Tabulation of Bids for Project STP 1402(058)

Last Update: Thursday, September 11, 2014
Text version of this page
County: TRAVIS Let Date: 09/11/14
Type: REHAB ROADWAY, ADD 6' SHOULDERS Seq No: 3236
Time: 247 WORKING DAYS Project ID: STP 1402(058)
Highway: FM 973 Contract #: 09143236
Length: 7.903 CCSJ: 1200-03-052
Limits:  
From: 0.159 MI. SOUTH OF BLAKE MANOR RD. Check: $63,000.00
To: DECKER CREEK Misc Cost: $65,000.00
Estimate $3,483,538.20 % Over/Under Company
Bidder 1 $3,332,550.36 -4.33% ANGEL BROTHERS ENTERPRISES, LTD.
Bidder 2 $3,398,584.99 -2.44% HUNTER INDUSTRIES, LTD.
Bidder 3 $3,520,754.46 +1.07% ACE ASPHALT OF ARIZONA, INC.
Bidder 4 $3,591,400.48 +3.10% M.A. SMITH CONTRACTING COMPANY, INC.
Bidder 5 $4,095,467.65 +17.57% AARON CONCRETE CONTRACTORS, L.P.
Bidder 6 $4,313,679.97 +23.83% DAN WILLIAMS COMPANY
Item Code Description Unit Quantity Unit Est. Bidder Unit Bid
1002002002 PREPARING ROW STA 204.160 850.00 1
2
3
4
5
6
1000.000
594.000
750.000
900.000
1200.000
1000.000
1102001 EXCAVATION (ROADWAY) CY 9786.000 20.00 1
2
3
4
5
6
15.000
17.970
14.500
15.000
19.000
22.000
1322003 EMBANKMENT (FINAL) (ORD COMP) (TY B) CY 1856.000 17.00 1
2
3
4
5
6
10.000
14.640
6.500
10.000
9.000
44.000
1602003 FURNISHING AND PLACING TOPSOIL (4") SY 32475.000 1.30 1
2
3
4
5
6
1.000
1.010
2.000
1.200
0.800
2.500
1642023002 CELL FBR MLCH SEED (PERM) (RURAL) (CLAY) SY 32475.000 0.20 1
2
3
4
5
6
0.240
0.240
1.100
0.350
0.300
0.380
1642029002 CELL FBR MLCH SEED (TEMP) (WARM) SY 15752.000 0.25 1
2
3
4
5
6
0.200
0.200
0.320
0.320
0.200
0.270
1642031002 CELL FBR MLCH SEED (TEMP) (COOL) SY 15752.000 0.25 1
2
3
4
5
6
0.200
0.200
0.310
0.320
0.200
0.270
1682001 VEGETATIVE WATERING MG 970.000 20.00 1
2
3
4
5
6
18.000
23.310
35.000
17.000
43.000
20.000
1692001002 SOIL RETENTION BLANKETS (CL 1) (TY A) SY 32475.000 1.00 1
2
3
4
5
6
1.150
1.150
1.290
1.400
1.300
0.950
2472366033 FL BS (CMP IN PLC) (TY A GR 5) (FNAL POS CY 9323.000 35.00 1
2
3
4
5
6
0.000
43.020
38.000
0.000
74.000
0.000
3102005 PRIME COAT (MC - 30 OR AE - P) GAL 6918.000 4.50 1
2
3
4
5
6
4.700
4.200
5.000
5.000
4.100
5.250
3162706016 ASPH (TIER II) GAL 35513.000 3.90 1
2
3
4
5
6
3.900
3.990
4.550
5.000
4.100
4.500
3162718016 AGGR (TIER II) CY 736.000 71.50 1
2
3
4
5
6
60.000
51.200
88.180
106.000
95.000
65.000
3512006 FLEXIBLE PAVEMENT STRUCTURE REPAIR (10") SY 4000.000 48.00 1
2
3
4
5
6
52.000
48.020
50.250
62.000
61.000
56.000
3542020 PLANE ASPH CONC PAV (0" TO 1") SY 3075.000 2.05 1
2
3
4
5
6
4.000
4.660
2.210
1.000
4.000
5.000
