Purpose  
The Texas Department of Transportation (TxDOT) Houston District and the City of Webster are proposing to construct an extension of NASA 1 from just south of FM 528 to approximately 0.25 mile west of Interstate Highway 45 (I-45) at North Landing Boulevard, in the cities of League City and Webster, Harris County, Texas. This notice is affording an opportunity to comment as part of the environmental review process for this project. If you are a property owner, you are receiving this notice because records indicate that you own property that (1) would be acquired (in part or in whole) for this project or (2) is adjacent to the project. This notice and opportunity to comment is also being provided to affected local governments and public officials. 
Description

The proposed project would construct a roadway on new location, consisting of four (4) 12-foot wide lanes (two in each direction), divided by a raised median that varies from 4 feet to 32 feet in width, from just south of FM 528 to approximately 0.25 mile west of I-45 at N. Landing Boulevard. The proposed project would also include a roundabout (traffic circle), a 5-foot-wide sidewalk, a 10-foot-wide shared-used path (SUP), and an approximately 1.5-acre detention basin. The proposed project is approximately 0.65 mile in length and would require approximately 10 acres of new right of way, plus approximately an additional one (1) acre of permanent easement. This proposed extension of NASA 1 is anticipated to provide enhanced connectivity and transition to W. NASA Boulevard and I-45 via Landing Blvd.

Although additional right of way would be required, no residential or non-residential structures are anticipated to be displaced at this time. For information concerning services and benefits available to affected property owners and information about the tentative schedule for right of way acquisition and construction, please contact David Glasco, City of Webster Manager of Engineering & Construction at 281-316-4139. 

For more information on how to access documents in person please see refer to the Notice in the Additional Information section below. 

CSJ/Propject reference number 0912-72-541
Accessibility TxDOT makes every reasonable effort to accommodate the needs of the public. The notice and opportunity to comment is posted in English and Spanish. If you have a special communication accommodation or need for an interpreter, a request can be made. If you have a disability and need assistance, special arrangements can also be made to accommodate most needs. Please call TxDOT’s Environmental Specialist at 713-802-5267 at least three business days before the date on which you would like to review the project materials or submit information. Please be aware that advance notice is requested as some accommodations may require time for TxDOT to arrange.
Additional information
How to make a comment

 

Please reference the project number CSJ: 0912-72-541

  • Email:  PIO Email
  • Mail:
    TxDOT Houston District Office
    Attn: CSJ: 0912-72-541
    7600 Washington Ave.
    Houston, TX 77007
Memorandum of Understanding The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated Dec. 9, 2019, and executed by FHWA and TxDOT.