I-369/Marshall Area MapThe I-69 System (I-369) Harrison County/Marshall Route Study will, with substantial citizen and community participation, determine options for the development of I-369 in the Marshall area. The goal is to construct, designate and sign US 59 as I-369.

The study includes two broad options:

  • Upgrade existing US 59 through Marshall to an interstate highway (I-369), or
  • Construct I-369/US 59 at a new location and convert the existing US 59 through Marshall to Business 59.

TxDOT expects completion of the study in late 2014.

The I-69 System (I-369) Harrison County/Marshall Working Group

The I-69 System (I-369) Harrison County/Marshall Working Group was created to provide input and recommendations on the route study. Since February 2014, the group has met regularly. It identified:

  • Goals for establishing I-369 in the Marshall area related to traffic safety, connectivity and community impacts
  • Potential interstate route options
  • A preliminary, recommended interstate route option to study as part of the environmental process

Public Outreach

The working group meets regularly to gather feedback from local citizens to learn about concerns and issues that may need to be addressed. Read more about the study and complete the survey linked below.

Exhibits

Next Steps
  1. The working group will make recommendations for further study as part of the environmental process.
  2. After completion of the environmental process, funding will be identified and the design of the roadway will begin. 
  3. Construction would most likely be phased depending on funding.

Your Input is Needed!

The deadline to comment on the study is Nov. 7, 2014. There are three ways to submit your feedback:

For more information, contact TxDOT by email or call (903) 799-1308.