PIPE (CL III)(48 IN) | LF | 22.000 | 195.00 | 1 2 3 4 5 | 250.000 455.000 350.000 200.000 250.000 |
4646030001 | RC PIPE (ARCH)(CL III)(DES 1) | LF | 614.000 | 175.00 | 1 2 3 4 5 | 130.000 160.000 125.000 160.000 160.000 |
4666246 | HEADWALL (CH - PW - 0)(DIA=36 IN)(MOD) | EA | 1.000 | 18,772.00 | 1 2 3 4 5 | 25,000.000 19,990.000 21,000.000 26,000.000 9,500.000 |
4666252 | HEADWALL (CH - PW - S)(DIA= 48IN) (MOD) | EA | 2.000 | 18,526.00 | 1 2 3 4 5 | 27,500.000 22,490.000 22,000.000 28,000.000 10,500.000 |
4676343 | SET (TY II) (18 IN) (CMP) (3: 1) (C) | EA | 1.000 | 800.00 | 1 2 3 4 5 | 750.000 990.000 1,100.000 1,250.000 800.000 |
4676363 | SET (TY II) (18 IN) (RCP) (6: 1) (P) | EA | 51.000 | 1,050.00 | 1 2 3 4 5 | 800.000 1,090.000 1,300.000 1,700.000 900.000 |
4676390 | SET (TY II) (24 IN) (RCP) (4: 1) (C) | EA | 1.000 | 1,690.00 | 1 2 3 4 5 | 900.000 1,690.000 1,500.000 2,000.000 1,300.000 |
4676394 | SET (TY II) (24 IN) (RCP) (6: 1) (C) | EA | 2.000 | 1,715.00 | 1 2 3 4 5 | 950.000 1,990.000 1,500.000 2,000.000 1,350.000 |
4676395 | SET (TY II) (24 IN) (RCP) (6: 1) (P) | EA | 10.000 | 1,400.00 | 1 2 3 4 5 | 1,000.000 1,690.000 1,500.000 2,000.000 1,100.000 |
4676423 | SET (TY II) (30 IN) (RCP) (6: 1) (P) | EA | 4.000 | 2,500.00 | 1 2 3 4 5 | 1,500.000 2,990.000 1,800.000 2,600.000 2,300.000 |
4676463 | SET (TY II) (42 IN) (RCP) (4: 1) (C) | EA | 4.000 | 3,600.00 | 1 2 3 4 5 | 3,000.000 4,740.000 2,700.000 3,000.000 1,950.000 |
4676519 | SET (TY II) (DES 1) (RCP) (6: 1) (P) | EA | 42.000 | 2,000.00 | 1 2 3 4 5 | 1,000.000 1,990.000 1,800.000 2,425.000 2,100.000 |
4966004 | REMOV STR (SET) | EA | 29.000 | 580.00 | 1 2 3 4 5 | 500.000 549.000 300.000 500.000 1,000.000 |
4966006 | REMOV STR (HEADWALL) | EA | 1.000 | 1,700.00 | 1 2 3 4 5 | 2,000.000 3,490.000 800.000 1,000.000 1,200.000 |
4966050 | REMOV STR (DRIVEWAY CULVERT) | EA | 54.000 | 650.00 | 1 2 3 4 5 | 350.000 529.000 330.000 500.000 600.000 |
5006001 | MOBILIZATION | LS | 1.000 | 628,852.98 | 1 2 3 4 5 | 525,000.000 664,272.090 500,000.000 500,000.000 930,000.000 |
5026001007 | BARRICADES, SIGNS AND TRAFFIC HANDLING | MO | 12.000 | 8,000.00 | 1 2 3 4 5 | 2,500.000 4,540.620 5,000.000 1,750.000 13,465.000 |
5066002004 | ROCK FILTER DAMS (INSTALL) (TY 2) | LF | 780.000 | 30.00 | 1 2 3 4 5 | 25.000 31.240 40.000 27.000 33.850 |
5066011004 | ROCK FILTER DAMS (REMOVE) | LF | 780.000 | 10.00 | 1 2 3 4 5 | 5.000 11.810 9.000 10.000 16.930 |
5066038004 | TEMP SEDMT CONT FENCE (INSTALL) | LF | 12,498.000 | 2.50 | 1 2 3 4 5 | 2.500 3.200 2.500 2.250 4.510 |
