Location Project/Study Phase Description
All Bryan District counties Active Transportation Preliminary Design Planning and development of Active Transportation (bicycle and pedestrian facilities) in the ten-county Bryan District area.
11 counties between Belton County to Walker County I-14 Central Texas Corridor Study Feasibility Study A study to align the ongoing I-14 development and planning efforts to ensure consistency and continuity of the interstate corridor from west Texas to Louisiana.
Brazos County Inner Loop Study East Feasibility Study A new proposed alignment connecting SH 6 east of FM 2818 in Bryan, cross SH 30 south of Elmo Weedon Road and connect with the William D Fitch Parkway in College Station.
Brazos County South College Avenue Connectivity Study Feasibility Study Identify safety and mobility improvements in the area from Wellborn Road to Texas Avenue (BS 6-R) between University Drive (FM 60) and West Villa Maria Road (FM 1179)
Brazos County FM 159 Realignment Preliminary Design The project proposes to realign a segment of FM 159 on a new location near Allen Farm and Hidalgo Falls to avoid the northward progression of the Brazos River which is approaching the existing alignment in this area.
Brazos County SH 47 at SH 21 Interchange Preliminary Design The project would construct a new interchange to enhance safety, reduce congestion, maintain local connectivity and improve mobility at the SH 47 and SH 21 interchange.
Brazos County FM 1688 (Leonard Road) Widening Preliminary Design Widening of FM 1688 (Leonard Road) from SH 47 to FM 2818 (Harvey Mitchell Parkway) in Brazos County, Texas.
Brazos County SH 30 (Harvey Road) Widening Preliminary Design Widening of SH 30 (Harvey Road) from SH 6 to FM 158 in Brazos County, Texas.
Brazos County FM 2154 (Wellborn Road) Widening Preliminary Design In collaboration with the city of College Station is proposing improvements to FM 2154 (Wellborn Road) from SH 40 (William D. Fitch Parkway) to Greens Prairie Road.
Brazos County FM 1179 Widening Preliminary Design The project would widen FM 1179 from Easterling Drive to FM 158 (Boonville Road) in Brazos County, Texas.
Brazos County SH 6 Central BCS Design Planning for improvements to SH 6 from US 190/SH 21 to SH 40/Willian D. Fitch.
Brazos County FM 2347 Project Design Improvements to the intersection of George Bush Drive, Wellborn Road and the Union Pacific Railroad.
Brazos County BS-6R (Texas Avenue) Improvements Project Construction/Design Development to improve safety and mobility along BS-6R (Texas Avenue) from Old Hearne Road to FM 60 (University Drive).
Brazos County FM 158 (William J. Bryan Parkway) Construction Safety and mobility improvements for FM 158 (William J. Bryan Parkway) from SH 6 to BS 6-R (Texas Ave).
Brazos County FM 2818 (Harvey Mitchell Parkway) Widening Project Construction Increase capacity from a four-lane divided roadway to a six-lane divided freeway from University Drive (FM 60) to George Bush Drive (FM 2347).
Brazos County FM 1179 (E Villa Maria Road and Briarcrest Drive) Raised Medians Construction Complete The project would construct raised medians on FM 1179 to enhance safety within this section of roadway.
Brazos and Robertson counties US 190/SH 6 Alignment Study Preliminary Design Evaluate the feasibility options to improve this corridor's safety and mobility.
Burleson and Brazos counties SH 21 Intersection Improvements Design Improvements to the intersections at FM 50 South, FM 50 North and OSR along SH 21.
Burleson County FM 60 at the Union Pacific Bridge Design Proposal to improve FM 60 at the Union Pacific Bridge in Burleson County.
Freestone County I-45 Fairfield Construction Improve traffic flow and safety of the frontage road along I-45 in the Fairfield area.
Grimes County SH 105 Widening Project Preliminary Design Proposed improvements to reduce congestion, enhance safety, and improve regional mobility along the SH 105 corridor.
Grimes County SH 6 and FM 2 Intersection Construction Proposing improvements to the intersection of SH 6 and FM 2.
Leon County US 79 Leon County (Jewett to Buffalo) Design Increase capacity from a two-lane undivided roadway to a four-lane divided roadway.
Madison County SH 21 West Madison County Design Increase capacity from a two-lane undivided roadway to a four-lane divided roadway.
Madison County SH 21 Relief Route Madisonville Design A relief route is being studied to increase mobility.
Robertson County US 79 at the Little Brazos River Design Replace the bridge over the Little Brazos River and provide improvements to US 79 in Hearne.
Robertson County SH 6/US 79 Hearne Relief Route Study Feasibility Study Feasibility study on potential locations for a route to alleviate congestion and enhance safety around the City of Hearne in Robertson County, Texas. 
Walker County New Waverly Transportation Study Feasibility Study Study transportation improvements in and around New Waverly.
Washington County US 290 Improvements Preliminary Design  Plans to improve various crossings along US 290 between FM 1371 and FM 577 in Washington County, Texas
Washington County BS 36J Raised Medians Preliminary Design Enhance safety along BS 36J (also known as S Day Street) from W Stone Street to US 290 by replacing the existing center left-turn lane with raised medians and dedicated left-turn lanes at selected locations.
Washington County US 290/SH 36 Interchange Design - Build Develop design concepts to improve the intersection of US 290/SH 36.
Washington County US 290 Improvement Project - FM 1155 Intersection Study (Chappell Hill) Construction (Interim Solution) / Preliminary Design (Long-Term Solution) The purpose of the proposed widening project is to improve mobility and enhance safety within the project corridor.

I-45 Corridor Program projects

To improve safety and mobility along critical sections of Interstate 45 (I-45), TxDOT Bryan has begun planning improvements between Houston and Dallas. 

Location Project/Study Phase Description
Leon County I-45 Leon County Project (Segments 10 and 11) Preliminary Design Improve safety and mobility along 90.4 miles of I-45 through Walker, Madison, Leon and Freestone counties.
Walker, Madison, Leon and Freestone counties I-45 Corridor Program Ongoing Development Planning and development of safety and mobility improvements on more than 90 miles of I-45 through Walker, Madison, Leon and Freestone counties.
Walker County I-45 Central Walker County Project (Segment 2A & 2B) Design Widen interstate to six lanes and other various improvements.
Walker County I-45 North Walker County Project (Segment 3) Preliminary Design Update the roadway to current design standards, increase its capacity to accommodate future traffic volumes, and improve access for local travelers.