TxDOT, in cooperation with the Central Texas Regional Mobility Authority (CTRMA), prepared an environmental assessment (EA) for proposed improvements to U.S. Highway (US) 290 between US 183 and State Highway (SH) 130.
The Federal Highway Administration (FHWA) approved the EA as satisfactory for further processing on July 1, 2008, and a public hearing was held on August 12, 2008. The table below contains links to the US 290 Public Hearing Summary and Analysis and the Comment Response Report.
| Title | |
| Public Hearing Summary and Analysis | |
| Comment Response Report | |
| Appendices A - E |
