Objectives
The main objectives of the Lufkin US 59 North/Loop 287 project are to:
Background
TxDOT and Brown and Gay Engineers (BGE) presented five alternatives for this project at a public meeting held in September 2006. As a result of public comments and other design-related issues, Alternative 5 was selected for continued study.
After a value engineering study was conducted, several changes were incorporated into the design.