COUNTY: LEON HIGHWAY: CR LENGTH: 0.0780MI CONTROL NUMBER: 0917-16-034 DBE GOAL: 3.5 % PROJECT NUMBER: BR 1502(027) TYPE: REPLACE EXISTING BRIDGE TIME FOR COMPLETION: 78 WORKING DAYSGUARANTY: 6,000.00 BIDS RECEIVED UNTIL: 1:00 PM FEBRUARY 09, 2016*EST.COST: 329,632.30 BIDS WILL BE OPENED: 1:00 PM FEBRUARY 09, 2016 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONDARLENE GOEHL ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 580 IH 45 NORTH 200 E RIVERSIDEHUNTSVILLE, TX 77320 AUSTIN TX 78704-1204936/295-3462 TO REQUEST A PROPOSAL CALL 512/416-2498 FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: ON CR 110 - LOCAL CR 348 LIMITS TO: AT BRUSHY CREEK RELIEF ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 4.1501 100 6009PREPARING ROW (TREE) (6" TO 24" DIA)EA 3.0002 110 6001EXCAVATION (ROADWAY)CY 389.0003 132 6006EMBANKMENT (FINAL)(DENS CONT)(TY C)CY 186.0004 160 6003FURNISHING AND PLACING TOPSOIL (4")SY 938.0005 164 6023CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)SY 938.0006 164 6029CELL FBR MLCH SEED(TEMP)(WARM)SY 469.0007 164 6031CELL FBR MLCH SEED(TEMP)(COOL)SY 469.0008 168 6001VEGETATIVE WATERINGMG 9.4009 247 6073FL BS (CMP IN PLC)(TY D GR 1-2) (6")SY 1,270.00010 400 6005CEM STABIL BKFLCY 62.00011 416 6003DRILL SHAFT (30 IN)LF 177.00012 420 6013CL C CONC (ABUT)CY 27.20013 422 6001REINF CONC SLABSF 1,439.00014 425 6001PRESTR CONC BOX BEAM (4B20)LF 218.00015 425 6002PRESTR CONC BOX BEAM (5B20)LF 109.00016 432 6033RIPRAP (STONE PROTECTION)(18 IN)CY 97.00017 450 6006RAIL (TY T223)LF 142.00018 496 6009REMOV STR (BRIDGE 0 - 99 FT LENGTH)EA 1.00019 500 6001MOBILIZATIONLS 1.00020 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 5.00021 506 6002ROCK FILTER DAMS (INSTALL) (TY 2)LF 75.00022 506 6011ROCK FILTER DAMS (REMOVE)LF 75.00023 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 585.00024 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 585.00025 540 6001MTL W-BEAM GD FEN (TIM POST)LF 62.50026 540 6007MTL BEAM GD FEN TRANS (TL2)EA 4.00027 540 6016DOWNSTREAM ANCHOR TERMINAL SECTIONEA 1.00028 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 3.00029 644 6001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA 1.00030 644 6076REMOVE SM RD SN SUP&AMEA 2.00031 658 6014INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)EA 2.00032 658 6016INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)EA 4.00033 658 6048INSTL OM ASSM (OM-2Z)(FLX)GNDEA 1.00034 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $7,220.00