Detail Letting Schedule for Bexar County (FY 2016)
Bexar County (FY 2016) |
CCSJ: 0017-09-100 | |||
District: | San Antonio | Let Date: | JUL 2016 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | CRX 17-9-100 | CSJ: | 0017-09-100 |
Description: | REPLANK CROSSING ON NB FRONTAGE ROAD EAST OF ZARZAMORA | Handling Code: |
XX |
Limits From: | 2900' SW OF SL 13 (SW MILITARY) | Fund Cat: | 10 |
Limits To: | 3400' SW OF SL 13 (SW MILITARY) | Estimate: | $30,080 |
Length: | 0.1 Miles | Actual: | $30,080 |
Back... |
Totals for 0017-09-100 | ||
---|---|---|---|
Length: | 0.1 Miles | ||
Estimate: | $30,080 | ||
Actual: | $30,080 | ||
CCSJ: 0017-09-101 | |||
District: | San Antonio | Let Date: | JUL 2016 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | CRX 17-9-101 | CSJ: | 0017-09-101 |
Description: | REPLANK CROSSING ON SB FRONTAGE ROAD EAST OF ZARZAMORA | Handling Code: |
XX |
Limits From: | 2850' SW OF SL 13 (SW MILITARY) | Fund Cat: | 10 |
Limits To: | 3350' SW OF SL 13 (SW MILITARY) | Estimate: | $30,080 |
Length: | 0.1 Miles | Actual: | $30,080 |
Back... |
Totals for 0017-09-101 | ||
Length: | 0.1 Miles | ||
Estimate: | $30,080 | ||
Actual: | $30,080 | ||
CCSJ: 0017-10-270 | |||
District: | San Antonio | Let Date: | MAR 2016 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | BR 2016(860) | CSJ: | 0017-10-270 |
Description: | MILL, SEAL COAT, OVERLAY AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | BROADWAY | Fund Cat: | 1 |
Limits To: | IH 410 S INC | Estimate: | $7,089,630 |
Length: | 5.6 Miles | Actual: | $5,439,587 |
Back... |
Totals for 0017-10-270 | ||
Length: | 5.6 Miles | ||
Estimate: | $7,089,630 | ||
Actual: | $5,439,587 | ||
CCSJ: 0017-10-272 | |||
District: | San Antonio | Let Date: | NOV 2015 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | STP 2016(297)HES | CSJ: | 0017-10-272 |
Description: | INSTALL WARNING / GUIDE SIGNS - OVERHEAD ADVANCE FLASHERS & | Handling Code: |
|
Limits From: | 0.3 MI W OF IH 37 | Fund Cat: | 8 |
Limits To: | 0.5 MI E OF IH 37 | Estimate: | $148,512 |
Length: | 0.8 Miles | Actual: | $194,592 |
District: | San Antonio | Let Date: | NOV 2015 |
Highway: | SH 85 | Let Status: | Actual |
Project ID: | STP 2016(298)HES | CSJ: | 0301-06-017 |
Description: | INSTALL OVERHEAD FLASHING BEACON, INTERSECTION SAFETY | Handling Code: |
|
Limits From: | AT FM 1582 | Fund Cat: | 8 |
Limits To: | . | Estimate: | $82,709 |
Length: | 0.2 Miles | Actual: | $84,931 |
District: | San Antonio | Let Date: | NOV 2015 |
Highway: | SH 211 | Let Status: | Actual |
Project ID: | STP 2016(299)HES | CSJ: | 3544-03-005 |
Description: | INSTALL OVERHEAD FLASHING BEACON, ADVANCE WARNING SIGNS WITH | Handling Code: |
|
Limits From: | AT FM 471 | Fund Cat: | 8 |
Limits To: | . | Estimate: | $56,071 |
Length: | 0.2 Miles | Actual: | $63,156 |
Back... |
Totals for 0017-10-272 | ||
Length: | 1.2 Miles | ||
Estimate: | $287,292 | ||
Actual: | $342,679 | ||
CCSJ: 0017-10-273 | |||
District: | San Antonio | Let Date: | APR 2016 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | BR 2016(406) | CSJ: | 0017-10-273 |
Description: | REPLACE BRIDGE AND APPROACHES | Handling Code: |
|
Limits From: | AT NEW BRAUNFELS AVENUE | Fund Cat: | 6 |
Limits To: | . | Estimate: | $4,547,404 |
Length: | 0.0 Miles | Actual: | $4,992,612 |
Back... |
Totals for 0017-10-273 | ||
Length: | 0.0 Miles | ||
Estimate: | $4,547,404 | ||
Actual: | $4,992,612 | ||
CCSJ: 0017-10-281 | |||
District: | San Antonio | Let Date: | JUL 2016 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | CRX 17-10-281 | CSJ: | 0017-10-281 |
Description: | REPLANKING CROSSING ON SB FROTNAGE ROAD WEST OF AT & T CENTER | Handling Code: |
XX |
Limits From: | 2.2 MI E OF US 281 | Fund Cat: | 10 |
Limits To: | 2.3 M I E OF US 281 | Estimate: | $60,160 |
Length: | 0.1 Miles | Actual: | $60,160 |
Back... |
Totals for 0017-10-281 | ||
Length: | 0.1 Miles | ||
Estimate: | $60,160 | ||
Actual: | $60,160 | ||
CCSJ: 0017-10-282 | |||
District: | San Antonio | Let Date: | JUL 2016 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | CRX 17-10-282 | CSJ: | 0017-10-282 |
Description: | REPLANK CROSSING ON NB FRONTAGE ROAD WEST OF AT & T CENTER | Handling Code: |
XX |
Limits From: | 2.1 MI E OF US 281 | Fund Cat: | 10 |
Limits To: | 2.2 MI E OF US 281 | Estimate: | $60,160 |
Length: | 0.1 Miles | Actual: | $54,144 |
Back... |
Totals for 0017-10-282 | ||
Length: | 0.1 Miles | ||
Estimate: | $60,160 | ||
Actual: | $54,144 | ||
CCSJ: 0024-08-133 | |||
District: | San Antonio | Let Date: | JUL 2016 |
Highway: | US 90 | Let Status: | Actual |
Project ID: | NH 1602(299) | CSJ: | 0024-08-133 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: |
|
Limits From: | LP 13 -W MILITARY DR | Fund Cat: | 10 |
Limits To: | CUPPLES ROAD | Estimate: | $1,201,308 |
Length: | 4.9 Miles | Actual: | $1,069,800 |
Back... |
Totals for 0024-08-133 | ||
Length: | 4.9 Miles | ||
Estimate: | $1,201,308 | ||
Actual: | $1,069,800 | ||
CCSJ: 0025-02-198 | |||
District: | San Antonio | Let Date: | JUN 2016 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | C 25-2-198 | CSJ: | 0025-02-198 |
Description: | CONSTRUCT GRADE SEPARATION AT WOODLAKE PARKWAY; INTERSECTION | Handling Code: |
|
Limits From: | FOSTER ROAD | Fund Cat: | 1 |
Limits To: | GRAYTOWN ROAD | Estimate: | $61,923,143 |
Length: | 6.3 Miles | Actual: | $63,752,806 |
District: | San Antonio | Let Date: | JUN 2016 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | ROW 25-2-206 | CSJ: | 0025-02-206 |
Description: | UTILITY ADJUSTMENTS | Handling Code: |
|
Limits From: | FOSTER ROAD | Fund Cat: | ROW |
Limits To: | GRAYTOWN ROAD | Estimate: | $4,273,696 |
Length: | 0.8 Miles | Actual: | $1,536,399 |
Back... |
Totals for 0025-02-198 | ||
Length: | 7.1 Miles | ||
Estimate: | $66,196,839 | ||
Actual: | $65,289,205 | ||
CCSJ: 0025-02-210 | |||
District: | San Antonio | Let Date: | AUG 2016 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | BR 1602(546) | CSJ: | 0025-02-210 |
Description: | REPLACE ABUTMENT, APPROACH SLAB, CLEAN & PAINT STRUCTURE | Handling Code: |
|
Limits From: | IH 10 EB AT AMANDA STREET | Fund Cat: | 6 |
Limits To: | . | Estimate: | $2,771,796 |
Length: | 0.8 Miles | Actual: | $2,671,455 |
District: | San Antonio | Let Date: | AUG 2016 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | BR 1602(546) | CSJ: | 0025-02-211 |
Description: | REPLACE ABUTMENT, APPROACH SLAB, CLEAN & PAINT STRUCTURE | Handling Code: |
|
Limits From: | IH 10 WB AT AMANDA STREET | Fund Cat: | 6 |
Limits To: | . | Estimate: | $2,135,168 |
Length: | 0.8 Miles | Actual: | $2,026,497 |
Back... |
Totals for 0025-02-210 | ||
Length: | 1.6 Miles | ||
Estimate: | $4,906,964 | ||
Actual: | $4,697,952 | ||
CCSJ: 0072-07-068 | |||
District: | San Antonio | Let Date: | JUN 2016 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | STP 1602(184)MM | CSJ: | 0072-07-068 |
Description: | REPLACE EXISTING 2 LANE BRIDGE WITH 4 LANE BRIDGE, SIDEWALK, | Handling Code: |
|
Limits From: | AT FAIR OAKS PARKWAY | Fund Cat: | 1 |
Limits To: | . | Estimate: | $7,697,813 |
Length: | 0.3 Miles | Actual: | $7,586,328 |
Back... |
Totals for 0072-07-068 | ||
Length: | 0.3 Miles | ||
Estimate: | $7,697,813 | ||
Actual: | $7,586,328 | ||
CCSJ: 0073-08-181 | |||
District: | San Antonio | Let Date: | FEB 2016 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | NH 2016(872) | CSJ: | 0073-08-181 |
Description: | MILL, SEAL COAT, OVERLAY AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | IH 35 | Fund Cat: | 1 |
Limits To: | IH 410 | Estimate: | $13,248,768 |
Length: | 6.2 Miles | Actual: | $8,673,181 |
Back... |
Totals for 0073-08-181 | ||
Length: | 6.2 Miles | ||
Estimate: | $13,248,768 | ||
Actual: | $8,673,181 | ||
CCSJ: 0073-08-188 | |||
District: | San Antonio | Let Date: | JUL 2016 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | NH 1602(385) | CSJ: | 0073-08-188 |
Description: | MILL, SC, OVERLAY & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | 0.6 MI SOUTH OF NAKOMA | Fund Cat: | 1 |
Limits To: | LOOP 410 | Estimate: | $2,158,857 |
Length: | 1.9 Miles | Actual: | $1,963,891 |
District: | San Antonio | Let Date: | JUL 2016 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | NH 1602(385) | CSJ: | 0253-04-154 |
Description: | MILL, SC, OVERLAY & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | 0.4 MI SOUTH OF NAKOMA | Fund Cat: | 1 |
Limits To: | 0.6 MI SOUTH OF NAKOMA | Estimate: | $188,335 |
Length: | 0.1 Miles | Actual: | $167,835 |
Back... |
Totals for 0073-08-188 | ||
Length: | 2.0 Miles | ||
Estimate: | $2,347,192 | ||
Actual: | $2,131,726 | ||
CCSJ: 0521-01-050 | |||
District: | San Antonio | Let Date: | FEB 2016 |
Highway: | SL 13 | Let Status: | Actual |
Project ID: | NH 2016(668) | CSJ: | 0521-01-050 |
Description: | OVERLAY & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | FAIRLAWN | Fund Cat: | 1 |
Limits To: | IH 10 | Estimate: | $3,704,747 |
Length: | 6.0 Miles | Actual: | $2,849,994 |
Back... |
Totals for 0521-01-050 | ||
Length: | 6.0 Miles | ||
Estimate: | $3,704,747 | ||
Actual: | $2,849,994 | ||
CCSJ: 0849-01-046 | |||
District: | San Antonio | Let Date: | MAY 2016 |
Highway: | FM 471 | Let Status: | Actual |
Project ID: | PTF 2013(818) | CSJ: | 0849-01-046 |
Description: | EXPAND 2 TO 4 LANE DIVIDED WITH BIKE LANES | Handling Code: |
LC |
Limits From: | FM 1560 | Fund Cat: | 3 |
Limits To: | OLD FM 471 | Estimate: | $15,500,000 |
Length: | 2.3 Miles | Actual: | $14,483,918 |
Back... |
Totals for 0849-01-046 | ||
Length: | 2.3 Miles | ||
Estimate: | $15,500,000 | ||
Actual: | $14,483,918 | ||
CCSJ: 0915-00-159 | |||
District: | San Antonio | Let Date: | APR 2016 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2016(902) | CSJ: | 0915-00-159 |
Description: | DISTRICTWIDE GUIDESIGNS FY16 | Handling Code: |
|
Limits From: | DISTRICTWIDE GUIDESIGNS FY16 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $2,783,046 |
Length: | 0.0 Miles | Actual: | $2,452,828 |
Back... |
Totals for 0915-00-159 | ||
Length: | 0.0 Miles | ||
Estimate: | $2,783,046 | ||
Actual: | $2,452,828 | ||
CCSJ: 0915-00-166 | |||
District: | San Antonio | Let Date: | FEB 2016 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2016(669) | CSJ: | 0915-00-166 |
Description: | DISTRICTWIDE NON - SITE SPECIFIC TRAFFIC SIGNALS - FY 2016 | Handling Code: |
|
Limits From: | DISTRICTWIDE TRAFFIC CNTRL FY 2016 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $1,435,637 |
Length: | 0.0 Miles | Actual: | $1,355,868 |
Back... |
Totals for 0915-00-166 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,435,637 | ||
Actual: | $1,355,868 | ||
CCSJ: 0915-00-177 | |||
District: | San Antonio | Let Date: | OCT 2015 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2016(456) | CSJ: | 0915-00-177 |
Description: | DISTRICTWIDE ITS OPERATION AND MAINTENANCE FY 2015 - 2016 | Handling Code: |
XX |
Limits From: | DISTRICTWIDE ITS FY 2015-2016 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $2,000,000 |
Length: | 0.0 Miles | Actual: | $2,000,000 |
Back... |
Totals for 0915-00-177 | ||
Length: | 0.0 Miles | ||
Estimate: | $2,000,000 | ||
Actual: | $2,000,000 | ||
CCSJ: 0915-00-193 | |||
District: | San Antonio | Let Date: | FEB 2016 |
Highway: | VA | Let Status: | Actual |
Project ID: | NH 1602(134) | CSJ: | 0915-00-193 |
Description: | PURCHASE OF DYNAMIC MESSAGE SIGNS FOR EMERGENCY OPERATIONS | Handling Code: |
XX |
Limits From: | ON IH 10 FROM CITY OF BOERNE | Fund Cat: | 1 |
Limits To: | KIMBLE/KERR COUNTY LINE | Estimate: | $865,000 |
Length: | 0.0 Miles | Actual: | $865,000 |
Back... |
Totals for 0915-00-193 | ||
Length: | 0.0 Miles | ||
Estimate: | $865,000 | ||
Actual: | $865,000 | ||
CCSJ: 0915-12-459 | |||
District: | San Antonio | Let Date: | OCT 2015 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2016(259)MM | CSJ: | 0915-12-459 |
Description: | EXPAND 2 LANES TO 4 LANES WITH LEFT TURN LANES, BIKE LANES & | Handling Code: |
LC |
Limits From: | IN SAN ANTONIO ON UTSA BLVD | Fund Cat: | 3 |
Limits To: | FROM BABCOCK TO EDWARD XIMENES DR. | Estimate: | $10,606,000 |
Length: | 0.9 Miles | Actual: | $7,362,272 |
Back... |
Totals for 0915-12-459 | ||
Length: | 0.9 Miles | ||
Estimate: | $10,606,000 | ||
Actual: | $7,362,272 | ||
CCSJ: 0915-12-512 | |||
District: | San Antonio | Let Date: | OCT 2015 |
Highway: | NR | Let Status: | Actual |
Project ID: | STP 2016(459)MM | CSJ: | 0915-12-512 |
Description: | ALAMO AREA COMMUTE SOLUTION PGM - FY 2015 | Handling Code: |
XX |
Limits From: | ALAMO AREA MPO: IN BEXAR, COMAL, | Fund Cat: | 3 |
Limits To: | GUADALUPE & PARTIAL KENDALL COUNTY | Estimate: | $267,000 |
Length: | 0.0 Miles | Actual: | $267,000 |
Back... |
Totals for 0915-12-512 | ||
Length: | 0.0 Miles | ||
Estimate: | $267,000 | ||
Actual: | $267,000 | ||
CCSJ: 0915-12-516 | |||
District: | San Antonio | Let Date: | OCT 2015 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2016(260)MM | CSJ: | 0915-12-516 |
Description: | EXPAND FROM 2 TO 4 LANES, INCLUDING TURN LANES, SIDEWALKS & | Handling Code: |
LC |
Limits From: | ON CALLAGHAN RD, FROM IH 410 | Fund Cat: | 3 |
Limits To: | SPUR 421 (BANDERA RD.) | Estimate: | $10,703,426 |
Length: | 1.1 Miles | Actual: | $15,385,583 |
Back... |
Totals for 0915-12-516 | ||
Length: | 1.1 Miles | ||
Estimate: | $10,703,426 | ||
Actual: | $15,385,583 | ||
CCSJ: 0915-12-534 | |||
District: | San Antonio | Let Date: | JAN 2016 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2014(159)TE | CSJ: | 0915-12-534 |
Description: | LOW IMPACT LANDSCAPING AROUND DOWNTOWN SAN ANTONIO FREEWAY | Handling Code: |
LC |
Limits From: | VARIOUS LOCATIONS AROUND DOWNTOWN | Fund Cat: | 3 |
Limits To: | SAN ANTONIO | Estimate: | $1,251,785 |
Length: | 0.0 Miles | Actual: | $880,803 |
Back... |
Totals for 0915-12-534 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,251,785 | ||
Actual: | $880,803 | ||
CCSJ: 0915-12-551 | |||
District: | San Antonio | Let Date: | OCT 2015 |
Highway: | VA | Let Status: | Actual |
Project ID: | BR 1502(471) | CSJ: | 0915-12-551 |
Description: | REPLACE BRIDGE AND APPROACH RAILING OR ADD SAFETY END | Handling Code: |
|
Limits From: | VARIOUS BRIDGES IN BEXAR COUNY | Fund Cat: | 6 |
Limits To: | . | Estimate: | $1,606,764 |
Length: | 0.0 Miles | Actual: | $1,723,801 |
Back... |
Totals for 0915-12-551 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,606,764 | ||
Actual: | $1,723,801 | ||
CCSJ: 0915-12-555 | |||
District: | San Antonio | Let Date: | AUG 2016 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2016(870)TP | CSJ: | 0915-12-555 |
Description: | CONSTRUCT CURB RAMPS, CURBS, SIDEWALKS AND OTHER PEDESTRIAN | Handling Code: |
|
Limits From: | IN SAN ANTONIO ON US 281, LOOP 345 | Fund Cat: | 1 |
Limits To: | FM 78 AND FM 1516 CORRIDORS | Estimate: | $2,213,903 |
Length: | 0.0 Miles | Actual: | $1,771,321 |
District: | San Antonio | Let Date: | AUG 2016 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 1602(380) | CSJ: | 0915-12-559 |
Description: | BUS STOP AMENITIES INCLUDING SIDEWALKS AND PAD SITES ALONG | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS IN BEXAR COUNTY | Fund Cat: | 1 |
Limits To: | . | Estimate: | $4,427,949 |
Length: | 0.0 Miles | Actual: | $3,515,369 |
Back... |
Totals for 0915-12-555 | ||
Length: | 0.0 Miles | ||
Estimate: | $6,641,852 | ||
Actual: | $5,286,690 | ||
CCSJ: 0915-12-560 | |||
District: | San Antonio | Let Date: | JAN 2016 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2016(762)TP | CSJ: | 0915-12-560 |
Description: | BUS PURCHASE, PARK & RIDE FACILITIES, AND BUS STOP AMENITIES | Handling Code: |
TR |
Limits From: | VARIOUS LOCATIONS IN BEXAR COUNTY | Fund Cat: | 9 |
Limits To: | . | Estimate: | $20,520,000 |
Length: | 0.0 Miles | Actual: | $20,520,000 |
Back... |
Totals for 0915-12-560 | ||
Length: | 0.0 Miles | ||
Estimate: | $20,520,000 | ||
Actual: | $20,520,000 | ||
CCSJ: 0915-12-561 | |||
District: | San Antonio | Let Date: | JUN 2016 |
Highway: | VA | Let Status: | Actual |
