FM 2978 at FM 2920
Skip to main content

FM 2978 at FM 2920

The scope of this study is 2.5 miles from Farm-to-Market (FM) 2978 from FM 2920 to Dobbin Hufsmith Road.

Proposed improvements

Proposed improvements include widening the roadway from 2 to 5 lanes.

Partners

This study is a partnership between TxDOT and the Federal Highway Administration.