Stonewall County (FY 2016)

CCSJ: 0106-04-034

District: Abilene Let Date: FEB 2016
Highway: US 380 Let Status: Actual
Project ID: STP 2016(672)HES CSJ: 0106-04-034
Description: HIGH FRICTION SURFACE TREATMENT AND Handling
Code:
 
Limits From: 0.036 MI W OF FM 2211 Fund Cat: 8
Limits To: 0.346 MI E OF FM 2211 Estimate: $195,902
Length: 0.4 Miles Actual: $123,904
 
District: Abilene Let Date: FEB 2016
Highway: US 380 Let Status: Actual
Project ID: STP 2016(673)HES CSJ: 0298-02-023
Description: HIGH FRICTION SURFACE TREATMENT AND Handling
Code:
 
Limits From: 1.259 MI E. OF SH 208 Fund Cat: 8
Limits To: 1.764 MI E OF SH 208 Estimate: $248,524
Length: 0.5 Miles Actual: $160,863
 
District: Abilene Let Date: FEB 2016
Highway: FM 1054 Let Status: Actual
Project ID: STP 2016(674)HES CSJ: 0933-05-018
Description: HIGH FRICTION SURFACE TREATMENT AND Handling
Code:
 
Limits From: .813 MI S OFLYNN CL Fund Cat: 8
Limits To: 1.165 MI S OF LYNN CL Estimate: $165,284
Length: 0.4 Miles Actual: $105,966
 
District: Abilene Let Date: FEB 2016
Highway: SH 208 Let Status: Actual
Project ID: STP 2016(675)HES CSJ: 1361-02-024
Description: HIGH FRICTION SURFACE TREATMENT AND Handling
Code:
 
Limits From: 4.250 MI S OF US 380 Fund Cat: 8
Limits To: 4.822 MI S OF US 380 Estimate: $331,395
Length: 0.6 Miles Actual: $214,787
 
District: Abilene Let Date: FEB 2016
Highway: FM 1673 Let Status: Actual
Project ID: STP 2016(670)HES CSJ: 2189-01-015
Description: HIGH FRICTION SURFACE TREATMENT AND Handling
Code:
 
Limits From: 0.15 MI S OF CR 137 Fund Cat: 8
Limits To: 0.152 MI E OF CR 137 & FM 1673 Estimate: $141,272
Length: 0.3 Miles Actual: $89,723
 
Back...

Totals for 0106-04-034
Length: 2.2 Miles
Estimate: $1,082,377
Actual: $695,243


Handling Code Definition
XX Project not processed through statewide letting
TR Transfer of funds
LC Project let through local entity
NC Project not charged against district apportionment



Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract