Public Meeting - Woodrow Bean/Transmountain Road (Loop 375)
Skip to main content

Public Meeting - Woodrow Bean/Transmountain Road (Loop 375)

Where: Canutillo High School
6675 South Desert Boulevard
El Paso, TX 79912
 
When: Wednesday, March 10, 2010
6 p.m. - 8 p.m.
 
Purpose: The purpose of the meeting is to present new design information and to solicit public comments for the proposed improvements to Loop 375 from I-10 to east of the Franklin Mountains State Park entrance, a distance of approximately 3.6 miles.
 
Description: The proposed improvements consist of expanding the current two-lane undivided roadway to a four-lane divided roadway with two-lane frontage roads. The improvements also include grade separated intersections at Northwestern Drive, Resler Drive, Plexxar Drive and Paseo del Norte Drive as well as two direct connectors from Loop 375 to I-10 and from I-10 to Loop 375. As part of this project shared bicycle/pedestrian paths will be constructed separate from the roadways, near the Loop 375 right-of-way line, between the intersections of Northwestern and Paseo del Norte.
Downloads:
Contact:

TxDOT El Paso District
Public Information Office
Phone: (915) 790-4200