***** OFFICIAL NOTICE ***** *** STATE LET CONSTRUCTION CONTRACT *** COUNTY: WHARTON HIGHWAY: CR LENGTH: 0.213 MI CONTROL NUMBER: 0913-09-047, ETC DBE GOAL: 5.0 % PROJECT NUMBER: BR 2011(926), ETC TYPE: REPLACE BRIDGE AND APPROACHES TIME FOR COMPLETION: 150 WORKING DAYS GUARANTY: 24,000.00 BIDS RECEIVED UNTIL: 1:00 PM December 5, 2012 * EST.COST: 1,206,701.40 BIDS WILL BE OPENED: 1:00 PM December 5, 2012 MAIL OR DELIVER BIDS TO: FOR QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATION WOOLDRIDGE, MARK AUSTIN HQ - RIVERSIDE ANNEX 1512 FM 102 200 E RIVERSIDE ROOM 1B.1 WHARTON TX 77488 AUSTIN TX 78704-1204 (979)532-3141 (512)416-2498 ------------------------------------------------------------------------------ COUNTY CONTROL LIMITS FROM HIGHWAY PROJECT LIMITS TO ------------------------------------------------------------------------------ WHARTON 0913-09-047 AT BLUE CREEK # 1 CR 421 CR BR 2011(926) (CR 421) STR # AA04-00-001 LENGTH: 0.074 MILES WHARTON 0913-09-048 AT DRAW CR 1063 CR BR 2011(922) (CR 456) STR # AA06-42-001 LENGTH: 0.062 MILES WHARTON 0913-09-052 AT BLUE CREEK # 3 CR 400 CR BR 1102(037) (CR 421) STR # AA04-00-003 LENGTH: 0.077 MILES ------------------------------------------------------------------------------ ITEM DES S.P APPROXIMATE ALT NO. CD. NO. ITEM DESCRIPTION UNIT QUANTITIES ------------------------------------------------------------------------------ 100 2002 002 PREPARING ROW STA 11.360 110 2001 EXCAVATION (ROADWAY) CY 297.000 110 2002 EXCAVATION (CHANNEL) CY 716.000 132 2005 EMBANKMENT (FINAL)(ORD COMP)(TY C) CY 1,205.000 150 2002 BLADING HR 35.000 164 2001 002 BROADCAST SEED (PERM) (RURAL) (SANDY) SY 4,365.000 164 2009 002 BROADCAST SEED (TEMP) (WARM) SY 1,091.000 164 2011 002 BROADCAST SEED (TEMP) (COOL) SY 1,091.000 168 2001 VEGETATIVE WATERING MG 37.100 247 2042 033 FL BS (CMP IN PLC)(TY A GR 2)(FNAL POS) CY 522.000 400 2005 CEM STABIL BKFL CY 114.000 409 2002 PRESTR CONC PIL (18 IN SQ) LF 1,140.000 416 2001 DRILL SHAFT (18 IN) LF 80.000 416 2002 DRILL SHAFT (24 IN) LF 206.000 420 2003 002 CL C CONC (ABUT) CY 100.700 420 2004 002 CL C CONC (BENT) CY 24.900 420 2006 002 CL C CONC (RAIL FOUNDATION) CY 2.000 420 2029 002 CL S CONC (SLAB) CY 143.400 425 2014 001 PRESTR CONC SLAB BEAM (4SB12) LF 827.860 425 2016 001 PRESTR CONC SLAB BEAM (4SB15) LF 1,187.860 428 2001 001 CONC SURF TREAT (CLASS I) SY 900.000 432 2002 RIPRAP (CONC)(5 IN) CY 29.000 432 2033 RIPRAP (STONE COMMON)(DRY)(12 IN) CY 504.000 450 2161 001 RAIL (TY T223) LF 615.000 454 2004 ARMOR JOINT LF 58.000 460 2003 CMP (GAL STL 18 IN) LF 25.000 460 2004 CMP (GAL STL 24 IN) LF 12.000 460 2005 CMP (GAL STL 30 IN) LF 14.000 460 2009 CMP (GAL STL 48 IN) LF 9.000 464 2013 006 RC PIPE (CL III)(60 IN) LF 115.000 467 2360 SET (TY I)(30 IN)(3:1)(C) EA 1.000 467 2896 SET (TY II)(60 IN)(RCP)(6:1)(P)MOD EA 1.000 496 2009 REMOV STR (BRIDGE 0-99 FT LENGTH) EA 3.000 496 2016 REMOV STR (PIPE) EA 1.000 500 2001 011 MOBILIZATION LS 1.000 502 2001 033 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 10.000 540 2001 031 MTL W-BEAM GD FEN (TIM POST) LF 25.000 540 2012 031 MTL BEAM GD FEN TRANS (TL2) EA 12.000 544 2004 001 GDRAIL END TRT(INST)(WOOD POST)(TY I) EA 12.000 552 2001 WIRE FENCE (TY A) LF 792.000 644 2060 REMOVE SM RD SN SUP & AM EA 4.000 658 2259 INSTL DEL ASSM (D-SW)SZ (TYC)CTB(BI) EA 14.000 1122 2002 001 ROCK FILTER DAMS (INSTALL) (TY 2) LF 85.000 1122 2009 001 ROCK FILTER DAMS (REMOVE) LF 85.000 1122 2037 001 TEMPORARY SEDIMENT CONTROL FENCE INSTLL LF 1,464.000 1122 2057 001 TEMPORARY SEDIMENT CONTROL FENCE REMOVE LF 1,464.000 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $ 2,000.00