COUNTY: PECOS HIGHWAY: US 285 LENGTH: 1.06MI CONTROL NUMBER: 0139-08-037 DBE GOAL: 2.0 % PROJECT NUMBER: NH 2017(474) TYPE: ROADWAY WIDENING TIME FOR COMPLETION: 58 WORKING DAYSGUARANTY: 23,000.00 BIDS RECEIVED UNTIL: 1:00 PM MARCH 08, 2017*EST.COST: 1,168,399.93 BIDS WILL BE OPENED: 1:00 PM MARCH 08, 2017 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONCIRO BAEZA,PE ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 5100 W IH 20 200 E RIVERSIDEMIDLAND, TX 79703 AUSTIN TX 78704-1204432/694-2195 TO REQUEST A PROPOSAL CALL 512/416-2498 FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: 0.66 MILES NORTH OF IH 10 LIMITS TO: 1.72 MILES NORTH OF IH 10 ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 104 6009REMOVING CONC (RIPRAP)SY 105.0001 104 6018REMOVING CONC (DRIVEWAYS)CY 83.0002 110 6001EXCAVATION (ROADWAY)CY 7,846.0003 132 6011EMBANKMENT (ORIGINAL)(ORD COMP)(TY B)CY 865.0004 150 6002BLADINGHR 20.0005 216 6001PROOF ROLLINGHR 15.0006 247 6201FL BS (CMP IN PLC)(TY A GR 4) (8")SY 23,082.0007 247 6238FL BS (CMP IN PLC)(TY A GR 4)(12")SY 3,583.0008 310 6005PRIME COAT (AE-P)GAL 5,336.0009 315 6006FOG SEAL (SS-1H OR CSS-1H)GAL 5,319.00010 316 6126AGGR(TY-PB GR-4 SAC-A)CY 374.00011 316 6405ASPH (AC-20-5TR OR AC-20XP)GAL 17,856.00012 344 6119SUPERPAVE MIXTURES SP-D SAC-A PG70-22TON 2,927.00013 400 6005CEM STABIL BKFLCY 16.00014 432 6002RIPRAP (CONC)(5 IN)CY 27.00015 462 6045CONC BOX CULV (3 FT X 2 FT)(EXTEND)LF 10.00016 462 6054CONC BOX CULV (6 FT X 3 FT)(EXTEND)LF 13.00017 467 6112SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)EA 2.00018 467 6219SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1) (C)EA 4.00019 496 6042REMOV STR (SMALL)EA 2.00020 500 6001MOBILIZATIONLS 1.00021 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 4.00022 506 6042BIODEG EROSN CONT LOGS (INSTL) (18")LF 580.00023 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 580.00024 530 6004DRIVEWAYS (CONC)SY 83.00025 644 6001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA 9.00026 644 6007IN SM RD SN SUP&AM TY10BWG(1)SA(U)EA 1.00027 644 6076REMOVE SM RD SN SUP&AMEA 10.00028 658 6047INSTL OM ASSM (OM-2Y)(WC)GNDEA 4.00029 658 6060REMOVE DELIN & OBJECT MARKER ASSMSEA 6.00030 662 6004WK ZN PAV MRK NON-REMOV (W)4"(SLD)LF 16,794.00031 662 6034WK ZN PAV MRK NON-REMOV (Y)4"(SLD)LF 16,794.00032 662 6109WK ZN PAV MRK SHT TERM (TAB)TY WEA 1,464.00033 662 6110WK ZN PAV MRK SHT TERM (TAB)TY YEA 1,264.00034 666 6300RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)LF 2,439.00035 666 6303RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)LF 10,946.00036 666 6312RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)LF 2,439.00037 666 6315RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF 12,636.00038 672 6007REFL PAV MRKR TY I-CEA 122.00039 672 6009REFL PAV MRKR TY II-A-AEA 388.00040 677 6001ELIM EXT PAV MRK & MRKS (4")LF 16,368.00041 60016002PORTABLE CHANGEABLE MESSAGE SIGNEA 2.00042 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $40,000.00