CapEx Central Downtown
Alternative Delivery projects
TxDOT has transitioned from design-build to design-bid-build for the entirety of the I-35 CapEx Central project.
TxDOT will be posting a Wave 2 PS&E contract for the previous design-build limits (US 290 East to Holly Street). This decision was made under careful consideration and in the best interest of the agency.
Visit the project page for more information on the I-35 Capital Express Central Project.