Detail Letting Schedule for Dimmit County (FY 2016)

Last Update: Tuesday, December 6, 2016
Dimmit County (FY 2016)

CCSJ: 0037-15-009

District: Laredo Let Date: AUG 2016
Highway: FM 1917 Let Status: Actual
Project ID: STP 1602(503)HES CSJ: 0037-15-009
Description: PROVIDE ADDITIONAL PAVED SURFACE WIDTH Handling
Code:
 
Limits From: SH 85 Fund Cat: 8
Limits To: 0.243 MI S OF US 83 Estimate: $493,156
Length: 1.1 Miles Actual: $527,359
 
Back...

Totals for 0037-15-009
Length: 1.1 Miles
Estimate: $493,156
Actual: $527,359

CCSJ: 0300-03-066

District: Laredo Let Date: JAN 2016
Highway: SS 297 Let Status: Actual
Project ID: STP 2016(477) CSJ: 0299-01-067
Description: RESURFACE OF EXISTING HIGHWAY Handling
Code:
 
Limits From: GIBBS ST Fund Cat: 1
Limits To: GARFIELD ST Estimate: $50,253
Length: 0.3 Miles Actual: $53,756
 
District: Laredo Let Date: JAN 2016
Highway: US 277 Let Status: Actual
Project ID: NH 2016(478) CSJ: 0300-01-085
Description: RESURFACE OF EXISTING HIGHWAY Handling
Code:
 
Limits From: 1.044 MI EAST OF US 57 Fund Cat: 1
Limits To: 10.17 MI EAST OF US 57 Estimate: $2,994,379
Length: 9.1 Miles Actual: $2,612,948
 
District: Laredo Let Date: JAN 2016
Highway: US 277 Let Status: Actual
Project ID: NH 2016(478) CSJ: 0300-02-038
Description: RESURFACE OF EXISTING HIGHWAY Handling
Code:
 
Limits From: 10.17 MI EAST OF US 57 Fund Cat: 1
Limits To: MAVERICK/DIMMIT COUNTY LINE Estimate: $4,423,678
Length: 12.0 Miles Actual: $3,798,825
 
District: Laredo Let Date: JAN 2016
Highway: US 277 Let Status: Actual
Project ID: NH 2016(478) CSJ: 0300-03-066
Description: RESURFACE OF EXISTING HIGHWAY Handling
Code:
 
Limits From: FM 393 Fund Cat: 1
Limits To: SL 517 Estimate: $4,105,280
Length: 9.2 Miles Actual: $3,080,804
 
Back...

Totals for 0300-03-066
Length: 30.6 Miles
Estimate: $11,573,590
Actual: $9,546,333


Handling Code Definition
XX Project not processed through statewide letting
TR Transfer of funds
LC Project let through local entity
NC Project not charged against district apportionment



Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract