Detail Letting Schedule for Bexar County (FY 2017)

Last Update: Monday, October 16, 2017
Bexar County (FY 2017)

CCSJ: 0024-08-128

District:SAN ANTONIOLet Date:Jan 2017
Highway:US 90Let Status:Actual
Project ID:STP 2017(331)HESCSJ:0024-08-128
Description:CONSTRUCT PEDESTRIAN BRIDGE OVER US 90Handling
Code:
 
Limits From:IH 410Fund Cat:8
Limits To:LP 13ESTIMATE:$2,319,953
Length:1.2Actual$2,331,043
 
Bid Tabulations
Back...
Totals for 0024-08-128
Length:1.2
Estimate:$2,319,953
Actual:$2,331,043

CCSJ: 0024-08-136

District:SAN ANTONIOLet Date:May 2017
Highway:US 90Let Status:Actual
Project ID:NH 1702(024)CSJ:0024-08-136
Description:UPGRADE FROM CONTINUOUS ILLUMINATION TO HIGH MASTHandling
Code:
 
Limits From:LOOP 13Fund Cat:1
Limits To:SH 151ESTIMATE:$1,238,240
Length:2.4Actual$864,247
 
District:SAN ANTONIOLet Date:May 2017
Highway:US 90Let Status:Actual
Project ID:NH 1702(024)CSJ:0024-08-137
Description:UPGRADE FROM CONTINUOUS ILLUMINATION TO HIGH MASTHandling
Code:
 
Limits From:IH 410Fund Cat:1
Limits To:LOOP 13ESTIMATE:$535,265
Length:0.8Actual$412,691
 
Proposal Request
List Showing Order
Bid List
Bid Tabulations
Award Status
Back...
Totals for 0024-08-136
Length:3.2
Estimate:$1,773,505
Actual:$1,276,938

CCSJ: 0025-02-212

District:SAN ANTONIOLet Date:May 2017
Highway:IH 10Let Status:Actual
Project ID:BR 1702(025)CSJ:0025-02-212
Description:CLEAN AND PAINT STEEL TRUSS, BRIDGE REPAIR, MILL, OVERLAY ANHandling
Code:
 
Limits From:IH 10 NFR AT CIBOLO CREEKFund Cat:6
Limits To:.ESTIMATE:$1,566,043
Length:0.0Actual$1,335,155
 
Proposal Request
List Showing Order
Bid List
Bid Tabulations
Award Status
Back...
Totals for 0025-02-212
Length:0
Estimate:$1,566,043
Actual:$1,335,155

CCSJ: 0072-07-041

District:SAN ANTONIOLet Date:May 2017
Highway:IH 10Let Status:Actual
Project ID:NH 2017(990)CSJ:0072-07-041
Description:EXPAND FROM 4 TO 8 LANE EXPRESSWAY-2 NEW GENERAL PURPOSE & 2Handling
Code:
 
Limits From:FM 3351Fund Cat:1
Limits To:1.40 MI S OF LEON SPRINGSESTIMATE:$42,433,632
Length:2.1Actual$38,906,439
 
District:SAN ANTONIOLet Date:May 2017
Highway:IH 10Let Status:Actual
Project ID:NH 2017(990)CSJ:0072-08-089
Description:EXPAND FROM 4 TO 8 LANE EXPRESSWAY-2 NEW GENERAL PURPOSE & 2Handling
Code:
 
Limits From:1.40 MI S OF LEON SPRINGS, SFund Cat:1
Limits To:LA CANTERAESTIMATE:$23,881,574
Length:3.1Actual$24,156,939
 
Proposal Request
List Showing Order
Bid List
Addenda
Bid Tabulations
Award Status
Back...
Totals for 0072-07-041
Length:5.2
Estimate:$66,315,206
Actual:$63,063,378

CCSJ: 0072-12-197

District:SAN ANTONIOLet Date:Feb 2017
Highway:IH 10Let Status:Actual
Project ID:NH 2017(560)CSJ:0072-12-197
Description:OVERLAY & PAVEMENT MARKINGS ON EB FRONTAGE ROADHandling
Code:
 
Limits From:CALLAGHANFund Cat:1
Limits To:WEST AVENUEESTIMATE:$1,431,599
Length:2.7Actual$1,177,188
 
Award Status
Bid Tabulations
Bid List
Back...
Totals for 0072-12-197
Length:2.7
Estimate:$1,431,599
Actual:$1,177,188

CCSJ: 0073-08-184

District:SAN ANTONIOLet Date:Feb 2017
Highway:US 281Let Status:Actual
Project ID:NH 2017(561)CSJ:0073-08-184
Description:OVERLAY & PAVEMENT MARKINGS ON NB & SB FRONTAGE ROADSHandling
Code:
 
Limits From:0.6 MI S OF NAKOMAFund Cat:1
Limits To:IH 410ESTIMATE:$1,838,760
Length:1.7Actual$1,512,876
 
District:SAN ANTONIOLet Date:Feb 2017
Highway:US 281Let Status:Actual
Project ID:NH 2017(561)CSJ:0253-04-152
Description:OVERLAY & PAVEMENT MARKINGS ON NB & SB FRONTAGE ROADSHandling
Code:
 
Limits From:BROOKHOLLOWFund Cat:1
Limits To:0.6 MI S OF NAKOMAESTIMATE:$2,113,701
Length:2.6Actual$1,735,745
 
Award Status
Bid Tabulations
Bid List
Back...
Totals for 0073-08-184
Length:4.3
Estimate:$3,952,461
Actual:$3,248,621

CCSJ: 0073-08-186

District:SAN ANTONIOLet Date:Oct 2016
Highway:IH 37Let Status:Actual
Project ID:NH 2017(155)CSJ:0073-08-186
Description:BASE REPAIR, SEALCOAT, OVERLAY AND PAVEMENT MARKINGSHandling
Code:
 
Limits From:IH 10Fund Cat:1
Limits To:IH 35ESTIMATE:$8,269,534
Length:3.1Actual$6,072,879
 
District:SAN ANTONIOLet Date:Oct 2016
Highway:IH 37Let Status:Actual
Project ID:NH 2017(155)CSJ:0073-08-187
Description:BASE REPAIR, SEALCOAT, OVERLAY AND PAVEMENT MARKINGSHandling
Code:
 
Limits From:FAIR AVENUEFund Cat:1
Limits To:IH 10ESTIMATE:$2,597,196
Length:0.9Actual$1,972,516
 
Back...
Totals for 0073-08-186
Length:4
Estimate:$10,866,731
Actual:$8,045,395

CCSJ: 0073-08-190

District:SAN ANTONIOLet Date:May 2017
Highway:IH 37Let Status:Actual
Project ID:NH 1702(030)CSJ:0073-08-190
Description:LANDSCAPE DEVELOPMENTHandling
Code:
 
Limits From:0.3 MILES S OF IH 410Fund Cat:10
Limits To:0.4 MILES N OF LP 13ESTIMATE:$501,500
Length:2.5Actual$557,600
 
Proposal Request
List Showing Order
Bid List
Bid Tabulations
Award Status
Back...
Totals for 0073-08-190
Length:2.5
Estimate:$501,500
Actual:$557,600

CCSJ: 0253-04-146

District:SAN ANTONIOLet Date:Feb 2017
Highway:US 281Let Status:Actual
Project ID:NH 2017(592)CSJ:0253-04-146
Description:EXPAND TO 6 LANE EXPRESSWAY WITH FRONTAGE RDS -4 GENERALHandling
Code:
 
Limits From:LP 1604Fund Cat:2M
Limits To:0.8 MI.NORTH OF STONE OAKESTIMATE:186,885,737
Length:3.8Actual179,542,332
 
District:SAN ANTONIOLet Date:Feb 2017
Highway:US 281Let Status:Actual
Project ID:STP 1602(378)CSJ:0253-04-151
Description:ROW ACQUISITIONHandling
Code:
 
Limits From:LP 1604Fund Cat:ROW
Limits To:0.8 MI.NORTH OF STONE OAKESTIMATE:$23,143,209
Length:3.6Actual$12,759,010
 
Award Status
Bid Tabulations
Bid List
Back...
Totals for 0253-04-146
Length:7.4
Estimate:$210,028,946
Actual:$192,301,342

CCSJ: 0521-04-278

District:SAN ANTONIOLet Date:May 2017
Highway:IH 410Let Status:Actual
Project ID:NH 2017(985)CSJ:0521-04-278
Description:OVERLAY & PAVEMENT MARKINGS ON EB FRONTAGE ROADHandling
Code:
 
Limits From:FREDRICKSBURG RDFund Cat:1
Limits To:IH 35ESTIMATE:$5,016,840
Length:10.5Actual$3,839,722
 
Proposal Request
List Showing Order
Bid List
Bid Tabulations
Award Status
Back...
Totals for 0521-04-278
Length:10.5
Estimate:$5,016,840
Actual:$3,839,722

CCSJ: 0521-05-118

District:SAN ANTONIOLet Date:Dec 2016
Highway:IH 410Let Status:Actual
Project ID:NH 1602(247)CSJ:0521-05-118
Description:RECONSTRUCT INTERCHANGE - PHASE 1Handling
Code:
 
Limits From:AT US 90 WESTFund Cat:1
Limits To:INTERCHANGEESTIMATE:$38,881,026
Length:0.4Actual$33,369,177
 
District:SAN ANTONIOLet Date:Dec 2016
Highway:IH 410Let Status:Actual
Project ID:NH 1602(247)CSJ:0521-04-277
Description:OPERATIONAL IMPROVEMENTS INCLUDING RAMP REVISIONSHandling
Code:
 
Limits From:0.1 MI N OF US 90Fund Cat:1
Limits To:0.3 MI S OF SH 151ESTIMATE:$45,165,661
Length:2.2Actual$38,980,576
 
District:SAN ANTONIOLet Date:Dec 2016
Highway:IH 410Let Status:Actual
Project ID:NH 2017(417)CSJ:0521-04-284
Description:ROW UTILITIES ADJUSTMENTSHandling
Code:
 
Limits From:0.1 MI N OF US 90Fund Cat:ROW
Limits To:0.3 MI S OF SH 151ESTIMATE:$1,780,105
Length:2.2Actual$1,565,942
 
District:SAN ANTONIOLet Date:Dec 2016
Highway:IH 410Let Status:Actual
Project ID:ROW 521-5-142CSJ:0521-05-142
Description:RIGHT OF WAY ACQUISITIONHandling
Code:
 
Limits From:AT US 90 WESTFund Cat:ROW
Limits To:INTERCHANGEESTIMATE:$24,895
Length:0.4Actual$13,706
 
Back...
Totals for 0521-05-118
Length:5.2
Estimate:$85,851,687
Actual:$73,929,402

CCSJ: 0915-00-178

District:SAN ANTONIOLet Date:Jul 2017
Highway:VALet Status:Actual
Project ID:STP 1702(555)CSJ:0915-00-178
Description:CONSTRUCT CURB RAMPS AT VARIOUS LOCATION IN BEXAR COUNTYHandling
Code:
 
Limits From:VARIOUS LOCATIONS IN BEXAR COUNTYFund Cat:10
Limits To:.ESTIMATE:$3,958,875
Length:0.0Actual$3,495,290
 
List Showing Order
Proposal Request
Bid List
Bid Tabulations
Award Status
Back...
Totals for 0915-00-178
Length:0
Estimate:$3,958,875
Actual:$3,495,290

CCSJ: 0915-00-180

District:SAN ANTONIOLet Date:Feb 2017
Highway:VALet Status:Actual
Project ID:STP 2017(565)CSJ:0915-00-180
Description:DISTRICTWIDE NON-SITE SPECIFIC TRAFFIC SIGNALS-FY 2017Handling
Code:
 
Limits From:DISTRICTWIDE TRAFFIC CNTRL FY 2017Fund Cat:1
Limits To:.ESTIMATE:$1,462,613
Length:0.0Actual$1,383,518
 
Award Status
Bid Tabulations
Bid List
Back...
Totals for 0915-00-180
Length:0
Estimate:$1,462,613
Actual:$1,383,518

CCSJ: 0915-00-186

District:SAN ANTONIOLet Date:Jul 2017
Highway:VALet Status:Actual
Project ID:STP 1702(556)CSJ:0915-00-186
Description:DISTRICTWIDE TRAFFIC SIGNAL REHAB/UPGRADEHandling
Code:
 
Limits From:VARIOUS LOCATIONS DISTRICTWIDEFund Cat:1
Limits To:.ESTIMATE:$3,860,673
Length:0.0Actual$2,664,497
 
List Showing Order
Proposal Request
Bid List
Bid Tabulations
Award Status
Back...
Totals for 0915-00-186
Length:0
Estimate:$3,860,673
Actual:$2,664,497

CCSJ: 0915-00-194

District:SAN ANTONIOLet Date:Feb 2017
Highway:VALet Status:Actual
Project ID:NH 2017(558)CSJ:0915-00-194
Description:INSTALLATION OF DYNAMIC MESSAGE SIGNS FOR EMERGENCYHandling
Code:
 
Limits From:ON IH 10 FROM CITY OF BOERNEFund Cat:1
Limits To:KIMBLE/KERR COUNTY LINEESTIMATE:$965,449
Length:0.0Actual$960,828
 
Award Status
Bid Tabulations
Bid List
Back...
Totals for 0915-00-194
Length:0
Estimate:$965,449
Actual:$960,828

CCSJ: 0915-00-203

District:SAN ANTONIOLet Date:Aug 2017
Highway:VALet Status:Actual
Project ID:STP 1702(573)CSJ:0915-00-203
Description:DISTRICTWIDE ITS OPERATION AND MAINTENANCE FY 2017Handling
Code:
XX
Limits From:DISTRICTWIDE ITS FY 2017Fund Cat:1
Limits To:.ESTIMATE:$2,000,000
Length:0.0Actual$2,000,000
 
Back...
Totals for 0915-00-203
Length:0
Estimate:$2,000,000
Actual:$2,000,000

CCSJ: 0915-00-204

District:SAN ANTONIOLet Date:Apr 2017
Highway:VALet Status:Actual
Project ID:STP 2017(894)CSJ:0915-00-204
Description:DISTRICTWIDE NON-SITE SPECIFIC TRAFFIC SIGNALS-FY 2017Handling
Code:
 
Limits From:DISTRICTWIDE TRAFFIC CNTRL FY 2017Fund Cat:1
Limits To:.ESTIMATE:$1,465,310
Length:0.0Actual$1,349,187
 
Proposal Request
List Showing Order
Bid List
Bid Tabulations
Award Status
Back...
Totals for 0915-00-204
Length:0
Estimate:$1,465,310
Actual:$1,349,187

CCSJ: 0915-12-513

District:SAN ANTONIOLet Date:Oct 2016
Highway:NRLet Status:Actual
Project ID:STP 2017(441)MMCSJ:0915-12-513
Description:ALAMO AREA COMMUTE SOLUTION PGM-FY 2016Handling
Code:
XX
Limits From:ALAMO AREA MPO: IN BEXAR, COMAL,Fund Cat:3
Limits To:GUADALUPE & PARTIAL KENDALL COUNTYESTIMATE:$267,000
Length:0.0Actual$267,000
 
Back...
Totals for 0915-12-513
Length:0
Estimate:$267,000
Actual:$267,000

CCSJ: 0915-12-518

District:SAN ANTONIOLet Date:Jul 2017
Highway:CSLet Status:Actual
Project ID:STP 1702(420)MMCSJ:0915-12-518
Description:CONSTRUCTION OF A HIKE & BIKE TRAIL THROUGH FRIENDSHIP PARKHandling
Code:
LC
Limits From:IN KIRBY IN FRIENDSHIP PARKFund Cat:3
Limits To:FROM OLD SEGUIN RD TO BINZ ENGLEMANESTIMATE:$509,196
Length:1.5Actual$479,359
 
Back...
Totals for 0915-12-518
Length:1.5
Estimate:$509,196
Actual:$479,359

CCSJ: 0915-12-557

District:SAN ANTONIOLet Date:Oct 2016
Highway:VALet Status:Actual
Project ID:STP 1602(549)TPCSJ:0915-12-557
Description:CONSTRUCT SIDEWALKS AND PEDESTRIAN IMPROVEMENTS NEAR POEHandling
Code:
LC
Limits From:IN SAN ANTONIO AT VARIOUS LOCATIONSFund Cat:3
Limits To:NEAR POE MIDDLE SCHOOLESTIMATE:$1,767,466
Length:0.0Actual$1,907,358
 
Back...
Totals for 0915-12-557
Length:0
Estimate:$1,767,466
Actual:$1,907,358

CCSJ: 0915-12-589

District:SAN ANTONIOLet Date:Feb 2017
Highway:CSLet Status:Actual
Project ID:STP 1702(020)FRS1CSJ:0915-12-589
Description:UPDATE RAIL SIGNALS, INSTALL CANTILEVERS ON E COMMERCE ATHandling
Code:
XX
Limits From:ON EAST COMMERCE - 452' SE OF IH 37Fund Cat:8
Limits To:1508' SE OF IH 37ESTIMATE:$585,367
Length:0.2Actual$585,367
 
Back...
Totals for 0915-12-589
Length:0.2
Estimate:$585,367
Actual:$585,367

CCSJ: 0915-12-590

District:SAN ANTONIOLet Date:Feb 2017
Highway:CSLet Status:Actual
Project ID:STP 1702(020)FRS1CSJ:0915-12-590
Description:INSTALL ISLAND GATES, INSTALL RAISED MEDIANS ON RITTIMAN RDHandling
Code:
XX
Limits From:ON RITTIMAN ROAD - IH 35Fund Cat:8
Limits To:750' WEST OF IH 35ESTIMATE:$126,371
Length:0.2Actual$126,371
 
Back...
Totals for 0915-12-590
Length:0.2
Estimate:$126,371
Actual:$126,371

CCSJ: 0915-12-591

District:SAN ANTONIOLet Date:Aug 2017
Highway:VALet Status:Actual
Project ID:NH 1702(678)CSJ:0915-12-591
Description:LANDSCAPE DEVELOPMENT AT VARIOUS LOCATIONS IN BEXAR COUNTYHandling
Code:
 
Limits From:VARIOUS LOCATIONS IN BEXAR COUNTYFund Cat:10
Limits To:.ESTIMATE:$528,886
Length:0.0Actual$510,193
 
List Showing Order
Bid List
Proposal Request
Bid Tabulations
Award Status
Back...
Totals for 0915-12-591
Length:0
Estimate:$528,886
Actual:$510,193

CCSJ: 0915-12-592

District:SAN ANTONIOLet Date:Aug 2017
Highway:VALet Status:Actual
Project ID:NH 1702(679)CSJ:0915-12-592
Description:LANDSCAPE DEVELOPMENT AT VARIOUS LOCATIONS IN BEXAR COUNTYHandling
Code:
 
Limits From:VARIOUS LOCATIONS IN BEXAR COUNTYFund Cat:10
Limits To:.ESTIMATE:$652,384
Length:0.0Actual$682,419
 
List Showing Order
Bid List
Proposal Request
Bid Tabulations
Award Status
Back...
Totals for 0915-12-592
Length:0
Estimate:$652,384
Actual:$682,419

CCSJ: 1477-01-040

District:SAN ANTONIOLet Date:Mar 2017
Highway:FM 1516Let Status:Actual
Project ID:STP 2017(798)MMCSJ:1477-01-040
Description:EXPAND FROM 2 TO 4 LANES WITH CONTINUOUS LT LANE, SDWLKS &Handling
Code:
 
Limits From:FM 78Fund Cat:1
Limits To:FM 1976ESTIMATE:$7,434,012
Length:0.8Actual$5,733,863
 
District:SAN ANTONIOLet Date:Mar 2017
Highway:FM 1516Let Status:Actual
Project ID:STP 1502(217)CSJ:1477-01-041
Description:ACQUISITION, RELOCATION ASSISTANCE AND UTILITY ADJUSTMENTSHandling
Code:
 
Limits From:FM 78Fund Cat:ROW
Limits To:FM 1976ESTIMATE:$6,565,135
Length:0.8Actual$1,655,043
 
Proposal Request
List Showing Order
Bid Tabulations
Bid List
Award Status
Back...
Totals for 1477-01-040
Length:1.6
Estimate:$13,999,147
Actual:$7,388,906

CCSJ: 1890-01-048

District:SAN ANTONIOLet Date:May 2017
Highway:FM 1976Let Status:Actual
Project ID:STP 1702(043)HESCSJ:1890-01-048
Description:IMPROVE TRAFFIC SIGNALS & SAFETY LIGHTING AT INTERSECTIONHandling
Code:
 
Limits From:AT MIDCROWNFund Cat:1
Limits To:.ESTIMATE:$287,736
Length:0.2Actual$217,052
 
District:SAN ANTONIOLet Date:May 2017
Highway:CSLet Status:Actual
Project ID:STP 1702(042)HESCSJ:0915-12-570
Description:INSTALL TRAFFIC SIGNALHandling
Code:
 
Limits From:ON INGRAM RDFund Cat:3
Limits To:AT RICHLAND HILLSESTIMATE:$228,366
Length:0.2Actual$188,898
 
Proposal Request
List Showing Order
Bid List
Bid Tabulations
Award Status
Back...
Totals for 1890-01-048
Length:0.4
Estimate:$516,102
Actual:$405,949

CCSJ: 2104-02-032

District:SAN ANTONIOLet Date:Sep 2016
Highway:FM 1957Let Status:Actual
Project ID:STP 2017(037)HESCSJ:2104-02-032
Description:INSTALL RAISED MEDIANHandling
Code:
 
