Before a project is built, a study must be done to determine if it will fill a transportation need, will not negatively impact the surrounding area and fits the department's overall plan. During the study phase, potential projects are analyzed to determine if they are cost-effective while also efficiently improving mobility. Some of these projects have moved beyond the study phase and are under construction.
| Location | Project | Description |
| El Paso | I-10 Operational Improvements | Widen I-10 between Viscount Boulevard and Zaragoza Road. |
| El Paso | SH 20 (Alameda) - Phase II | Intersection improvements to SH 20 at US 62 |
| El Paso | I-10 Collector-Distributor Lanes | Construct collector-distributor (c-d) lanes and improvements to the I-10 and US 85 interchange |
| El Paso | Spur 1966 | A new connection between Schuster Avenue on the UTEP campus and Paisano Drive via a bridge over I-10 |
| El Paso | Loop 375 - Border Highway West | Proposed construction of a new four-lane controlled access toll facility that connects Loop 375 to US 85 |
| El Paso | Loop 375 - Transmountain West | Improvements from I-10 to east of the Franklin Mountains State Park Entrance |
| El Paso | Loop 375 - Franklin Mountains State Park Entrance | Proposed Improvements to the entrance of Franklin Mountains State Park |
| El Paso | Comprehensive Mobility Plan | An overall mobility strategy affecting El Paso and the surrounding area |