5066039004 | TEMP SEDMT CONT FENCE (REMOVE) | LF | 12,498.000 | 0.75 | 1 2 3 4 5 | 0.700 0.770 0.500 0.850 1.130 |
5306005 | DRIVEWAYS (ACP) | SY | 8,147.000 | 38.00 | 1 2 3 4 5 | 25.000 31.710 30.000 29.500 19.500 |
5336002 | RUMBLE STRIPS (CENTERLINE) | LF | 29,699.000 | 0.15 | 1 2 3 4 5 | 0.250 0.370 0.250 0.170 0.260 |
5406001001 | MTL W-BEAM GD FEN (TIM POST) | LF | 1,337.500 | 21.50 | 1 2 3 4 5 | 25.000 18.900 19.000 22.000 21.330 |
5406016001 | DOWNSTREAM ANCHOR TERMINAL SECTION | EA | 2.000 | 1,150.00 | 1 2 3 4 5 | 1,100.000 900.000 950.000 1,200.000 1,015.570 |
5406017001 | MTL BM GD FEN (LONG SPAN SYSTEM) | LF | 50.000 | 26.00 | 1 2 3 4 5 | 20.000 19.150 20.000 23.000 21.610 |
5426001 | REMOVE METAL BEAM GUARD FENCE | LF | 250.000 | 2.00 | 1 2 3 4 5 | 3.000 2.500 2.500 2.200 2.820 |
5446001 | GUARDRAIL END TREATMENT (INSTALL) | EA | 8.000 | 2,700.00 | 1 2 3 4 5 | 2,750.000 2,570.000 2,600.000 3,240.000 2,900.010 |
5446003 | GUARDRAIL END TREATMENT (REMOVE) | EA | 2.000 | 250.00 | 1 2 3 4 5 | 200.000 250.000 250.000 220.000 282.100 |
5606001 | MAILBOX INSTALL-S (TWG-POST) TY 1 | EA | 42.000 | 200.00 | 1 2 3 4 5 | 160.000 175.000 180.000 200.000 180.000 |
5606002 | MAILBOX INSTALL-D (TWG-POST) TY 1 | EA | 4.000 | 250.00 | 1 2 3 4 5 | 200.000 240.000 250.000 265.000 210.000 |
5606003 | MAILBOX INSTALL-M (TWG-POST) TY 1 | EA | 4.000 | 425.00 | 1 2 3 4 5 | 350.000 380.000 390.000 420.000 385.000 |
6446001 | IN SM RD SN SUP&AM TY10BWG(1)SA(P) | EA | 23.000 | 485.00 | 1 2 3 4 5 | 450.000 365.000 370.000 400.000 475.000 |
6446002 | IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM) | EA | 10.000 | 600.00 | 1 2 3 4 5 | 600.000 495.000 500.000 550.000 500.000 |
6446004 | IN SM RD SN SUP&AM TY10BWG(1)SA(T) | EA | 21.000 | 575.00 | 1 2 3 4 5 | 525.000 430.000 440.000 475.000 550.000 |
6446030 | IN SM RD SN SUP&AM TYS80(1)SA(T) | EA | 2.000 | 675.00 | 1 2 3 4 5 | 725.000 670.000 680.000 725.000 720.000 |
6446033 | IN SM RD SN SUP&AM TYS80(1)SA(U) | EA | 4.000 | 785.00 | 1 2 3 4 5 | 650.000 620.000 630.000 675.000 830.000 |
6446036 | IN SM RD SN SUP&AM TYS80(1)SA(U-BM) | EA | 4.000 | 850.00 | 1 2 3 4 5 | 850.000 725.000 730.000 800.000 925.000 |
6446076 | REMOVE SM RD SN SUP&AM | EA | 58.000 | 90.00 | 1 2 3 4 5 | 75.000 65.000 100.000 75.000 90.000 |
6586049 | INSTL OM ASSM (OM-2Z)(FLX)GND(BI) | EA | 39.000 | 80.00 | 1 2 3 4 5 | 50.000 58.000 59.000 65.000 72.000 |
6586062 | INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | EA | 23.000 | 25.00 | 1 2 3 4 5 | 20.000 27.000 29.000 30.000 29.000 |