Project ID: | C 915-12-561 | CSJ: | 0915-12-561 |
Description: | PARK & RIDE FACILITIES AND NEW BRAUNFELS AVE IMPROVEMENTS | Handling Code: |
XX |
Limits From: | VARIOUS LOCATIONS IN BEXAR COUNTY | Fund Cat: | 3 |
Limits To: | . | Estimate: | $9,000,000 |
Length: | 0.0 Miles | Actual: | $9,000,000 |
Back... |
Totals for 0915-12-561 | ||
Length: | 0.0 Miles | ||
Estimate: | $9,000,000 | ||
Actual: | $9,000,000 | ||
CCSJ: 0915-12-572 | |||
District: | San Antonio | Let Date: | FEB 2016 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 1602(055)FRS2 | CSJ: | 0915-12-572 |
Description: | INSTALL OVERHEAD CANTILEVERS, SIGNING, REPLACE CROSSING | Handling Code: |
XX |
Limits From: | ON RITTIMAN RD 2900' NW OF FM 78 | Fund Cat: | 8 |
Limits To: | 3200' NW OF FM 78 | Estimate: | $171,316 |
Length: | 0.1 Miles | Actual: | $171,316 |
Back... |
Totals for 0915-12-572 | ||
Length: | 0.1 Miles | ||
Estimate: | $171,316 | ||
Actual: | $171,316 | ||
CCSJ: 2104-02-027 | |||
District: | San Antonio | Let Date: | FEB 2016 |
Highway: | FM 1957 | Let Status: | Actual |
Project ID: | PTF 2013(996) | CSJ: | 2104-02-027 |
Description: | EXPAND FROM 2 LANES TO 4 LANE DIVIDED | Handling Code: |
LC |
Limits From: | SH 211 | Fund Cat: | 3 |
Limits To: | LOOP 1604 | Estimate: | $37,315,146 |
Length: | 4.7 Miles | Actual: | $46,305,602 |
Back... |
Totals for 2104-02-027 | ||
Length: | 4.7 Miles | ||
Estimate: | $37,315,146 | ||
Actual: | $46,305,602 | ||
CCSJ: 2452-01-056 | |||
District: | San Antonio | Let Date: | JUN 2016 |
Highway: | SL 1604 | Let Status: | Actual |
Project ID: | NH 1602(312) | CSJ: | 2452-01-056 |
Description: | EXPAND TO 4 LANE EXPRESSWAY - 4 NON - TOLL LANES | Handling Code: |
|
Limits From: | FM 1957 - POTRANCO RD | Fund Cat: | 1 |
Limits To: | FM 471 -CULEBRA RD | Estimate: | $71,546,720 |
Length: | 4.1 Miles | Actual: | $57,936,595 |
District: | San Antonio | Let Date: | JUN 2016 |
Highway: | SL 1604 | Let Status: | Actual |
Project ID: | ROW 2452-1-61 | CSJ: | 2452-01-061 |
Description: | ACQUISITION | Handling Code: |
|
Limits From: | FM 1957 - POTRANCO RD | Fund Cat: | ROW |
Limits To: | FM 471 -CULEBRA RD | Estimate: | $1,444,213 |
Length: | 4.1 Miles | Actual: | $4,564,355 |
Back... |
Totals for 2452-01-056 | ||
Length: | 8.2 Miles | ||
Estimate: | $72,990,933 | ||
Actual: | $62,500,950 | ||
CCSJ: 2452-01-059 | |||
District: | San Antonio | Let Date: | AUG 2016 |
Highway: | SL 1604 | Let Status: | Actual |
Project ID: | NH 1602(550) | CSJ: | 2452-01-059 |
Description: | EXPAND TO 4 LANE EXPRESSWAY - 4 NON - TOLL LANES | Handling Code: |
|
Limits From: | US 90 | Fund Cat: | 1 |
Limits To: | FM 1957 - POTRANCO RD | Estimate: | $80,452,312 |
Length: | 3.8 Miles | Actual: | $63,342,516 |
District: | San Antonio | Let Date: | AUG 2016 |
Highway: | SL 1604 | Let Status: | Actual |
Project ID: | ROW 2452-1-63 | CSJ: | 2452-01-063 |
Description: | UTILITY | Handling Code: |
|
Limits From: | US 90 | Fund Cat: | ROW |
Limits To: | FM 1957 - POTRANCO RD | Estimate: | $1,586,551 |
Length: | 3.8 Miles | Actual: | $795,898 |
Back... |
Totals for 2452-01-059 | ||
Length: | 7.6 Miles | ||
Estimate: | $82,038,863 | ||
Actual: | $64,138,414 |
|