3542100 PLANE ASPH CONC PAV (5") SY 4101.000 5.00 1
2
3
4
5
6
2.400
4.660
3.730
4.400
11.000
4.000
4322002 RIPRAP (CONC) (5 IN) CY 204.000 350.00 1
2
3
4
5
6
340.000
385.000
399.950
350.000
400.000
600.000
4322030 RIPRAP (CONC) (CL C) CY 6.000 500.00 1
2
3
4
5
6
700.000
850.000
555.670
422.000
1200.000
1200.000
4322039 RIPRAP (MOW STRIP) (4 IN) CY 153.000 405.00 1
2
3
4
5
6
400.000
450.000
450.250
440.000
480.000
450.000
4602015 CMP AR (GAL STL DES 3) LF 3.000 100.00 1
2
3
4
5
6
370.000
275.000
74.850
200.000
410.000
350.000
4602017 CMP AR (GAL STL DES 5) LF 36.000 115.00 1
2
3
4
5
6
170.000
150.000
105.750
225.000
260.000
140.000
4642005006 RC PIPE (CL III) (24 IN) LF 13.000 85.00 1
2
3
4
5
6
275.000
210.000
63.100
175.000
345.000
450.000
4642007006 RC PIPE (CL III) (30 IN) LF 19.000 95.00 1
2
3
4
5
6
285.000
225.000
83.000
200.000
280.000
350.000
4672211 SET (TY II) (24 IN) (RCP) (3: 1) (C) EA 1.000 950.00 1
2
3
4
5
6
1600.000
1700.000
1314.000
2000.000
3000.000
1100.000
4672213 SET (TY II) (30 IN) (RCP) (3: 1) (C) EA 2.000 1350.00 1
2
3
4
5
6
1700.000
2100.000
1695.000
2100.000
3100.000
1300.000
4672224 SET (TY II) (24 IN) (RCP) (4: 1) (C) EA 3.000 1350.00 1
2
3
4
5
6
1600.000
2000.000
1295.000
2000.000
3000.000
1300.000
4672225 SET (TY II) (30 IN) (RCP) (4: 1) (C) EA 2.000 1850.00 1
2
3
4
5
6
2300.000
2000.000
1495.000
2100.000
3400.000
1450.000
4672323 SET (TY II) (DES 3) (CMP) (4: 1) (C) EA 1.000 1750.00 1
2
3
4
5
6
1300.000
1600.000
1495.000
2000.000
2100.000
1500.000
4672325 SET (TY II) (DES 5) (CMP) (4: 1) (C) EA 4.000 2100.00 1
2
3
4
5
6
1900.000
2400.000
2195.000
2200.000
3100.000
2500.000
4802001 CLEAN EXIST CULVS EA 3.000 1850.00 1
2
3
4
5
6
1600.000
2500.000
1000.000
3000.000
3800.000
2100.000
4962004 REMOV STR (SET) EA 13.000 425.00 1
2
3
4
5
6
250.000
800.000
400.000
250.000
750.000
400.000
5002001011 MOBILIZATION LS 1.000 318000.00 1
2
3
4
5
6
235000.000
291737.380
218610.000
140000.000
250000.000
359000.000
5022001033 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 16.000 5000.00 1
2
3
4
5
6
4000.000
2020.100
4001.000
2500.000
1200.000
10000.000
5302010006 DRIVEWAYS (CONC) SY 49.000 85.00 1
2
3
4
5
6
90.000
85.000
65.950
100.000
82.000
145.000
5302011006 DRIVEWAYS (ACP) SY 1875.000 41.50 1
2
3
4
5
6
45.000
39.420
38.260
35.000
62.000
65.000
5302017006 TURNOUTS (ACP) SY 42.000 60.00 1
2
3
4
5
6
45.000
181.170
50.250
100.000
67.000
35.000
5402001031 MTL W - BEAM GD FEN (TIM POST) LF 2100.000 17.00 1
2
3
4
5
6
18.000
18.000
18.720
20.000
20.000
17.500
5402011031 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA 20.000 1500.00 1
2
3
4
5
6
1300.000
1250.000
1363.550
1500.000
1100.000
1400.000
5422001 REMOVING METAL BEAM GUARD FENCE LF 1825.000 2.00 1
2
3
4
5
6
1.000
1.000
2.690
1.750
1.100
1.200
5442001 GUARDRAIL END TREATMENT (INSTALL) EA 24.000 2238.00 1
2
3
4
5
6
2000.000
1955.000
2052.360
2400.000
2200.000
2100.000
5442003 GUARDRAIL END TREATMENT (REMOVE) EA 20.000 221.00 1
2
3
4
5
6
250.000
250.000
250.500
200.000
270.000
190.000
5602015001 MAILBOX INSTALL - S (TWW - POST) TY 4 FN EA 7.000 190.00 1
2
3
4
5
6
135.000
170.000
260.000
195.000
185.000
180.000
6442001 IN SM RD SN SUP & AM TY10BWG (1) SA (P) EA 13.000 408.00 1
2
3
4
5
6
373.000
295.000
402.000
425.000
320.000
310.000
6442004 IN SM RD SN SUP & AM TY10BWG (1) SA (T) EA 17.000 498.00 1
2
3
4
5
6
420.000
384.000
487.000
550.000
420.000
400.000
6442025 IN SM RD SN SUP & AM TYS80 (1) SA (T) EA 1.000 800.00 1
2
3
4
5
6
635.000
571.000
612.500
700.000
625.000
575.000
6442042 IN SM RD SN SUP & AM TYS80 (2) SA (P) EA 2.000 1200.00 1
2
3
4
5
6
1250.000
1138.000
1150.000
1500.000
1300.000
1200.000
6442056 RELOCATE SM RD SN SUP & AM TY 10BWG EA 4.000 354.00 1
2
3
4
5
6
276.000
245.000
1444.960
450.000
270.000
250.000
6442060 REMOVE SM RD SN SUP & AM EA 29.000 68.00 1
2
3
4
5
6
100.000
45.000
77.290
100.000
50.000
50.000
6582240 INSTL DEL ASSM (D - SW) SZ 1 (FLX) GF2 EA 39.000 29.00 1
2
3
4
5
6
10.000
28.000
30.650
40.000
30.000
12.000
6582256 INSTL DEL ASSM (D - SW) SZ 2 (WC) GND (B EA 64.000 46.00 1
2
3
4
5
6
35.000
45.000
50.000
50.000
50.000
36.000
6582258 INSTL DEL ASSM (D - SW) SZ (TYC) CTB EA 18.000 18.00 1
2
3
4
5
6
9.000
18.000
16.000
14.000
20.000
10.000
6582314 INSTL OM ASSM (OM - 2X) (WC) GND EA 90.000 44.00 1
2
3
4
5
6
38.000
45.000
59.530
50.000
50.000
39.000
6622115 WK ZN PAV MRK SHT TERM (TAB) TY Y - 2 EA 2042.000 0.90 1
2
3
4
5
6
1.000
1.550
1.160
25.000
1.800
1.600
6662012 REFL PAV MRK TY I (W) 4" (SLD) (100MIL) LF 41220.000 0.30 1
2
3
4
5
6
0.320
0.320
0.580
0.380
0.300
0.350
6662048 REFL PAV MRK TY I (W) 24" (SLD) (100MIL) LF 361.000 5.40 1
2
3
4
5
6
4.300
4.220
6.870
4.200
6.300
3.800
6662054 REFL PAV MRK TY I (W) (ARROW) (100MIL) EA 14.000 104.00 1
2
3
4
5
6
90.000
90.000
117.230
150.000
68.000
135.000
6662105 REFL PAV MRK TY I (Y) 4" (BRK) (100MIL) LF 816.000 0.30 1
2
3
4
5
6
0.320
0.320
0.560
0.390
0.400
0.360
6662111 REFL PAV MRK TY I (Y) 4" (SLD) (100MIL) LF 4320.000 0.30 1
2
3
4
5
6
0.320
0.320
0.570
0.390
0.350
0.360
6662132 REFL PAV MRK TY I (Y) 24" (SLD) (100MIL) LF 100.000 5.00 1
2
3
4
5
6
6.500
6.430
6.670
4.200
6.300
3.800
6662145 REF PAV MRK TY II (W) 4" (SLD) LF 41220.000 0.10 1
2
3
4
5
6
0.120
0.120
0.210
0.150
0.100
0.130
6662157 REF PAV MRK TY II (W) 24" (SLD) LF 361.000 2.20 1
2
3
4
5
6
1.000
1.000
2.890
2.220
2.350
2.100
6662160 REF PAV MRK TY II (W) (ARROW) EA 8.000 41.00 1
2
3
4
5
6
44.000
44.000
56.390
89.000
36.000
85.000
6662176 REF PAV MRK TY II (Y) 4" (BRK) LF 2481.000 0.20 1
2
3
4
5
6
0.120
0.120
0.230
0.150
0.100
0.140
6662178 REF PAV MRK TY II (Y) 4" (SLD) LF 35701.000 0.10 1
2
3
4
5
6
0.120
0.120
0.210
0.140
0.100
0.130
6662185 REF PAV MRK TY II (Y) 24" (SLD) LF 100.000 2.20 1
2
3
4
5
6
1.000
1.000
2.450
2.220
2.900
2.100
6722015034 REFL PAV MRKR TY II - A - A EA 583.000 3.75 1
2
3
4
5
6
3.000
3.000
4.020
5.560
3.100
6.000
11222002001 ROCK FILTER DAMS (INSTALL) (TY 2) LF 1315.000 22.00 1
2
3
4
5
6
17.000
19.750
10.000
25.000
22.000
21.500
11222003001 ROCK FILTER DAMS (INSTALL) (TY 3) LF 560.000 43.00 1
2
3
4
5
6
28.000
30.250
2.000
50.000
33.000
39.000
11222009001 ROCK FILTER DAMS (REMOVE) LF 1875.000 7.00 1
2
3
4
5
6
6.000
6.000
2.000
12.000
6.600
10.500
11222016001 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 622.000 15.00 1
2
3
4
5
6
10.000
14.600
10.000
12.000
16.000
10.500
11222019001 CONSTRUCTION EXITS (REMOVE) SY 622.000 6.50 1
2
3
4
5
6
5.000
6.000
2.000
10.000
6.600
8.500
11222037001 TEMPORARY SEDIMENT CONTROL FENCE INSTLL LF 10905.000 2.10 1
2
3
4
5
6
2.000
1.850
2.000
2.250
2.000
2.000
11222057001 TEMPORARY SEDIMENT CONTROL FENCE REMOVE LF 10905.000 1.00 1
2
3
4
5
6
0.150
0.150
1.000
0.500
0.200
0.260
32392001 TOM (ASPHALT) PG 76 - 22 TON 326.000 117.00 1
2
3
4
5
6
119.000
112.740
135.000
130.000
132.000
140.000
32392003 TOM (AGGREGATE) SAC A TON 4208.000 117.00 1
2
3
4
5
6
119.000
112.740
130.000
130.000
132.000
140.000
32682010 D - GR HMA TY - B PG70 - 22 TON 8746.000 68.00 1
2
3
4
5
6
68.000
70.560
75.000
78.000
76.000
95.000
52612002 GEOGRID BASE REINFORCEMENT (TY II) SY 42825.000 1.75 1
2
3
4
5
6
1.500
1.930
1.645
1.200
1.350
2.000
68342002002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 10250.00 1
2
3
4
5
6
10000.000
7825.040
8525.000
11000.000
8800.000
7500.000
80202008 REF PROF PAV MRK TY I (Y) 4" (SLD) (100M LF 31381.000 0.75 1
2
3
4
5
6
0.650
0.650
0.880
0.720
0.900
0.660
80202010 REF PROF PAV MRK TY I (Y) 4" (BRK) (100M LF 1665.000 1.00 1
2
3
4
5
6
0.650
0.650
0.980
0.780
1.050
0.750
2472392033 FL BS (CMP IN PLC) (TY D GR 5) (FNAL POS CY 9323.000 35.00 1
2
3
4
5
6
37.000
0.000
0.000
38.000
0.000
41.000