6626004 | WK ZN PAV MRK NON-REMOV (W)4"(SLD) | LF | 74,840.000 | 0.20 | 1 2 3 4 5 | 0.110 0.100 0.100 0.120 0.250 |
6626016 | WK ZN PAV MRK NON-REMOV (W)24"(SLD) | LF | 96.000 | 3.50 | 1 2 3 4 5 | 3.000 3.000 3.200 3.250 6.770 |
6626032 | WK ZN PAV MRK NON-REMOV (Y)4"(BRK) | LF | 6,150.000 | 0.20 | 1 2 3 4 5 | 0.110 0.100 0.100 0.120 0.270 |
6626034 | WK ZN PAV MRK NON-REMOV (Y)4"(SLD) | LF | 43,693.000 | 0.20 | 1 2 3 4 5 | 0.110 0.100 0.100 0.120 0.250 |
6626075 | WK ZN PAV MRK REMOV (W)24"(SLD) | LF | 192.000 | 8.50 | 1 2 3 4 5 | 6.000 6.000 6.400 6.500 6.770 |
6626111 | WK ZN PAV MRK SHT TERM (TAB)TY Y-2 | EA | 936.000 | 1.00 | 1 2 3 4 5 | 1.500 1.670 1.000 1.000 1.130 |
6666036007 | REFL PAV MRK TY I (W)8"(SLD)(100MIL) | LF | 765.000 | 0.80 | 1 2 3 4 5 | 1.000 0.700 0.760 0.750 0.900 |
6666048007 | REFL PAV MRK TY I (W)24"(SLD)(100MIL) | LF | 177.000 | 6.25 | 1 2 3 4 5 | 12.000 12.000 13.000 13.000 7.900 |
6666054007 | REFL PAV MRK TY I (W)(ARROW)(100MIL) | EA | 7.000 | 150.00 | 1 2 3 4 5 | 100.000 100.000 110.000 110.000 169.260 |
6666078007 | REFL PAV MRK TY I (W)(WORD)(100MIL) | EA | 3.000 | 170.00 | 1 2 3 4 5 | 110.000 110.000 120.000 120.000 169.260 |
6666093007 | REFL PAV MRK TY I (W)(RR XING)(100MIL) | EA | 1.000 | 575.00 | 1 2 3 4 5 | 250.000 250.000 270.000 275.000 501.010 |
6666283007 | REF PROF PAV MRK TY I(W)4"(SLD)(090MIL) | LF | 74,220.000 | 0.60 | 1 2 3 4 5 | 0.600 0.600 0.650 0.650 0.720 |
6666312007 | RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL) | LF | 6,150.000 | 0.40 | 1 2 3 4 5 | 0.300 0.300 0.320 0.320 0.410 |
6666315007 | RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) | LF | 47,139.000 | 0.35 | 1 2 3 4 5 | 0.300 0.300 0.320 0.320 0.370 |
6726007 | REFL PAV MRKR TY I-C | EA | 39.000 | 4.00 | 1 2 3 4 5 | 3.500 3.500 3.800 3.850 4.510 |
6726009 | REFL PAV MRKR TY II-A-A | EA | 1,212.000 | 3.50 | 1 2 3 4 5 | 3.500 3.500 3.800 3.850 3.880 |
30766043 | D-GR HMA TY-D PG70-22 (LEVEL-UP) | TON | 3,021.000 | 88.00 | 1 2 3 4 5 | 80.000 67.590 84.000 105.000 96.760 |
30766048 | D-GR HMA TY-D PG76-22 | TON | 16,670.000 | 87.00 | 1 2 3 4 5 | 75.000 68.550 84.000 92.000 88.790 |
30766066 | TACK COAT | GAL | 7,323.000 | 2.50 | 1 2 3 4 5 | 3.000 2.960 2.500 3.000 4.550 |
60016002 | PORTABLE CHANGEABLE MESSAGE SIGN | EA | 2.000 | 8,500.00 | 1 2 3 4 5 | 8,500.000 8,118.750 5,000.000 5,000.000 10,000.000 |
61856002002 | TMA (STATIONARY) | DAY | 90.000 | 220.00 | 1 2 3 4 5 | 200.000 250.060 400.000 250.000 280.000 |
61856003002 | TMA (MOBILE OPERATION) | HR | 80.000 | 60.00 | 1 2 3 4 5 | 50.000 81.190 35.000 25.000 90.000 |