***** OFFICIAL NOTICE ***** *** STATE LET CONSTRUCTION CONTRACT *** COUNTY: CALDWELL HIGHWAY: FM 1977 LENGTH: 0.104 MI CONTROL NUMBER: 1434-03-010 DBE GOAL: 3.0 % PROJECT NUMBER: BR 2013(250) TYPE: REPLACE BRIDGES & APPROACHES TIME FOR COMPLETION: 80 WORKING DAYS GUARANTY: 22,000.00 BIDS RECEIVED UNTIL: 1:00 PM December 5, 2012 * EST.COST: 1,086,546.38 BIDS WILL BE OPENED: 1:00 PM December 5, 2012 MAIL OR DELIVER BIDS TO: FOR QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATION DILL, ROY AUSTIN HQ - RIVERSIDE ANNEX 174 SH 21 E. 200 E RIVERSIDE ROOM 1B.1 BASTROP TX 78602 AUSTIN TX 78704-1204 (512)321-2195 (512)416-2498 LIMITS FROM: SAN MARCOS RIVER LIMITS TO: (STR 1434-03-002) ------------------------------------------------------------------------------ ITEM DES S.P APPROXIMATE ALT NO. CD. NO. ITEM DESCRIPTION UNIT QUANTITIES ------------------------------------------------------------------------------ 100 2002 002 PREPARING ROW STA 5.500 104 2009 REMOVING CONC (RIPRAP) SY 44.000 110 2001 EXCAVATION (ROADWAY) CY 491.000 132 2005 EMBANKMENT (FINAL)(ORD COMP)(TY C) CY 176.000 160 2003 FURNISHING AND PLACING TOPSOIL (4") SY 1,389.000 164 2007 002 BROADCAST SEED (PERM) (URBAN) (CLAY) SY 1,389.000 168 2001 VEGETATIVE WATERING MG 28.000 247 2366 033 FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS) CY 372.000 275 2001 003 CEMENT TON 52.000 275 2010 003 CEMENT TREAT (SUBGRADE) (8") SY 1,294.000 275 2031 003 CEMENT TREAT (NEW BASE) (10") SY 1,294.000 310 2002 PRIME COAT (AE-P) GAL 259.000 316 2706 016 ASPH (TIER II) GAL 777.000 316 2718 016 AGGR (TIER II) CY 22.000 416 2002 DRILL SHAFT (24 IN) LF 495.000 416 2003 DRILL SHAFT (30 IN) LF 588.000 420 2003 002 CL C CONC (ABUT) CY 28.000 420 2004 002 CL C CONC (BENT) CY 84.700 420 2029 002 CL S CONC (SLAB) CY 126.800 420 2033 002 CL S CONC (APPR SLAB) CY 61.200 425 2016 001 PRESTR CONC SLAB BEAM (4SB15) LF 1,979.800 428 2002 001 CONC SURF TREAT (CLASS II) SY 892.400 432 2021 RIPRAP (STONE PROTECTION)(18 IN) CY 212.000 432 2039 RIPRAP (MOW STRIP)(4 IN) CY 17.000 432 2050 RIPRAP (CONC)(CL B)(5 IN) CY 14.000 450 2161 001 RAIL (TY T223) LF 480.000 450 2166 001 RAIL (TY C223) LF 240.000 459 2002 GABIONS (GALV) CY 37.000 459 2011 GABION MATTRESSES (GALV)(12 IN) SY 118.000 464 2003 RC PIPE (CL III)(18 IN) LF 95.000 467 2234 SET (TY II)(18 IN)(RCP)(6:1)(C) EA 4.000 496 2004 REMOV STR (SET) EA 2.000 496 2007 REMOV STR (PIPE) LF 60.000 496 2010 REMOV STR (BRIDGE 100-499 FT LENGTH) EA 1.000 500 2001 011 MOBILIZATION LS 1.000 502 2001 033 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 5.000 530 2010 006 DRIVEWAYS (CONC) SY 146.000 540 2001 031 MTL W-BEAM GD FEN (TIM POST) LF 124.000 540 2011 031 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 4.000 540 2036 031 DRIVEWAY TERMINAL ANCHOR SECTION EA 2.000 544 2001 GUARDRAIL END TREATMENT (INSTALL) EA 2.000 560 2013 001 MAILBOX INSTALL-D (TWG-POST) TY 2 FND EA 1.000 644 2001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 5.000 644 2005 IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT) EA 2.000 644 2060 REMOVE SM RD SN SUP & AM EA 7.000 658 2241 INSTL DEL ASSM (D-SW)SZ 1(FLX)GF2(BI) EA 14.000 658 2259 INSTL DEL ASSM (D-SW)SZ (TYC)CTB(BI) EA 6.000 666 2012 REFL PAV MRK TY I (W) 4" (SLD)(100MIL) LF 1,200.000 666 2111 REFL PAV MRK TY I (Y) 4" (SLD)(100MIL) LF 1,200.000 666 2145 REF PAV MRK TY II (W) 4" (SLD) LF 1,200.000 666 2178 REF PAV MRK TY II (Y) 4" (SLD) LF 1,200.000 672 2015 034 REFL PAV MRKR TY II-A-A EA 15.000 1018 2001 TREE PROTECTION EA 3.000 1122 2002 001 ROCK FILTER DAMS (INSTALL) (TY 2) LF 60.000 1122 2009 001 ROCK FILTER DAMS (REMOVE) LF 60.000 1122 2037 001 TEMPORARY SEDIMENT CONTROL FENCE INSTLL LF 560.000 1122 2057 001 TEMPORARY SEDIMENT CONTROL FENCE REMOVE LF 560.000 6834 2001 001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 42.000 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $ 6,000.00