Project Studies: Houston District

Before a project is built, a study must be done to determine if it will fill a transportation need, will not negatively impact the surrounding area and fits the department's overall plan. During the study phase, potential projects are  analyzed to determine if they are cost effective, while also efficiently improving mobility. Some of these projects have moved beyond the study phase and are under construction.

Location Project Description
Brazoria County FM 2234 Improvements to FM 2234 from FM 521 to SH 288.
Dickinson FM 646 Widening FM 646 from I-45 to SH 146.
Fort Bend County FM 359 Improvements to FM 350 at US 90A and the Union Pacific Railraod.
Fort Bend County SH 36 and Spur 10 Constructing additional lanes on SH 36 from FM 2218 to FM 1495 and extending Spur 10 south of US 59.
Fort Bend County SH 6 Improvements to SH 6 in Sugar Land and Missouri City.
Fort Bend County US 90A Expanding US 90A from SH 6 to Loop 762.
Harris County FM 1960 Constructing a grade separation at the BNSF rail crossing.
Harris County FM 521 Improvements to FM 521 from BW 8 to FM 2234.
Harris County Gosling Road The proposed construction of Gosling Road from Kuykendahl Road to FM 2920.
Harris County Port Road Port Road from SH 146 to Todville Road
Harris County SH 146 Expanding SH 146 from Red Bluff to FM 518.
Harris County SH 288 The expansion of SH 288 from US 59 to CR 60.
Houston Business 90U The proposed widening of Business Highway 90U from I-610 to east of Mesa Road.
Houston CR 101 at SH 288 The proposed building of a grade separation of CR 101 at SH 288.
Houston FM 524 The redesign of FM 524 between I-25 and CR 359.
Houston FM 529 Improvements to FM 529 from Greenhouse Road to the proposed Grand Parkway.
Houston FM 865 Enhancements to FM 865 from Almeda-Genoa Road to FM 518.
Houston FM 1960 Proposed improvements to FM 1960 from BF 1960A to FM 2100.
Houston FM 1960 at I-45 Proposed improvements to FM 1960 from SH 249 to I-45.
Houston FM 2100 Added lanes to FM 210 from Diamondhead Drive to Hufffman-New Caney Road.
Houston FM 2978 Additional lanes on FM 2978 from Dobbin-Hufsmith Road to FM 1488.
Houston FM 2978 at FM 2920 Additional lanes on FM 2978 from FM 2920 to Dobbin-Hufsmith Road.
Houston FM 3083 Construction of median, shoulders and grade separation over UPRR.
Houston Freight Rail Study Studying the needs of freight rail in the Houston area.
Houston I-10 Exploring the possibility of a holding pond at White Oak Bayou.
Houston I-10 Managed Lanes Exploring extending the use of managed lanes on I-10 from SH 6 to FM 359.
Houston I-45 Evaluating the need for additional lanes on I-45 from FM 830 to FM 1375.
Houston I-45 and I-610 Proposed improvements to the I-45 and I-610 interchange.
Houston SH 332 Enhancements to SH 332 from SH 288 to BU 288.
Humble BF 1960A The widening of BF 1960A from Lee Road to FM 1960.
Lake Jackson FM 2004 Enhancements to FM 2004 from SH 288 to BS 288B.
Montgomery County Loop 494 Widening Loop 494 from Kingwood Drive to Sorter's McClellan Road.
Montgomery County SH 249 Construction of a toll road from FM 1774/FM 149 in Pinehurst to FM 1774 at Todd Mission.
Pearland CR 403 Improvements to CR 403 from CR 94 to FM 865.
Rosenberg SH 36 Expanding SH 36 from US 59 to FM 2218.
Waller County FM 1488 The proposed widening of FM 1488 from Joseph Road to FM 2978.
Waller County FM 1774 Improvements to FM 1774 from Mill Creek Drive to FM 149.
Waller County I-10 Studying the future needs of I-10 from FM 359 to FM 3538.

Back button