Limits From:LOOP 1604Fund Cat:8
Limits To:FM 3487ESTIMATE:$1,015,260
Length:4.9Actual$979,020
 
Back...
Totals for 2104-02-032
Length:4.9
Estimate:$1,015,260
Actual:$979,020

CCSJ: 2230-01-016

District:SAN ANTONIOLet Date:Jan 2017
Highway:FM 1560Let Status:Actual
Project ID:STP 2017(477)CSJ:2230-01-016
Description:REPLACE EXISTING CULVERT WITH BRIDGEHandling
Code:
 
Limits From:0.8 MILES SOUTH OF SH 16Fund Cat:1
Limits To:1.1 MILES SOUTH OF SH 16ESTIMATE:$1,476,857
Length:0.3Actual$1,368,377
 
District:SAN ANTONIOLet Date:Jan 2017
Highway:FM 1560Let Status:Actual
Project ID:ROW 2230-1-22CSJ:2230-01-022
Description:UTILITY ADJUSTMENTSHandling
Code:
 
Limits From:0.8 MILES SOUTH OF SH 16Fund Cat:ROW
Limits To:1.1 MILES SOUTH OF SH 16ESTIMATE:$62,181
Length:0.3Actual$79,143
 
Bid Tabulations
Back...
Totals for 2230-01-016
Length:0.6
Estimate:$1,539,038
Actual:$1,447,520

CCSJ: 2230-01-018

District:SAN ANTONIOLet Date:Apr 2017
Highway:FM 1560Let Status:Actual
Project ID:STP 2016(752)MMCSJ:2230-01-018
Description:CONSTRUCT 2 LANE ROADWAY ON NEW LOCATIONHandling
Code:
 
Limits From:FM 1560Fund Cat:1
Limits To:SH 16ESTIMATE:$3,571,386
Length:0.2Actual$3,391,490
 
District:SAN ANTONIOLet Date:Apr 2017
Highway:FM 1560Let Status:Actual
Project ID:ROW 2230-1-19CSJ:2230-01-019
Description:ROW ACQUISITION & UTILITIES ADJUSTMENTSHandling
Code:
 
Limits From:FM 1560Fund Cat:ROW
Limits To:SH 16ESTIMATE:$1,442,902
Length:0.2Actual$28,195
 
Proposal Request
List Showing Order
Bid List
Bid Tabulations
Award Status
Back...
Totals for 2230-01-018
Length:0.4
Estimate:$5,014,288
Actual:$3,419,685

CCSJ: 2452-01-064

District:SAN ANTONIOLet Date:Jun 2017
Highway:SL 1604Let Status:Actual
Project ID:NH 1702(335)CSJ:2452-01-064
Description:INTERSECTION OPERATIONAL IMPROVEMENTSHandling
Code:
 
Limits From:AT SH 16Fund Cat:1
Limits To:.ESTIMATE:$6,501,049
Length:0.2Actual$7,603,813
 
District:SAN ANTONIOLet Date:Jun 2017
Highway:SL 1604Let Status:Actual
Project ID:ROW 2452-1-67CSJ:2452-01-067
Description:UTILITY ADJUSTMENTSHandling
Code:
 
Limits From:AT SH 16Fund Cat:ROW
Limits To:.ESTIMATE:$1,433,718
Length:0.5Actual$396,270
 
Proposal Request
List Showing Order
Bid List
Bid Tabulations
Award Status
Back...
Totals for 2452-01-064
Length:0.7
Estimate:$7,934,767
Actual:$8,000,083

CCSJ: 2452-02-115

District:SAN ANTONIOLet Date:May 2017
Highway:SL 1604Let Status:Actual
Project ID:NH 2017(992)CSJ:2452-02-115
Description:OVERLAY & PAVEMENT MARKINGS ON FRONTAGE ROADS & MAINLANESHandling
Code:
 
Limits From:SH 16Fund Cat:1
Limits To:ROGERS RANCHESTIMATE:$16,265,624
Length:9.2Actual$13,947,910
 
Proposal Request
List Showing Order
Bid List
Bid Tabulations
Award Status
Back...
Totals for 2452-02-115
Length:9.2
Estimate:$16,265,624
Actual:$13,947,910

Handling CodeDefinition
XXProject not processed through statewide letting
TRTransfer of funds
LCProject let through local entity
LCProject not charged against district apportionment



Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract